Danfoss MSV-BD Balancing Valves

Danfoss MSV-BD Balancing Valves

Fitting

Before fitting the valve the installer must ensure that the pipe system is clean and:

  1. The valve can be turned 360° if threaded pipe is used.
  2. The valve is oriented according to the flow arrow.
    Fitting

Removal Of Handle

  1. The union nut become accessible when the green lock is released.
  2. Turn scale to 0.0 and unscrew the union nut.
    Removal Of Handle
    Calibration
  3. Before refitting handle ensure that the setting displays 0.0

Open And Close

An indicator shows:
White = open valve
Red = closed valve
Open And Close

Setting The Flow

  1. When valve is open the lock is released. Allen key can also be used.
  2. The handle pops up and the required fiow may be set. Flow diagrammes are found on http://heating.danfoss.com
  3. Lock the setting by pressing the handle until click.
    Seal
  4. The setting may be protected using a sealing strip.
    Setting The Flow

Drain

The measuring station can be turned to any position.
The red test plug drains the inlet side of valve and blue the outlet.
Max. 3 turns, see illustration.
The accessory drain connection is to be used to attach a hose.
Drain

Instruction For Use

DN R1/R2 (mm)
15 62/50
20 66/55
25 71/59
32 117/66
40 119/66
50 122/67

Drain
Instruction For Use
Instruction For Use

Logo

Documents / Resources

Danfoss MSV-BD Balancing Valves [pdf] User Guide
MSV-BD Balancing Valves, MSV-BD, Balancing Valves, Valves

References

Leave a comment

Your email address will not be published. Required fields are marked *