Sungrow 1-Phase Hybrid Inverter

Quick Installation Guide

SH3.0RS / SH3.6RS / SH4.0RS
SH5.0RS / SH6.0RS

Clean power for all

Website: www.sungrowpower.com

Introduction and General Information

This guide provides essential information for the quick installation of the Sungrow 1-Phase Hybrid Inverter. The content may be updated periodically. This guide is not a substitute for the user manual or other related notes on the device.

All operations must be performed by qualified personnel trained in electrical system installation, commissioning, hazard management, and familiar with the manual and local regulations.

Before installation, verify that all package contents are intact and complete. Contact Sungrow or the distributor for any damaged or missing components. Ensure cables are intact and well-insulated, and personnel wear appropriate Personal Protective Equipment (PPE).

Violation of these instructions could result in personal death, injury, or device damage, and will void the warranty.

Safety

The inverter is designed and tested according to international safety regulations. Read and observe all safety instructions carefully before and during any work on or with the inverter. Incorrect operation can cause:

Follow safety instructions related to PV strings and the utility grid.

⚠️ DANGER: Lethal Voltage!

⚠️ NOTICE: Danger from Electric Shock!

Inverter Safety Labels

The inverter body has warning labels:

DANGER: Live Voltage and Shock Hazard

WARNING: Risk of Inverter Damage or Personal Injury

CAUTION: Risk of Burns from Hot Components!

NOTICE: Country Setting and ESD Hazard

Battery Safety

DANGER: Battery Hazards

NOTICE: Battery Damage

Wiring Diagrams

The document includes wiring diagrams for different systems and regions. These diagrams illustrate the connection of the inverter with batteries, PV panels, grid, loads, and various protection devices.

Backup Wiring Diagram (For AU / NZ)

This diagram shows the backup wiring configuration for Australia and New Zealand. It includes connections for Battery, PV, Grid, Distribution Box with breakers (DC breaker, AC breakers), Main Meter, Sungrow Smart Energy Meter, Normal Loads, and Backup Loads. It specifies breaker ratings and RCD requirements.

Key components and connections:

  • 1. Battery: Connected via a DC breaker.
  • 2. DC Breaker: For battery protection.
  • 3. AC Breaker: For backup output protection.
  • 4. RCDs (Residual Current Devices): For Normal Loads and Backup Loads, with specific ratings (e.g., 30mA RCD).
  • 5. Main Meter: Measures grid power.
  • 6. Sungrow Smart Energy Meter: Monitors energy production and consumption.
  • 7. RCD: For Normal Loads.

Note: The PE wire of the Backup terminal is not required for Australia and New Zealand.

Backup Wiring Diagram (For Other Countries)

This diagram is similar to the AU/NZ version but includes an additional 300mA RCD (Recommended) and specifies different breaker ratings. It covers configurations for various countries.

Key components and connections:

  • 1. Battery: Connected via a DC breaker.
  • 2. DC Breaker: For battery protection.
  • 3. AC Breaker: For backup output protection.
  • 4. RCDs: For Normal Loads and Backup Loads (e.g., 30mA RCD).
  • 5. Main Meter: Measures grid power.
  • 6. Sungrow Smart Energy Meter: Monitors energy production and consumption.
  • 7. RCD: For Normal Loads.
  • 8. 300mA RCD: Additional protection recommended.

Backup Wiring Diagram (For TT system)

This diagram is specifically for TT earthing systems. It details the connections for Battery, PV, Grid, Distribution Box, breakers, meters, and loads, including specific RCD requirements for TT systems.

Key components and connections:

  • 1. Battery: Connected via a DC breaker.
  • 2. DC Breaker: For battery protection.
  • 3. AC Breaker: For backup output protection.
  • 4. RCDs: For Normal Loads and Backup Loads.
  • 5. Main Meter: Measures grid power.
  • 6. Sungrow Smart Energy Meter: Monitors energy production and consumption.
  • 7. RCD: For Normal Loads.
  • 8. 300mA RCD: Additional protection recommended.

Scope of Delivery and Installation Tools

The document lists the items included in the scope of delivery, such as the inverter, wall-mounting bracket, expansion plug set, screw sets, connector sets, and documents. It also details the necessary installation tools, including a marker, multimeter, hammer drill, wire stripper, hydraulic plier, crimping tools, screwdrivers, heat gun, RJ45 crimping tool, wrenches, and Allen wrench.

Mounting Location Considerations:

Installation Steps

Detailed steps are provided for mounting the inverter, including drilling holes, securing brackets, and tightening screws with specified torque values.

Mounting:

PE / Grounding:

Cable specifications must comply with local regulations or be consistent with the PE wire in the AC cable.

AC Connection:

DC Connection:

Backup Connection:

Battery (Power) Connection:

WiNet-S Module Installation:

COM (Meter, RS485, CAN, DRM) Connections:

Battery (Communication) Connections:

Power On Sequence:

SolarCloud App: A QR code is provided for accessing the SolarCloud App.

LED Indicator and Panel Information

The inverter features an LED panel displaying operational status and error codes.

LED Panel Display:

LED indicator LED state Definition
Blue LED ON The inverter is operating normally.
Red LED Twinkling The inverter is at standby or startup state (not feeding power into the grid).
Red LED ON A system fault has occurred.
Grey LED OFF Both the AC and DC sides are powered down.

Contact and Further Information

For more information, scan the QR code or visit http://support.sungrowpower.com/.

EU/EEA Importer: Sungrow Deutschland GmbH

Address: Balanstrasse 59, 81541 München, Germany

Website: www.sungrowpower.com

Specifications are subject to changes without advance notice.

Models: SH3.0RS, 1 Phase Hybrid Inverter, SH3.0RS 1 Phase Hybrid Inverter, Hybrid Inverter, Inverter, SH3.6RS, SH4.0RS, SH5.0RS

PDF preview unavailable. Download the PDF instead.

a-252F4-252Fa-252Fb-252Fa4ab83736c6cfe30c68bf72335441a8955eeff8a ia ivh sung sh3-0 6-0rs quick en de it fr nl pl es pt2Y340SDled Adobe PDF library 15.00 Adobe Illustrator CC 2017 (Windows)

Related Documents

Preview Sungrow 1-Phase Hybrid Inverter Quick Installation Guide
This guide provides essential information for the quick installation of Sungrow 1-Phase Hybrid Inverters, including safety precautions, wiring diagrams, and component identification for models SH3.0RS, SH3.6RS, SH4.0RS, SH5.0RS, and SH6.0RS.
Preview Sungrow 1-Phase Hybrid Inverter Quick Installation Guide (SH3.0RS-SH6.0RS)
Quick installation guide for Sungrow 1-Phase Hybrid Inverters (SH3.0RS-SH6.0RS), detailing safety, installation, and operational information. Refer to the full user manual for comprehensive details.
Preview Sungrow SH3.0-6.0RS Parallel Connection Instruction
Detailed instructions for parallel connection of Sungrow SH3.0RS, SH3.6RS, SH4.0RS, SH5.0RS, and SH6.0RS hybrid inverters. Covers system configuration, master-slave settings, and troubleshooting for decentralized and centralized access modes.
Preview Sungrow SH3.0/3.6/4.0/5.0/6.0RS Residential Hybrid Single Phase Inverter Datasheet
Datasheet for Sungrow's SH3.0/3.6/4.0/5.0/6.0RS series of residential hybrid single-phase inverters, detailing features, specifications, and performance curves.
Preview Sungrow 1-Phase Hybrid Inverter Delta Grid Guide (Earth Detection)
Comprehensive guide for Sungrow 1-phase hybrid inverters (SHxxRS, SGxRS series) on configuring for 230V Delta Grid systems with earth detection. Learn to disable grounding detection locally and via iSolarCloud, and manage backup mode.
Preview Sungrow 3-Phasen Hybrid Schulung für Installateure
Technische Schulung von Sungrow für Installateure zum Thema 3-phasige Hybrid-Wechselrichter. Enthält Informationen zur Nutzung des Sungrow Serviceportals, Garantieregistrierung und Produktübersicht.
Preview Sungrow Residential Hybrid Inverter Communication Protocol
This document outlines the Modbus communication protocol for Sungrow Residential Hybrid Inverters, detailing interface settings, address definitions for running information and parameter settings, and providing examples for data acquisition and configuration.
Preview Sungrow SG2.0-6.0RS Single-Phase PV Grid-Connected Inverter Quick Installation Guide
Quick installation guide for the Sungrow SG2.0-6.0RS series single-phase PV grid-connected inverter. Learn how to safely install and commission your solar inverter for optimal performance.