iROCKER - Logo

QUICK START GUIDE
INFLATING AND DEFLATING

iROCKER Inflating and Deflating - overview

+ INFLATING

  1. Before connecting the hose, make sure the inflation valve is in the CLOSED/UP position.
  2. Connect the hose and set the pump to SETTING 1, then begin inflating.
    The pump’s pressure gauge will not register a reading until the board reaches 7 PSI.
  3. Midway through inflation, when pumping becomes more difficult, set the pump to SETTING 2 and continue inflating.
  4. When nearing full inflation, set the pump to SETTING 3 and fill to 12-16 PSI.

– DEFLATING

  1. Make sure the air valve is DRY. Press firmly on the pressure release pin for 2
  2. seconds, then twist clockwise to lock into the OPEN/DOWN position.
    Be prepared for a loud rush of air when opening the air valve.
  3. Allow air to escape from the board for a few minutes before folding.

FIN INSTALLATION

iROCKER Inflating and Deflating - fin installation

  1. Make sure the fin box lock is in the OPEN/UP position.
  2. Insert the front of the fin into the notched section of the fin box. Rock the fin back and down until it’s in place, then set the fin lock lever to the CLOSED/DOWN position.
  3. Confirm each fin is securely attached before paddling.

iROCKER Inflating and Deflating - fin installation 2

FOLDING YOUR BOARD

  1. Once the board is completely dry and fully deflated, lay it deck-side up on a flat surface.
  2. Fold the entire board in half lengthwise, then ) begin folding in sections, starting from the nose.
  3. Continue folding until the board is completely rolled up.

iROCKER Inflating and Deflating - folding your board

iROCKER Inflating and Deflating - qrhttp://www.irockersup.com

Have questions? We’re here to help.
1-866-985-8367
irockersup.com

iROCKER - Logo

Documents / Resources

iROCKER iROCKER Inflating and Deflating [pdf] User Guide
iROCKER Inflating and Deflating, iROCKER, Inflating and Deflating

References

Leave a comment

Your email address will not be published. Required fields are marked *