ENOVATES-LOGO

Enovates eDSB Active Load Balancing

Enovates-eDSB-Active-Load-Balancing-PRODUCT

Specifications

  • Input voltage: AC
  • Min current: 80A
  • Protocol: Modbus
  • Bus type: RS485
  • Input type: Screw terminals
  • Cable length: Recommended < 100m
  • Terminals: Screw terminals
  • Type of CT: Split core
  • Max primary current: 80A
  • Terminals: Screw terminals
  • Power supply: +12V GND

Product Usage Instructions

Installation Procedure

  • Install current transformers and measuring devices only when the power supply is disconnected.
  • Installation and service should be done by a qualified electrician.
  • Do not install damaged products.

Connection Data

  • Connection method: 2-wire (RS485)
  • Recommended cable: Cat5e or Cat6. Shielding is recommended for polluted environments.

Installation of the Coils

  • An indicator on the coil shows the direction of the current flow. Ensure the coil is mounted correctly around the conductor in the installation cabin.
  • The arrow direction should point from the grid side towards the house side.
  • The coil is a split-core coil; it can be unlocked and mounted around the conductor.

Operating Instructions

INTRODUCTION

  • This manual is a technical guide for installing an eDSBI or eDSBIII, a device for active load balancing. The eDSBI is meant for single-phase installations, and the eDSBIII is meant for 3-phase, 4-wire installations.
  • The most recent version of this manual and specific configuration settings can be found on https://www.enovates.com/download/edsb-installation-manual/
  • WARNING: The eDSBIII is meant for 3-phase, 4-wire connections but can also be used for 3-phase, 3-wire installations.
  • DO NOT USE an eDSBI in a 3-phase, 3-wire installation; an unbalanced load can cause the unmeasured line to be pushed past the current limit.

PRODUCT OVERVIEW

OverviewEnovates-eDSB-Active-Load-Balancing-FIG-1

TECHNICAL SPECIFICATIONS

Measuring instrument – eDSBI and eDSBIII

Power supply
Input voltage 10-13V
Min current 100mA
Wire diameter 0,2mm²-1,5mm²
Communication
Protocol Modbus
Bus type 2-wire RS-485
Input type Screw terminals (next to power supply input)
Wire diameter 0,2mm²-1,5mm²
Baud-rate 9600
Cable length Recommended < 100m
Voltage measurement
L-N 230V ± 20%
Accuracy ±5V
Terminals Screw
Max wire diameter 16mm² solid or 10mm² stranded with ferrule
Current measurement
Type CT measurement 80A/40mA output
Type of CT Split core
Max primary current 80A
Terminals Screw terminals
HMI
Display no
Power led yes
Communication led yes

INSTALLATION PROCEDURE

General safety information

  • Enovates-eDSB-Active-Load-Balancing-FIG-2Install current transformers and corresponding measuring devices only when the power supply of the system is disconnected.
  • Installation and service should be performed by a qualified licensed electrician. The installer is responsible for all (regional-specific) electrical requirements.
  • Do not install damaged product(s)!

Installation of the measuring device

  • The meter is mounted on a DIN rail.
  • Use the blue and blue-white wires together to connect the ground and use the brown and brown-white wires together to connect the +12V.
  • The Modbus communication between the eDSB and the charger is connected by combining the green and orange wire for the A connection and combining the green-white and the orange-white wires for the B connection.Enovates-eDSB-Active-Load-Balancing-FIG-3
  • L1 (brown), L2 (black), L3 (grey) and N (blue) are connected as seen above. Connecting L1, L2, L3, and N is advised but not mandatory.
  • When these wires are not connected, the direction of the power cannot be determined, and therefore, the device is not advised for use in combination with solar panels or other devices that put power back to the grid.Enovates-eDSB-Active-Load-Balancing-FIG-4

Connection data

Communication
Connection method 2-wire (RS485)
Recommended cable Cat5e or Cat6
  Shielding is recommended for polluted environments

Installation of the coils

  • An indicator on the coil shows the direction of the current flow.
  • Make sure that the coil is mounted correctly around the conductor in the installation cabin.
  • The arrow direction should point from the grid side towards the house side.
  • The coil is a split-core coil; it can be unlocked and mounted around the conductor.Enovates-eDSB-Active-Load-Balancing-FIG-5
  • WARNING: The coils are to be mounted before the main circuit breaker.

Electrical diagram eDSBIEnovates-eDSB-Active-Load-Balancing-FIG-6

Electrical diagram eDSBIIIEnovates-eDSB-Active-Load-Balancing-FIG-7

NOTE: In a 3 x 230V configuration, the blue (N) wire is not utilised.

OPERATING INSTRUCTIONS

Settings of the eDSB device

  • It is advised to use the charger datasheet and/or user manual of the charger while configuring the eDSB device.
  • All settings described below are informative and are not guaranteed to apply to your product.
  • All chargers that can use the eDSB have settings to configure the following parameters.
  • Some common configuration names are shown between the brackets.
    1. When configuring the charging station via the Admin page, set smart.external.limit. device = eDSBI or eDSBIII.
      • When using EnoSAM, select eDSBI or eDSBIII from the ‘measurement device’ dropdown.
    2. The maximal current the installation should use (installation.grid.max.current).
  • This is the maximum current taken from the grid by the building and the charger.
  • For example: if installation.grid.max.current = 30 and the building draws 10A, there will be 20A left for the charger.
  • NOTE: The charger will never draw more current than set in the fixed limit of the charger (chargepoint.max.amp.per.phase).
    • WARNING: It is advised to keep a safe margin (±10%) to not always drawing the maximum possible power from the grid.
  • E.g. a grid connection of 32A results in an installation.grid.max.current of 29A.
  • WARNING: Never use the eDSBI meter together with a 3-phase charger.

HMI

  • The red LED on the front panel indicates the power flow measured by the meter. When power flows, the LED will flash. The faster the LED flashes, the more power flows.
  • For this meter, the LED will flash 10.000 times per kWh. If there is no load connected to the meter or the load on the line is very low, the red consumption LED will not flash.Enovates-eDSB-Active-Load-Balancing-FIG-8

CUSTOMER SERVICE

  • Brandstraat 13
  • 9160 Lokeren Belgium
  • +32094307720
  • info@enovates.com
  • © Enovates NV
  • All rights reserved.
  • No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior written permission of the publisher.

Frequently Asked Questions

  • Q: Can I use an eDSBI in a 3-phase, 3-wire installation?
    • A: No, using an eDSBI in a 3-phase, 3-wire installation can lead to unbalanced load issues.
  • Q: What is the recommended cable for communication?
    • A: Cat5e or Cat6 cables are recommended for communication, with shielding suggested for polluted environments.
  • Q: What should I do if I encounter damaged products during installation?
    • A: Do not install damaged products and seek replacements from authorised suppliers before proceeding with installation.

Documents / Resources

Enovates eDSB Active Load Balancing [pdf] Instruction Manual
eDSBI, eDSBIII, eDSB Active Load Balancing, eDSB, Active Load Balancing, Load Balancing, Balancing

References

Leave a comment

Your email address will not be published. Required fields are marked *