Streamline® ACR Copper Press Fittings Installation Instructions

Installers must be qualified, licensed within the jurisdiction, and familiar with the installation of ACR press systems. The following list of items are needed for the installation of the Streamline® ACR Copper Press Fittings:

Note: An Installation Instruction video is available on Mueller Streamline Co.'s YouTube Channel. ▶️

Step 1: Cut Copper Tube

Cut copper tube square at a 90-degree angle using a tube cutter or a fine tooth saw.

Step 2: Deburr Tube

Deburr tube ID & OD using a deburring tool. Ensure tube ends are free of any burrs or sharp edges.

Step 3: Clean and Smooth Tube End

Clean and smooth the end of the tube surface using an abrasive pad. The tube surface should be free of indentation, scratches, deformations, oxidation, dirt, and debris.

Step 4: Mark Insertion Depth

Mark the copper tube to the proper fitting insertion depth with the Streamline® ACR Press Gauge or use the insertion depth chart. If following the insertion depth chart, use a ruler or other measuring device to measure the correct insertion depth, marking with a permanent marker.

Step 5: Inspect Fitting Seals

Check both fitting beads to ensure two seals per cup are present. Inspect for obvious damage such as nicks or tears. If the O-ring appears to be damaged, is out of position, or missing, do not use the fitting and use a new one. Fittings should remain in a resealable bag until ready to use to avoid any dirt or debris from getting into the system.

Step 6: Insert Fitting onto Tube

Slightly rotate the fitting while sliding it onto the tube. Slide all the way to the insertion mark & make contact with the stop.

Step 7: Press Fitting

7a. Standard Pressing: Place the correct size Streamline® ACR press jaw over both beads at a right angle to the tube. Start the pressing process. Refer to the tool manufacturer for tool instructions. ⚙️

7b. For 1-1/8" Fittings: Use the Streamline® ACR Press Ring, Ring Jaw, and compatible full-sized press tool. Place the Press Ring over both beads at a right angle to the tube. Use the ring jaw to start the pressing process.

Step 8: Verify Connection

Verify the connection is secure using the Streamline® ACR Press Gauge on the o-ring beads. Rotate the gauge to avoid interference with flashing. If the press gauge is unable to fit through the slot on the fitting, it was under-crimped. Attempt to re-crimp to correct the joint. If a fitting is still under-crimped, then it must be removed and the procedure restarted. ✔️

Streamline® ACR Press Fitting Insertion Depth Chart (1/4" to 1-1/8")

Tube Size (OD) 1/4" 3/8" 1/2" 5/8" 3/4" 7/8" 1-1/8"
Insertion Depth 1" 1-1/16" 1-3/16" 1-5/16" 1-3/8" 1-7/16" 1-1/2"

Important Warnings

WARNING: Failure to follow all instructions could affect joint/system integrity and may lead to property damage. Call Customer Service at 1-800-FITTING if you have any questions or need assistance. ?

Safety Note Tool and Jaw Compatibility
Jaw and hand protection must be worn. ? WARNING: With approved press tool & jaws, such as the Milwaukee® Streamline® ACR Press Jaws. Failure to use correct jaws will affect joint/system integrity & may lead to property damage. Please see specific tool manufacturer for tool instruction.
Models: ACR, ACR Copper Press Fittings, Copper Press Fittings, Press Fittings, Fittings

PDF preview unavailable. Download the PDF instead.

53fbb9ddae5b57c55bd2bd0e698d74559e992374 InstallSheet 78ODCPDS45 Adobe PDF Library 16.0.3 PDF Presentation Adobe Photoshop

Related Documents

Preview Streamline Copper Tube: Specifications, Applications, and Installation Guide
Detailed technical specifications, working pressure data, and installation instructions for Streamline copper tubes (Types K, L, M, DWV) used in plumbing and mechanical applications. Covers material standards, safety certifications, and soldering best practices.
Preview STREAMLINE 600GPD-F Filterplus Water Filtration System: Installation and Warranty Guide
Comprehensive instruction manual for the STREAMLINE 600GPD-F Filterplus Reverse Osmosis Water Filtration System, covering installation, maintenance, warranty, and product features.
Preview Streamline Pole Repair Instructions
Instructions for fitting a pole collar to a pole section using Streamline's Penloc adhesive.
Preview Streamline Smartank 2 Instruction Manual
Comprehensive instruction manual for the Streamline Smartank 2 system, covering setup, operation, maintenance, troubleshooting, and warranty information.
Preview Streamline 36 in. Amendola Convertible Undermount Range Hood Owner's Manual & Installation Guide
This owner's manual and installation guide provides comprehensive instructions for the Streamline 36 in. Amendola Convertible Undermount Range Hood. It covers safety, electrical, warranty, installation, operation, and maintenance, including filter and light replacement.
Preview Streamline SFC16 Pump Controller Instruction Manual
Comprehensive instruction manual for the Streamline SFC16 pump controller, covering wiring, operation, setup, calibration, controller messages, company benefits, and warranty information.
Preview STREAMVAC™ Internal Vacuuming System Kit Instruction Manual
Comprehensive instruction manual for the STREAMVAC Internal Vacuuming System Kit, detailing setup, safety precautions, maintenance, and warranty information. Includes model codes DV-KIT4175-032 and DV-KIT4175-038.
Preview Streamline Powerdrive 3 Instruction Manual: Operation, Safety, and Maintenance Guide
Comprehensive instruction manual for the Streamline Powerdrive 3 electric hose reel system. Covers setup, operation, safety regulations, troubleshooting, maintenance, and warranty information.