flo CoRe Plus Cable Management System Installation Guide

CoRe Plus Cable Management System

CoRe+ Cable Management System

Specifications:

  • Material: Steel
  • Color: Black
  • Weight: 5 lbs
  • Dimensions: 24 in x 6 in x 2 in

Product Usage Instructions:

Wall Mounted Installation:

  1. Remove the security screw before starting the
    installation.
  2. Install the lower wall mount bracket with the pre-drilled holes
    facing outward.
  3. Sit the column in the lower wall mount bracket and secure it
    with the provided screw and bolt using a ratchet wrench.
  4. Install the top bracket and spacing shim, ensuring the assembly
    is level, and secure it with appropriate screws.
  5. Check the column’s angle using a level.
  6. Position the cable clamp on the correct side according to the
    charging station location.
  7. Pull on the cable to ensure smooth movement.

Single Charging Station Installation:

  1. Position the column with the cable management output on the
    exterior side of the charging station.
  2. Screw the column with round spacing shims to secure it.
  3. Secure the top bracket and install the empty column on the
    opposite side following the same steps.
  4. Position the cable clamp accordingly.
  5. Install the poster panel with caution as the pedestal is an
    electrical enclosure.

Dual Back-to-Back Charging Station Installation:

  1. Mount two columns using top mounting brackets and spacing
    shims.
  2. Follow similar steps as single charging station installation
    for securing and positioning components.

FAQ:

Q: Can I install the Cable Management System on a drywall?

A: Yes, you can install it on drywall by using appropriate
screws and anchors for support.

Q: How much weight can the Cable Management System
support?

A: The system is designed to support up to 10 lbs of weight when
installed correctly.

Loading PDF…
Download PDF

CoRe+TM
Cable Management System Installation Guide

Table of contents
Cable Management System Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Wall mounted installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Cable management system installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Single charging station installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Cable management system installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Dual back-to-back charging station installation . . . . . . . . . . . . . . . . . . . . . . . . . 10 Cable management system installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Dual side-to-side charging station installation . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Side-to-side charging station supports and cable management systems Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Positioning the cable clamp . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Positioning the poster panel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Pedestal Specifications . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Maintenance and Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 Pedestal Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Pedestal Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Conduit Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Closing the Pedestal Plate with Torque and Electrical Safety . . . . . . . . . . . . . 23 1 or 2 devices on separate Electrical Circuits . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Multiple Pedestals, Multiple Devices on independent Electrical Circuits. . . . 25 Multiple Pedestals, Multiple Devices sharing the same Electrical Circuit . . . 26 Multiple Pedestals, Multiple Devices sharing the same Electrical Circuit, but with Circuit Breaker for each Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Copyright and Liability ………………………………………………………………………………….28
3

Cable Management System Guide
This guide aims at describing how to install a Cable management system on a new charging station or on one that has already been installed. The Cable management system is reliable, made of aluminum and convenient to use. It’s maintenance free and keeps cables safely off the ground. The instructions have been adapted for each type of installation. There are four types: a) wall mounted installation; b) single charging station installation; c) dual back-to-back charging station installation; d) dual side-to-side charging station installation. Make sure to refer to the proper section of this guide, according to the type of installation you are about to do. Other than instructions, you will find in this guide the list of parts that are included in the package, depending on the type of installation, as well a list of specific tools or material required to do the work as the case may be.
4

Wall Mounted Installation

Included material

Qty

Wall mounted cable management system columns and cable clamp

1

Lower wall mount bracket

1

Upper wall mount bracket

1

Spacing shims

2

Self-adhesive rubber band 6 in X 13/8 in

1

¼-20 x 2¾ screw, ¼-20 bolt and Split lock washer

1

Specific Tools or Material Required · Wall attachment hardware material (¼ in diameter screw, washers and wall anchors as required)
BEFORE GETTING STARTED
! When unpackaging the Cable management system, make sure to remove the security screw used to hold the counterweight during transport.
¡ Installing a new charging station and a Cable management system. First, install the charging station. Refer to the CoRe+TM Installation Guide. Then, install the Cable management system as indicated on the following page.
¡ Installing a Cable management system on an existing wall mounted charging station. Install the Cable management system as indicated on the following page.

5

Before Getting Started

· Determine where the wall mount (column) will be placed. Allow 12 to 14 in between the column and the charging station.
· Determine what wall attachment hardware is required (wall anchors, screws and washers) to securely install the mount brackets to the wall. Use ¼ in diameter screws and anchors of the appropriate size, if the screws cannot be secured directly in a wall stud.
Recommendations : Install the column at least 6 in from the ground (allow enough clearance to facilitate floor cleaning). The upper wall mount bracket should be installed at least 60 in above the lower wall mount bracket.

60 in

6 in Floor
6

Cable Management System Installation
1. First, install one of the two spacing shims and the lower wall mount bracket at the desired height by using two ¼ in diameter screws and appropriate washer. Make sure that both brackets are levelled horizontally.
Remark : The lower wall mount bracket can be identified by its factory pre-drilled holes. 2. Sit the column in the lower wall mount bracket. Remark : Make sure to position the Cable management system’s cable clamp on the correct side, that is on the right or the left, according to where the charging station is located. 3. Secure the column by installing the screw and bolt in
the lower wall mount bracket thought the pre drilled holes with a ratchet wrench and an axel nut socket (the security screw that was used for holding the counterweight).
4. Install the top bracket and the rectangular spacing shim while inserting the column between the parts. Once you ensure that the bracket is flush with the plate and assembly is level, secure it with the appropriate screws (according to wall type).
5. Verify the column’s angle with a level.
6. Proceed with the positioning of the cable clamp. Refer to page 15.
7. Pull on the Cable management system’s cable a few times to ensure that all parts are moving freely.
7

Single Charging Station Installation

Included material

Qty

Cable management system columns and cable clamp

1

Empty column

1

Column mount bracket

2

Round spacing shims

2

Rectangular spacing shims

2

Self-adhesive rubber band

1

¼-20 screws (1”) (for pre-drilled pedestal)

6

Self-drilling screws (1”) (for pedestal with no holes)

6

Drilling template

1

Drilling template (bottom pedestal)

1

8

BEFORE GETTING STARTED ! When unpackaging the Cable management system, make sure to remove the security screw used to hold the counterweight during transport. ¡ Installing on a new single charging station. First, install the pedestal and the charging station. Refer to the pedestal installation section. Then, install the Cable management system as indicated below. If the pedestal is pre-drilled, use the ¼-20 screws provided in the package. Otherwise, use the drilling template and self-drilling screws also included with the kit. Refer to the illustration on the former page to know where to place the template on the pedestal, and mark the holes to drill.
¡ Installing on an existing single charging station. Drill holes that will be used to install the mount bracket for the column with the Cable management system and the empty column. Use the drilling template and the self-drilling screws provided with the kit. Refer to the illustration on the former page to know where to place the template on the pedestal, and mark the holes to drill.
Cable Management System Installation
1. Install the rectangular spacing shim, place the column and than install the upper mount bracket on top. Screw parts loosely with ¼-20 or self-drilling screws, depending on the type of pedestal you have, so the Cable management system column is maintained in place and moves freely to install the lower mounting hardware.
Recommendation : To position the column, when standing in front of the charging station, make sure to place the output of the Cable management on the exterior side.
2. Screw the column of the Cable management system by placing the round spacing shim (circled in red in the image included) between the pedestal and the column, and tighten the screws to solidly secure the column.
3. Secure the top bracket. 4. Install the empty column on the opposite side of the
charging station by following the above steps 1 to 3. 5. Proceed with the positioning of the cable clamp. Refer
to page 15. 6. Install the poster panel. Refer to page 16. Caution : This pedestal is certified like an electrical enclosure, and any alteration must comply with local regulation.
9

Dual Back-to-Back Charging Station Installation

Included material

Qty

Cable management system columns and cable clamp

2

Top mounting brackets

2

Round spacing shims

2

Rectangular spacing shims

2

Self-adhesive rubber band

2

¼-20 screws (1”) (for pre-drilled pedestal)

6

Self-drilling screws (1”) (for pedestal with no holes)

6

Drilling template

1

Drilling template (bottom pedestal)

1

10

BEFORE GETTING STARTED ! When unpackaging the Cable management system, make sure to remove the security screw used to hold the counterweight during transport. ¡ Installing on new back-to-back dual charging stations. First, install the pedestal and the two charging stations. Refer to CoRe+ MC Installation Guide for piedestal and CoRe+ MC Installation Guide respectively. Then, install the Cable management system as indicated below. If the pedestal is pre-drilled, use the ¼-20 screws provided in the package. Otherwise, use the drilling template and self-drilling screws also included with the kit. Refer to the illustration on the former to know where to place the template on the pedestal, and mark the holes to drill.
¡ Installing on existing back-to-back dual charging stations. Drill holes that will be used to secure the Cable management system attachment hardware. Use the drilling template and the self-drilling screws provided with the kit.
Cable Management System Installation
1. Install the rectangular spacing shim, place the column and than install the upper mount bracket on top. Screw parts loosely with ¼-20 or self-drilling screws, depending on the type of pedestal you have, so the Cable management system column is maintained in place and moves freely to install the lower mounting hardware.
Recommendation : To position the column, when standing in front of the charging station, make sure to place the output of the Cable management on the exterior side. 2. Screw the column of the Cable management system
by placing the round spacing shim (circled in red in the image included) between the pedestal and the column, and tighten the screws to solidly secure the column. 3. Secure the top bracket. 4. Install the empty column on the opposite side of the charging station by following the above steps 1 to 3. 5. Proceed with the positioning of the cable clamp. Refer to page 15. 6. Install the poster panel. Refer to page 16. Caution : This pedestal is certified like an electrical enclosure, and any alteration must comply with local regulation.
11

Dual Side-to-Side Charging Station Installation

Included material

Qty

Cable management system columns and cable clamp

2

Round spacing shims

2

Self-adhesive rubber band

2

¼-20 screws (1”) (for pre-drilled pedestal)

6

Self-drilling screws (1”) (for pedestal with no holes)

6

Drilling template (for pedestal with no holes)

1

Charging station mount brackets (V-shape mount) and ¼-20 screws

2

Flexible tube

2

Column mount brackets, ¼-20 screws and bolts

4

Back cover and screws

2

Drilling template (bottom pedestal)

1

Gasket

2

Rectangular spacing shims

2

12

BEFORE GETTING STARTED
! When unpackaging the Cable management system, make sure to remove the security screw used to hold the counterweight during transport.
¡ Installing new side-by-side charging stations · First, install the pedestal. Refer to CoRe+ MC Installation Guide for pedestal. · Then, prepare installation material for the side-by-side charging station mount
brackets and Cable management systems, and follow the instructions that are indicated below. · Finally, install the charging stations. Refer to CoRe+ MC Installation Guide. · Installing on existing side-by-side charging stations
Caution : Before getting started, cut off the current to prevent an electric shock.
INSTALLATION ON PRE-INSTALLED CHARGING STATIONS 1. Remove both charging stations from the pedestal so that you can install the new side-by-side
charging station mount brackets and the two Cable management systems. 2. Remove the wiring as you will need to hook the charging stations to new wires. 3. Then, prepare installation material for the side-by-side charging station mount brackets and Cable
management systems, and follow the instructions that are indicated below. 4. Reinstall the charging station on the new brackets.
Allow 10″ (30 cm) of additional electrical wiring to connect the new charging station to the installation.
Side-to-Side Charging Station Supports and Cable Managements Installation
1. Assemble the flexible tube. 2. Remove the plate giving you access to the electric wires at the bottom
of the pedestal and allow 30 cm (10 in) of extra wiring so to connect the charging station once the flexible tube has been installed. 3. Screw the end of the flexible tube to the charging station mount bracket, on the pedestal side. 4. Pass wires through the flexible tube. 5. Screw the first charging station mount bracket to the pedestal* using the holes provided for this purpose with the included screws, that is, the holes that were used to secure the charging stations that were installed back-toback previously.
Caution : This pedestal is certified like an electrical enclosure, and any alteration must comply with local regulation.
6. Place the column of the Cable management system inside the charging station mount bracket, place tightly in the corner.
Recommendation : To position the column, when you stand in front of the charging station, make sure to place the output (cable clamp) of the Cable management system on the exterior side, and a gasket is inserted between the pedestal and the back cover. 7. Screw the bottom column of the Cable management system by placing the
round spacing shim between the pedestal and the column, and tighten the screws solidly to secure the column.
13

Side-to-Side Charging Station Supports and Cable Managements Installation

8. Insert the other end of the flexible tube in the hole provided for this purpose , and screw the bushing from the exterior of the charging station mount bracket so to maintain the flexible tube in place.
Remark : This will allow to hold the column during the installation of the bottom column mount brackets.
9. Install both column mount brackets starting with the 1st assembly (1 on illustration) then proceed installing the 2nd (2 on illustration).
Remarks : Each column mount bracket has a slot to make its installation easier, which must be place on the front side of the bracket, in other words on the side where the charging station will be installed. Do not screws the bolts too tight when placing the brackets so you can move them easily and position them correctly. Once everything is well positioned, tighten the bolts.
10. Secure the back cover in the column mount brackets with the four screws.

1 2

11. Install the second column on the opposite side of the charging station by following the above steps 1 to 10.
12. Install or reinstall the charging stations. Refer to the CoRe+ MC Installation Guide if need be.
13. Proceed with the positioning of the cable clamp. Refer to page 15.
14. Install the poster panel. Refer to page 16.

14

Positioning the Cable Clamp
1. Pull on the cable of the Cable Management System (CMS) to hold the cable clamp in your hand.
2. Remove the nuts (4) and bolts (4). 3. Determine where to position the charging station cable
clamp. Recommendation : The cable portion between the clamp and the charging connector must not touch the ground when the Cable management system is completely retracted. The cable should hang about 2.5 (50 mmi) above the base of the pedestal.
4. Tighten the cable clamp, adjusting the torque of your tool to 7 in-lb.
5. Let the cms cable retract between the charging station cable and the ground.
6. Wrap the excess cable around the reel on the charging station.
15

Positioning the Poster Panel
Matériel fourni / Included material Poster panel (including two sides) Attachment plate and screws Bolts Washers Rondelle de blocage / Split Lock Washer

Qty / Qté
2 1 4 4 4

1. The top of the columns has embedded screws with rubber caps and washers attached to them. Remove them and set aside.
2. The poster panel is comprised of two parts. Before installing it, secure the attachment plate to the base of one of the panels with the screws provided. The plate is placed inside the panel, and the screws are inserted inwards.

16

Positioning the Poster Panel
3. Place this panel on top of the columns by aligning the panel holes with the embedded screws and secure the the assembly.
4. Install the second panel as mentioned in step number 3, and screw the attachment plate to assemble both panels together.
5. Screw the bolts and washers on the second panel. Remark : If you are installing a charging station “for private use”, make sure to affix the self-adhesive label included for this purpose.
17

Pedestal Specifications
Product family: CoRe+TM Model: CO-PE-000002 Revision: A Company Info: Flo Services Inc. Document revision number: FLO_Installation_CoRe+_CableMgmt+Pedestal_US_12.2019_V11 2020 FLO Services USA Inc. All Rights Reserved. This document is protected by copyright laws of many countries and should not be modified, reproduced or distributed without the prior written consent of AddÉnergie Technologies.
Specifications:
Ingress Protection rating: NEMA 3R enclosure, suitable for outdoor use. Shipping weight: Approximately 33 lbs Security standard compliance: · UL 50 Issue: 2007/09/04 Ed:12 UL Standard for Safety Enclosures for Electrical Equipment,
Non-Environmental Considerations · UL 50E Issue: 2007/09/04 Ed: 1 UL Standard for Safety Enclosures for Electrical Equipment,
Environmental Considerations · CSA C22.2#94.1 Issued: 2007/09/04 Ed: 1 (R2012) Enclosures for Electrical Equipment,
Non-Environmental Considerations – General Instruction No.1: 2008/07/01 · CSA C22.2#94.2 Issue: 2007/09/04 Enclosures for Electrical Equipment Environmental Considerations;
General Instruction No.1
4009606
18 Les informations et les spécifications contenues dans ce document sont sujettes aux changements, modifications et ajouts à n’importe quel moment et sans préavis. Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice. Les informations et les spécifications contenues dans ce document sont sujettes aux changements, modifications et ajouts à n’importe quel moment et sans préavis.
Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice.

Maintenance and Safety
IMPORTANT SAFETY INSTRUCTIONS – PLEASE DO NOT DISCARD THESE INSTRUCTIONS Carefully read this guide before installing the pedestal 1. This pedestal was designed to be ground-based, it must be mounted on a non-combustible surface. 2. This pedestal was designed to help meeting American Disability Act requirments. 3. Make sure with local authorities that the location where the pedestal is to be installed is free from underground
pipelines or electrical equipment, otherwise you might inflict yourself serious injuries. 4. Grounding: to ensure the safe operation of the pedestal, it must be connected to a grounding circuit compliant
with local regulations and installed by a certified electrician. 5. Communicate with a certified contractor, certified electrician or trained installer to ensure compliance with
local building code, regulation, security standards and weather conditions. 6. Handle parts with care. Always use safety glasses and gloves when unpacking and installing. 7. Some parts are heavy and could cause injuries. Use proper lifting techniques and wear safety boots at all times
during installation.
19

Dimensions

25.4 cm (10”)

25.4 cm (10”)

132.3 cm (52.125”)

15.2 cm (6”)

15.2 cm (6”)

20

Pedestal Installation

Anchor

The installer can use a prefabricated anchor offered by FLO (part number: C+V1-ANCHOR) or make his own using 12″ long ½” threaded rods spaced according to the pattern shown on left.

Fig. 1: Prefabricated anchor

Fig. 2: Threaded rod spacing

Concrete Base

The base can be prefabricated or made on site using concrete formwork.
Determine the base’s height (H), depth in the ground (D) and the surface area (A) of its sole according to the soil type and the freeze thaw specifications of the installation area.
Use an electrical conduit of the appropriate size with a diameter of 2” or less to bring the electrical cables to the center of the anchor.

Fig. 3: Concrete Base
21

Conduit Positioning
With 2 conduits and a cascading kit: · The pedestal base opening has been sized to accept 2 PVC conduits
up to 2 inches in diameter each, side by side. · The 2 conduits must be placed side by side and centered between
the anchor pins which are located on each side of the pedestal’s access door. · On the other axis, the conduits should be off center, toward the door, with the conduits’ outer envelope maintained at a minimum distance of 1.25 inch (32 mm) from the axis passing through the center of the pins.
Cascading single station pedestals: · When a single charging station head is mounted on a pedestal, it
should always be facing the parking space it is serving. · To have the head facing the parking space, the access door of the
pedestal must be facing left or right. · To have the access door facing left or right, the conduits must be
placed side by side, as shown.
Cascading dual station pedestals: · When 2 charging station heads are mounted on a pedestal, they
should always be facing left and right. · To have the heads facing left and right, the pedestal’s access door
should be facing the rear of the pedestal. · To have the access door facing the rear of the pedestal, the conduits
must be placed side by side, as shown.
22

Closing the Pedestal Plate with Torque and Electrical Safety

Please ensure to apply a torque · Veuillez respecter le couple de serrage of 3 in-lb on the screws de 3 in-lb pour les vis ci-dessus. above.
· Please ensure to apply 3 in-lb on the screws above.
4 3
1 2
6 5
Please ensure to apply a torque of 6.5 in-lb on all screws and respect · Veuillez respecter le couple de serrage
de 6.5 in-lb et la séquence de serrage pour
the fastening sequence toutes les vis du panneau ci-dessus. on the picture above. · Please ensure to apply 6.5 in-lb on all
screws and respect the fastening sequence of the picture above.

Do not install components below this line

50,86 2,003

157,16 6,188

Base cover

Concrete base

23

1 or 2 Devices on Separate Electrical Circuits
Dispositif électrique NEMA 3R NENMEMAA33RREElleeccttrricicaal Dl eDveicveisces
MALT Grounding
Les informations et les spécifications contenues dans ce document sont sujettes aux changements, modifications et ajouts à n’importe quel moment et sans préavis.
24 Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice.

Multiple Pedestals, Multiple Devices on Independent Electrical Circuits
DNiNsEpEMoMsAAit3i3fRRélEEelcleetccrittqrriuicceaallNDDEeevMviciAcees3sR
MALT Grounding
LIMITE = DIAMÈTRE DU CONDUIT ET GROSSEUR DES CONDUCTEURS LIMIT = CONDUIT DIAMETER AND WIRE GAUGE
25 Les informations et les spécifications contenues dans ce document sont sujettes aux changements, modifications et ajouts à n’importe quel moment et sans préavis.
Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice.

Multiple Pedestals, Multiple Devices Sharing the Same Electrical Circuit
NEMA 3R Electrical Devices
UL Listed Terminal Block
26

Multiple Pedestals, Multiple Devices Sharing the Same Electrical Circuit, but with Circuit Breaker for each Devices
NEMA 3R Electrical Devices
UL Listed Circuit Breaker
UL Listed Terminal Block
27

Copyright and Liability
Document name: FLO_CoRe+Cable Management and Pedestal Installation Guide_V.2.0.1_2024-08-08_US_EN Document ID: PRFM0033 © 2024 FLO Services USA Inc., All rights reserved. FLO, the FLO logo, LEAD THE WAY, and TRACEZ LA VOIE are trademarks of Services FLO Inc. used under license by FLO Services USA Inc. ADDÉNERGIE is a trademark of AddÉnergie Technologies Inc. used under license by FLO Services USA Inc. ALL Documents: This document is provided as a general instruction guide. All pictures shown are for illustration purposes only. Actual stations may vary in size or due to product enhancements, in which case additional steps may be required. AddÉnergie Technologies Inc. and its subsidiaries (“AddÉnergie”) reserve the right to alter this document and any product offerings and specifications at any time without notice and AddÉnergie does not guarantee that that this version of the document is current. It is your responsibility to comply with all applicable laws, including those related to accessibility, zoning, and to exercise due diligence when conducting an installation or using this product. Careless installation or use may result in injury or product damage. To fullest extent permitted by applicable laws, AddÉnergie disclaims any liability for personal injury or property damage resulting from the installation or use of this product.
28

Eastern office: 2800, Louis-Lumière Street, office 100, Québec (QC) G1P 0A4 Regional office ­ Western Canada: #501 ­ 4190 Lougheed Highway Burnaby (British Columbia), Canada, V5C 6A8 United-States office: 1270 Pacific Dr, Auburn Hills, MI, United States ­ 48326

Documents / Resources

PDF thumbnailCoRe Plus Cable Management System
Installation Guide · CoRe Plus Cable Management System, CoRe Plus, Cable Management System, Management System
PDF thumbnailCoRe Plus Cable Management System
Installation Guide · CoRe Plus Cable Management System, CoRe Plus, Cable Management System, Management System

References

Ask a Question

Use this section to ask about setup, compatibility, troubleshooting, or anything missing from this manual.

Ask a Question

Ask about setup, compatibility, troubleshooting, or anything missing from this manual. Name and email are optional.