PLANET-logo

PLANET NMS-360V Renewable Energy Management Controller with LCD Touch Screen

PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-ScreenPackage Contents

Thank you for purchasing PLANET Universal Network Management Controller. PLANET NMS-360V comes in two sizes as described below:

  • NMS-360V-12: Renewable Energy Management Controller with 12″ LCD Touch Screen
  • NMS-360V-10: Renewable Energy Management Controller with 10″ LCD Touch Screen

Package Contents:

  • The NMS-360V Controller x 1
  • Quick Installation Guide x 1
  • Adapter with Power Cord x 1
  • Installation Kit x 1

If any item is found missing or damaged, contact your local reseller for replacement.

Hardware Description

PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-1

Physical Specifications

Model NMS-360V-10 NMS-360V-12
Dimensions (W x D x H) 285 x 49 x 189 mm 319 x 51.7 x 245 mm
Weight 2 kg 2.9 kg

NMS-360V-10 (10” Panel)PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-2

NMS-360V-12 (12” Panel)PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-3

VESA Mounting
The NMS-360V series is designed to be VESA-mounted as shown in the picture. Just carefully place the LCD stand on the back of the controller and tighten the given screws to secure the mounting.PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-4

Panel Mounting
There are eight holes located along the four sides of the NMS-360V. Insert the clamp from the four sides and tighten them with the nuts provided.PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-5

Product Features

Network Devices Management

Dashboard Providing the at-a-glance view of system, power, traffic,

and device event statuses.

Device List Providing devices status overview and managed function.
Setup Wizard Easy to use step-by-step guidance.
Node Discovery Management is carried out once a BSP-360-powered device is detected.
App-like Device Viewing App-like devices that are compliant with SNMP, MQTT, and Smart Discovery.
Event Table The status of system can be reported via event alarm.
Alarm System E-mail alerts for the administrator via the SMTP server.
Device Provisioning Enabling BSP-360 to be configured and upgraded at the

same time.

Site Map Real-time site map of BSP-360 and IP cams on the user-

defined map to optimize energy deployment.

Remote PoE control Real-time remote PoE on/off to reboot connected devices.
User Control Allowing on-demand account creation and user-defined

access policy.

Scalability Free system upgrade and BSP-360 firmware bulk upgrade

capability.

Maximum Scalability 1 site map, 512 nodes, 2048 managed IP cameras.

Network Management Characteristics

  • Built-in DHCP Server
  •  Built-in RADIUS Server
  • SSL secure access
  • Web-based GUI management interface
  • SNMP v1, v2c, and v3 management
  • Supports PLANET DDNS/Easy DDNS

Specifications

 

Product

NMS-360V-10 NMS-360V-12
Renewable Energy Management Controller with LCD Touch Screen
Platform
Form Factor Panel Mount, VESA 100 x 100
Physical Specifications
 

 

 

 

I/O Interface

2 10/100/1000BASE-T Gigabit Ethernet RJ45 ports
2 USB 3.0 ports

(They cannot be used at the same time.)

1 Audio Line Out (reserved)
1 HDMI interface
2 DB-9 COM1,COM2 (reserved)
1 3-pin DC power input terminal
1 2-pin connector for power on/off button (reserved)
Storage 2.5” 32G SATA3 HDD
Touch LCD Size 10.1” TFT-LCD 12.1” TFT-LCD
Touch Type Resistive Touch Window Projected Capacitive Touch
Display Resolution 1280 x 800 1024 x 768
Display Luminance (cd/m²) 350 500
Display Viewing Angle (H°/V°) 160(H) / 160(V) 160(H) / 140(V)
Display Contrast 800:1 700:1
Display Backlight Lifetime (hrs) 40,000 hrs 30,000 hrs
Light Transmission (%) Resistive Touch Window: over 80% Projected Capacitive Touch: over 90%
Enclosure Aluminum Die-casting Chassis
 

Power Requirements

DC IN 9~36V

60W adapter 12V 5A with terminal block AC 100~240V, 2.0A, 60~50Hz.

Environment & Certification
IP Rating IP66-rated front bezel
Temperature Operating: 0 ~ 50 degrees C

Storage: -30 ~ 70 degrees C

Humidity 10 ~ 90% relative humidity (non-condensing)
MTBF (Hours) 100,000
Network Management
Number of Managed Devices 512 BSP-360 units
Auto Discovery Supports PLANET BSP-360
Dashboard Providing the at-a-glance view of system, power,

traffic, system statistics and device event statuses

Device List Providing devices status overview and managed function
Setup Wizard Easy-to-use step-by-step guidance
Node Discovery Management is carried out once a BSP-360-powered device is detected
App-like Device Viewing App-like devices that are compliant with SNMP, MQTT, and Smart Discovery
Event Table The status of system can be reported via event alarm
Alarm System E-mail alerts for the administrator via the SMTP server
Device Provisioning Enabling BSP-360 to be configured and upgraded at

the same time

Site Map Real-time site map of BSP-360 and IP cams on the

user-defined map to optimize energy deployment

Remote PoE control Real-time remote PoE on/off to reboot connected

devices

User Control Allowing on-demand account creation and user-

defined access policy

Scalability Free system upgrade and BSP-360 firmware bulk

upgrade capability

Backup/Restoration Provides system and profile backup/restoration
Network Services
 

 

Network

DDNS Supports PLANET DDNS/Easy DDNS
DHCP Built-in DHCP Server for auto IP assignment to APs
Management Console; Telnet; SSL;Web browser (Chrome is recommended); SNMP v1, v2c, v3
Discovery Supports SNMP, ONVIF and PLANET Smart Discovery
 

 

Maintenance

Backup System backup and restore to local or USB HDD
Reboot Provides system reboot manually or automatically per power schedule
Diagnostic Provides IPv4/IPv6 ping and trace route
Standards Conformance
Regulatory Compliance CE, FCC
 

Standards Compliance

IEEE 802.3 10BASE-T IEEE 802.3u 100BASE-TX

IEEE 802.3ab Gigabit 1000BASE-T

[Remarks] Only support BSP-360 V2 version.

Deployed Devices Monitored via NMS-360V Controller

Prior installation
The NMS-360V is used to centrally manage a large number of BSP-360s(V2). Therefore, you need to upgrade the BSP-360(V2) firmware before using NMS-360V. Please download and use the latest BSP-360(V2) firmware from the website so that setting can be completed smoothly. The NMS-360V incorporated in a workstation or PC can monitor the BSP-360s compliant with the MQTT Protocol, SNMP Protocol, ONVIF Protocol and PLANET Smart Discovery utility. Follow the steps below to set up the NMS-360V and BSP-360(V2) accordingly.
Step 1. Connect the devices, NMS-360V Controller and your computer, to the same network.PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-6

Step 2. BSP-360: Log in to the Switch’s Web User Interface and enable the SNMP and NMS controller functions.PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-7PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-8

Wired Network Configuration

A computer with wired Ethernet connection is required for the first-time configuration of the NMS-360V Controller.PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-9

  1. Go to “Control Panel-> Network and Sharing Center-> Change Adapter Settings”.
  2.  Double-click “Local Area Connection”.
  3.  Select “Internet Protocol version 4 (TCP/IPv4)” and click “Properties”.
  4. Select “Use the following IP address” and then click the “OK” button twice to save the configuration. For example, the default IP address of the NMS-360V Controller is 192.168.1.100, then the manager PC should be set to 192.168.1.x (where x is a number between 1 and 254, except 100), and the default subnet mask is 255.255.255.0.PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-10

Entering into the Web Management

  • Default IP Address: 192.168.1.100
  • Default Management Port: 8888
  • Default Username: admin
  • Default Password: admin

Launch the Web browser (Google Chrome with seamless mode is recommended.) and enter the default IP address “https://192.168.1.100:8888”. Then, enter the default username and password shown above to log on to the system. * The secure login with SSL (HTTPS) prefix is required.PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-11

After logging on, connect the NMS-360V Controller to the managed network to centrally control PLANET managed devices.

Setup Wizard

  1. Account Modification: Set a new account and password for securityPLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-12
  2. IP Configuration Setting: Set the NMS-360V’s IP into the same local network segment.PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-13
  3. Devices Discovery: Search the managed devices and add to list. (Finish Wizard)PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-14
  4. If added devices are successful, you can see them in Device List / Management page.PLANET-NMS-360V-Renewable-Energy-Management-Controller-with-LCD-Touch-Screen-15
Further Information
The above steps introduce the simple installations and configurations of the NMS-360V Controller. For further configurations of PLANET NMS, please refer to the user manual, which can be downloaded from the website. PLANET online FAQs: http://www.planet.com.tw/en/support/faq
Support team mail address: support@planet.com.tw
If you have further questions, please contact the local dealer or distributor where you purchased this product.

Documents / Resources

PLANET NMS-360V Renewable Energy Management Controller with LCD Touch Screen [pdf] Installation Guide
NMS-360V, Renewable Energy Management Controller with LCD Touch Screen, NMS-360V Renewable Energy Management Controller with LCD Touch Screen

References

Leave a comment

Your email address will not be published. Required fields are marked *