CENTURION D6-SMART Sliding Gate Operators

CENTURION-D6-SMART-Sliding-Gate-Operators-product

Specifications

  • Company: Centurion Systems (Pty) Ltd
  • Quality Standard: ISO 9001:2015
  • Technical Support Operating Times:
    • Monday to Friday: 08h00 to 16h30 GMT+2
    • Saturdays: 08h00 to 14h00 GMT+2

Product Usage Instructions

  • Introduction
    • Important Safety Information: Ensure to read and understand all safety precautions before installation.
    • Safe Disposal of Batteries: Follow local regulations for proper battery disposal.
    • Lightning Protection: Install appropriate lightning protection measures as per local guidelines.
    • Theft Protection: Consider additional theft protection mechanisms for enhanced security.
  • Specifications
    • Physical Dimensions: Refer to the user manual for detailed dimensions.
    • Technical Specifications: Detailed technical specifications are provided in the manual.
  • Product Identification
    • Refer to the product identification section in the manual for specific identification details.

FAQs

  • Q: What should I do if the gate operator malfunctions?
    • A: If you encounter any issues with the gate operator, refer to the troubleshooting section of the manual or contact technical support during operating times.
  • Q: How often should I perform maintenance on the D6 SMART?
    • A: Regular maintenance is recommended to ensure optimal performance. Follow the maintenance schedule outlined in the manual for guidance.

SLIDING GATE OPERATORS
D6 SMART INSTALLATION MANUAL
Centurion Systems (Pty) Ltd www.centsys.com.au

Company Profile

1986
In-house R&D development team

1990

1995

1999

Today
Manufactures to international
quality standard ISO 9001:2015

ISO 9001:2015

After-sales multi-language Technical Support

100% testing of products

Sales and technical support to Africa, Europe, Asia, the Americas, Australia and the Pacific
Technical Support Operating Times Monday to Friday
08h00 to 16h30 GMT+2
Saturdays 08h00 to 14h00 GMT+2
Centurion Systems (Pty) Ltd reserves the right to make changes to the product described in this manual without notice and without obligation to notify any persons of any such revisions or changes. Additionally, Centurion Systems (Pty) Ltd makes no representations or warranties with respect to this manual. No part of this document may be copied, stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, optical or photographic, without the express prior written consent of Centurion Systems (Pty) Ltd.

www.centsys.com

SECTION 1
1. Introduction

INTRODUCTION

The D6 SMART is a domestic and light-industrial operator designed to open and close sliding gates weighing up to 600kg. A custom-designed gearbox moulded from robust engineering polymers, coupled to a powerful 24V DC motor, provides fast and reliable automation for entrances to homes and small housing estates.

The system operates off two 12V 7Ah batteries housed inside the operator using a switchmode charger to maintain the batteries in a fully-charged state. The batteries provide critical power failure protection.

A non-contact Hall Effect Sensor was selected to ensure reliability and positional accuracy. The Hall Effect Sensor is highly resistant to dust, oil, dirt or insect ingress, therefore ensuring that the D6 SMART opens and closes gates reliably and accurately.

Advanced features of the D6 SMART logic controller include:

· Interactive graphic user interface via a smartphone application · Automated setup of gate end-points (limits) · Independently-adjustable motor speed in both opening and closing directions · Fail-safe collision detection and auto-reverse (adjustable sensitivity) · Smooth, adjustable start/stop (ramp-up/ramp-down) · Multiple operational modes · Selectable, adjustable Autoclose · Pedestrian (partial) opening · Positive Close Mode · Independent safety inputs for opening and closing beams · Automatic beam test for both opening and closing beams · Advanced lightning/surge protection · Onboard NOVA code-hopping radio receiver with full channel-mapping capability
(limited to 1500 remotes1)
1. Multiple buttons per remote can be used

Icons used in this manual This icon indicates tips and other information that could be useful during the installation.

This icon denotes variations and other aspects that should be considered during installation.
This icon indicates warning, caution or attention! Please take special note of critical aspects that MUST be adhered to in order to prevent injury.

page 5

www.centsys.com

SECTION 1
1.1. Important Safety Information

INTRODUCTION

ATTENTION!
To ensure the safety of people and possessions, it is important that you read all of the following instructions.
Incorrect installation or incorrect use of the product could cause serious harm to people.
The installer, being either professional or DIY, is the last person on the site who can ensure that the operator is safely installed and that the whole system can be operated safely.

Warnings for the Installer
CAREFULLY READ AND FOLLOW ALL INSTRUCTIONS before installing the product.
· All installation, repair, and service work to this product must be carried out by a suitably qualified person
· This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety
· Do not activate your gate unless it is in view and you can determine that its area of travel is clear of people, pets, or other obstructions
· NO ONE MAY CROSS THE PATH OF A MOVING GATE — always keep people and objects away from the gate and its area of travel
· NEVER LET CHILDREN OPERATE OR PLAY WITH THE GATE CONTROLS
· Secure all easily-accessed gate opener controls in order to prevent unauthorised use of the gate
· Do not in any way modify the components of the automated system
· Do not install the equipment in an explosive atmosphere: the presence of flammable gases or fumes is a serious danger to safety
· Before attempting any work on the system, turn off electrical power to the operator and disconnect the batteries
· The Mains power supply of the automated system must be fitted with an all-pole switch with contact opening distance of 3mm or greater; use of a 5A hydraulic breaker with all-pole circuit break is recommended
· Make sure that an earth leakage circuit breaker with a threshold of 30mA is fitted upstream of the system
· Never short-circuit the battery and do not attempt to recharge the batteries with power supply units other than that supplied with the product, or manufactured by Centurion Systems (Pty) Ltd

page 6

www.centsys.com

SECTION 1

INTRODUCTION

· Make sure that the earthing system is correctly constructed and that all metal parts of the system are suitably earthed

· Safety devices must be fitted to the installation to guard against mechanical movement risks such as crushing, dragging and shearing

· Always fit the warning signs visibly to the inside and outside of the gate
· The installer must explain and demonstrate the manual operation of the gate in case of an emergency and must hand over the User Guide/Warnings to the user
· The installer must explain these safety instructions to all persons authorised to use this gate, and be sure that they understand the hazards associated with automated gates

· Do not leave packing materials (plastic, polystyrene, etc.) within reach of children as such materials are potential sources of danger

· Dispose of all waste products like packing materials, worn-out batteries, etc., according to local regulations

· Always check the obstruction detection system, and safety devices for correct operation

· Neither Centurion Systems (Pty) Ltd, nor its subsidiaries, accepts any liability caused by improper use of the product, or for use other than that for which the automated system was intended

· This product was designed and built strictly for the use indicated in this documentation; any other use, not expressly indicated here, could compromise the service life/operation of the product and/or be a source of danger

· Everything not expressly specified in these instructions is not permitted

1.2. Safe Disposal of Batteries

ATTENTION!
· Do not incinerate · Do not short the battery terminals · Do not charge in a gas tight container · Do not open · Recharge after use · Flush with water at once if contact is
made with electrolyte (acid)

 

WARNING! WARNING! WARNING! WARNING! WARNING!

SAFETY FIRST

KEEP CLEAR! GATE MAY MOVE AT ANY TIME!

MOVING GATE CAN CAUSE SERIOUS INJURY OR DEATH!
KEEP CLEAR! GATE MAY MOVE AT ANY TIME! DO NOT ALLOW CHILDREN TO OPERATE THE GATE OR PLAY IN THE
NEAR VICINITY OF THE GATE.

page 7

www.centsys.com

SECTION 1
1.3. Lightning Protection

INTRODUCTION

The electronic controller utilises the same proven surge protection philosophy that is used in all our products. While this does not guarantee that the unit will not be damaged in the event of a lightning strike or power surge, it greatly reduces the likelihood of such damage occurring. The earth return for the surge protection is provided via the mains power supply earth and/or earth spike located next to the operator.

In order to ensure that the surge protection is effective, it is essential that the unit is properly earthed.

1.4. Theft Protection
While care has been taken in the design of the D6 SMART to prevent unauthorised removal (theft) of the unit, an optional steel theft-deterrent cage with a patented design is also available for added peace of mind.

If a theft-deterrent cage is required, be sure to leave enough clearance from pillars, etc. (Section 7.1.2. – “Minimum Clearances”).

page 8

www.centsys.com

SECTION 2
2. Specifications

SPECIFICATIONS

2.1. Physical Dimensions

CENTURION-D6-SMART-Sliding-Gate-Operators-fig- (1)

When the WiZos are removed from their packaging, it is important to remember the following:
The WiZos are ready to be used; they have just not been configured or added to a network. Configuration is what the user / installer needs to do.

372.5mm

58mm

31mm

181mm

275mm

FIGURE 1. D6 SMART PHYSICAL DIMENSIONS

2.2. Technical Specifications

Input voltage1

110V – 240V AC 50/60Hz1

Current consumption (mains)

430mA

DX1 Battery charger current output

1.3A@ 27.6V (+/-5%), 38W

Maximum number of operations per day

1503,6

Duty cycle – Mains present2,3

50%

Motor power supply

Battery-driven (Standard Capacity – 2x12V 7Ah)

Current consumption (motor at rated load)

13A

Input / Output sink currents (Max. accessory current draw)

I/O 1-4

100mA (12/24V)

I/O 5 and 6

3A (12/24V) 10sec Pulse

TABLE 1

This equipment is compliant with Class A of CISPR 32 / EN 55032. In a residential environment, this equipment may cause interference.

page 9

www.centsys.com

SECTION 2
2.2. Technical Specifications Continued

SPECIFICATIONS

Fuse Protection Main Control Card
Aux. Supply
Charger (Mains Supply) Motor push force – starting Motor push force – rated Gate mass – maximum Gate length – maximum Gate speed (varies with load)4 Manual Override
Operations whilst in battery backup mode with 7.2Ah batteries
Half day5,6 Full day5,6
Operations whilst in battery backup mode with 7Ah 28 W batteries
Half day5,6 Full day5,6 Collision Sensing Operating temperature range
Onboard receiver type
Receiver code storage capacity Receiver frequency Degree of protection Mass of unit packed (with standard kit, but excl. rack and battery)

Type

Rating

Serviceable Resetable Fuse Non-serviceable

35A Mini ATO
12V 600mA8 or
24V 3A (10sec Pulse)
3A slow-blow

30kgf 17kgf

600kg 100m9

Up to 35m/min @ 17kgf Lockable with key release

Power Saving 15m/min
7kgf 209 183
Power Saving 15m/min
7kgf 197 170

Operating Mode

Power Saving 15m/min 17kgf

Normal 30m/min
7kgf

96

102

87

79

Operating Mode

Power Saving 15m/min 17kgf

Normal 30m/min
7kgf

87

70

75

45

Normal 30m/min
17kgf
70 59
Normal 30m/min
17kgf
42 30

Electronic

-15°C to +50°C

Code-hopping multichannel receiver with selective add and delete

1500 Remotes7

433.92MHz IP55

9.1kg

Packaging dimensions (with standard kit, but excl. rack and battery)

325mm wide x 244mm deep x 445mm high

TABLE 1 CONTINUED
1. Can operate off a solar supply, consult your local dealer for assistance. 2. Based on 25°C ambient temperature and unit not in direct sunlight. 3. Based on a motor push force of less than 50% of rated (Starting and Running forces). 4. Gate opening and closing speeds can be configured to run slower depending on the requirements of individual installations. 5. Can increase battery capacity for longer standby times. 6. Based on 4m gate, excluding all accessories. 7. Multiple buttons per remote can be used. 8. For previous controller versions. 9. Dependent on push force.

page 10

www.centsys.com

SECTION 3

Product Identification

CENTURION-D6-SMART-Sliding-Gate-Operators-fig- (2)

20

1

21

PRODUCT IDENTIFICATION 2

3 22
1
19

18

17

4

5 16
6

15

7

8

9

23

120

11

12

24

14

13

1. 12V Batteries1 2. D6 SMART Cover 3. DX Control Card 4. Cable Shield 5. Gearbox 6. M10 Nut (17mm Socket) 7. Spring Washer 8. Top Height Adjuster (19mm Socket) 9. Bottom Height Adjuster 10. Heavy Duty M12 Washer 11. M10 Half-Nut 12. Foundation Plate

FIGURE 2. PRODUCT IDENTIFICATION
13. Mounting Bolt 14. Lower Battery Tray 15. Cable Trunking 16. Earth Harness 17. Switch-Mode 1.3A charger2 18. Battery Harness 19. Power Supply Harness 20. Accessory Tray 21. Accessory Retaining Door 22. Top Battery Stabiliser 23. Release Handle 24. Camlock

1. Batteries are not supplied with the D6 SMART. The D6 SMART supports both 6Ah and 7.2Ah variants. 2. Charger is not supplied with the D6 SMART. Contact your local dealer for more information.
page 11

www.centsys.com

SECTION 4

Required Tools and Equipment

CENTURION-D6-SMART-Sliding-Gate-Operators-fig- (3)

REQUIRED TOOLS AND EQUIPMENT

Hammer

Ratchet and Socket set (17mm and 19mm) with extensions

Electric Drill

Screwdrivers 6mm Phillips 3.5mm Flat

Crimping tool and Pin lugs

Connector block

Smartphone with app installed

G-clamps (x2)

Masonry drill bits

Angle grinder

Pin punch 6mm

Measuring tape

Hacksaw

Safety equipment (goggles, gloves, etc.)

Welding machine (including consumables)
and safety equipment

Soldering iron
Extension cord

Pliers

Marking pen/chalk
Spirit level

FIGURE 3. REQUIRED TOOLS AND EQUIPMENT

page 12

www.centsys.com

SECTION 5

NEW SITE INSTALLATION PREPARATION

New Site Installation Preparation

5.1. General Considerations for the Installation

Always recommend the fitment of additional safety equipment such as safety edges and safety beams, for additional protection against entrapment or other mechanical risks.
Check that no pipes or electrical cables are in the way of the intended installation.
Check that enough space is available for the gate operator, specifically for the release handle (See Section 7.1.2. – “Minimum Clearances”).
Check for loose, sandy soil if installing a foundation, as the soil condition may require a larger foundation.
Never fit the operator on the outside of the gate, where the public have access to it.

Install the gate operator only if: · It will not pose a hazard to the public · There is sufficient clearance to a roadway and/or public thoroughfares · The installation meets all municipal and/or local authority requirements once completed · The gate mass and application are within the operator specifications · The gate is in good working order, meaning:
· that it opens and closes freely; · does not move on its own if left in any position; · it can be installed to have sufficient clearance between moving parts when
opening and closing to reduce the risk of personal injury and entrapment; · Pushbuttons or key-switches, when required, can be positioned so that the gate is in
line-of-sight of the user

page 13

www.centsys.com

SECTION 5
5.2. End-Stops

NEW SITE INSTALLATION PREPARATION

Fit opening and closing end-stops capable of stopping the gate at rated speed. Refer to the specifications at the beginning of this manual for the operating speed.

Make H1>H2 to ensure gate will not jump over the endstop.

CENTURION-D6-SMART-Sliding-Gate-Operators-fig- (4)

Opening and closing end-stops are mandatory and must be fitted to prevent death or accidental injury as the operator uses and confirms these limits during operation.

End-stop

H1

H2

End-stop Ø16mm

FIGURE 4. FITTING END-STOPS
5.3. Guide-rollers and Anti-lift Brackets
Guide-rollers must be installed to ensure that the gate is held vertical. For improved safety, fit additional support posts to prevent the gate from falling over should the guide-rollers fail.
To prevent unauthorised access, fit anti-lift brackets as shown. The gap between the anti-lift bracket and the gate must be less than 5mm.
Ensure that the gate cannot be lifted off the motor pinion with the anti-lift bracket fitted.

CENTURION-D6-SMART-Sliding-Gate-Operators-fig- (5)

Guide-rollers and Anti-Lift Bracket
Additional support post

Side view of gate and different Guide-roller options

GAP <5mm

GAP <5mm

GAP <5mm

GAP <5mm

FIGURE 5. FITTING GUIDE-ROLLERS

page 14

www.centsys.com

SECTION 5
5.4. Starting and Running Forces

NEW SITE INSTALLATION PREPARATION

Test the starting force of the gate as per the diagram. Use a pull scale in both directions to determine the maximum amount of pull force required to set the gate in motion.

Determine the running force of the gate by continuing to pull on the scale with just sufficient force to keep it running. Read and note the maximum value in kgf (kilogram-force) shown on the scale.

Where possible, determine the gate mass.

Our warranty will be void if the pull force and / or gate mass exceeds the below operator specifications:

· Starting force – 30kgf – Maximum over the full length of gate travel · Running (rated) force – 17kgf – Maximum over the full length of gate travel · Maximum gate mass – 600kg

CENTURION-D6-SMART-Sliding-Gate-Operators-fig- (6)

Pull Scale

FIGURE 6. STARTING AND RUNNING FORCES

page 15

www.centsys.com

SECTION 5
5.5. Cabling Requirements

CENTURION-D6-SMART-Sliding-Gate-Operators-fig- (7)

NEW SITE INSTALLATION PREPARATION

8
1 2

9
6 3 5
10

9
7 4

FIGURE 7. CABLING REQUIREMENTS
Legend
1. MAINS SUPPLY CABLE: 90V – 240V AC mains cable via double-pole mains isolator-switch (3 core L.N.E. 1.5mm2 SWA)1,2
2. Optional intercom cable from motor to dwelling (n1 + 6 core3 0.22mm2 multi-strand shielded cable)
3. Optional intercom cable from motor to entry panel (n2 0.22mm2 multi-strand shielded cable)
4. Optional but recommended infrared safety beams (3 core 0.22mm2 multi-stranded)4
5. Optional access control device (3 core 0.22mm2 multi-stranded)
6. Optional pedestrian key-switch (2 core 0.22mm2 multi-stranded) OR
7. Optional keypad (3 core 0.22mm2 multi-stranded)4
8. Optional external radio receiver (3 core 0.22mm2 multi-stranded)5
9. Optional pillar lights (3 core LNE SWA, size according to power requirements)6
10. Optional ground loop for free-exit (1 core 0.5mm2 multi-stranded ­ silicone coated)7
n1 means the number of cores required by an intercom. n2 means the number of cores required by an intercom. 1. Possibly increase cable thickness if pillar lights are installed. 2. Type of cable must adhere to municipal bylaws but typically SWA (steel wire armoured) cable is recommended. The armouring provides excellent screening, which gives better protection against lightning ­ earth one end of the screening). 3. Allows for all features such as pedestrian opening, status LED, etc., to be operated from the intercom handset inside the dwelling. Number of cores and type of cable could vary depending on brand of access control system being used. 4. Wireless accessories are available. Please refer to www.censys.com for further information. 5. For optimum range, an external receiver can be mounted on the wall. 6. Requires an external relay. 7. Consult manufacturer of loop detector for specific details.

page 16

www.centsys.com

SECTION 6

Lubrication

LUBRICATION

The internal gearset of the D6 SMART is lubricated by means of an oil bath.

The D6 SMART is supplied with oil in its gearbox and does not require routine oil changes.

page 17

www.centsys.com

SECTION 7

OPERATOR INSTALLATION

7.1. New Site Installations

OPERATOR INSTALLATION

When installing the D6 SMART, it is important to take note of the information found in Sections 7.1.1. and 7.1.2. when determining the position of the Foundation Plate, and the height of the D6 SMART in relation to the gate that is to be automated.
7.1.1. Locating an Initial Reference Point
Firstly, it is necessary to establish a reference point. To do this, manually open and close the gate so that it moves past a stationary point (i.e. a vertical spike), and determine which part of the gate (including its wheels) protrudes the furthest towards where the D6 SMART will be installed. Refer to the examples shown below.

Check for wheels, palisade, uprights, etc. that could potentially collide with the pinion.

Palisade Gate
GATE MOVEMENT

Gate Rail

Palisade Warped Gate
GATE MOVEMENT

Gate Rail

Foundation for D6 SMART

Foundation for D6 SMART

Edge that protprurodtersudoeust
thetfhuertmhoest (Reference Point)

Edge that protrudes the furthest (Reference Point)

GPaltiesade Gate
GATE MOVEMENT

Gate Rail

Palisade Gate
GATE MOVEMENT

Gate Rail

Foundation for D6 SMART

Palisade

Foundation for D6 SMART

Gate Wheel

Possible Collision

Edge that protprurodtersudoeust
thetfhuertmhoest (Reference Point)

Possible Collision

Edge that protprurodtersudoeust
thetfhuertmhoest (Reference Point)

FIGURE 8. FINDING A REFERENCE POINT

Once the point which protrudes the furthest has been found, this will be the
reference point to be used when finding the optimum position for the D6 SMART.

page 18

www.centsys.com

SECTION 7

OPERATOR INSTALLATION

7.1.2. Minimum Clearances

Below are site plan examples illustrating the minimum clearances required when installing the D6 SMART.

Pillar

Gate Rack

Pillar

Foundation

20mm (Minimum) 40mm and above(Ideal)
Theft-deterrent Cage

20mm (Minimum) 40mm and above(Ideal)
D6 SMART FIGURE 9. MINIMUM CLEARANCES – SIDES
Gate Rack

Foundation Trench

Trench

245mm 120mm

Most extreme path of the
Override Lever
Theft-deterrent cage
Locking Bar

Trench FIGURE 10. MINIMUM CLEARANCES – FRONT

page 19

www.centsys.com

SECTION 7
7.1.3. Locating the Operator’s Position

OPERATOR INSTALLATION

To ensure that the operator does not protrude into the driveway, install the Foundation Plate at least flush with the driveway entrance.
It is typical to mount the rack above the pinion as shown in Figures 11, 13 and 15 for each type of rack considered. However, in each case, Figures 12, 14 and 16 show the rack mounted underneath.

If there is space to mount the rack underneath without fouling the ground as the gate moves, the following are the pros and cons:
Pros · The rack is more hidden from view · It provides a very effective anti-lift bracket · It ensures that, since the gate beds in, the rack does not drop onto the
pinion, loading the operator unnecessarily
Cons · Rack teeth face up vertically, potentially collecting dirt · Could require the use of a custom bracket

The measurements given below are based on the three different racks supplied by Centurion Systems (Pty) Ltd and are to be used as guidelines only.
Steel Rack

25mm (Typical Steel Rack Width)

Minimum space from edge of Foundation Plate to
reference point of edge that protrudes the furthest. (Section 7.1.1.)
49mm-51mm

25mm (Recommended to allow for adjustment)
11mm

168mm1 115mm1,2 83mm

Flat bar welded to Foundation Plate and rail Concrete Foundation

Foundation Plate

FIGURE 11. STEEL RACK ABOVE PINION
1. Includes 3mm clearance required between rack and pinion 2. Distance between bottom of the Foundation Plate and bottom edge of the Rack Tooth

The principles of installation on a Steel rack is to position in the middle of the output pinion with the operator fully forward on the slots.

page 20

www.centsys.com

25mm (Recommended to allow for adjustment)
11mm 52mm1,2

SECTION 7

25mm (Typical Steel Rack Width)

OPERATOR INSTALLATION
Minimum space from edge of Foundation Plate to reference
point of edge that protrudes the furthest.
(Section 7.1.1.) 49mm-51mm

Foundation Plate

Raised Concrete Foundation
1. Includes 3mm clearance required between rack and pinion 2. Distance between bottom of the Foundation Plate and top edge
of the Rack Tooth
RAZ Rack

FIGURE 12. STEEL RACK BELOW PINION
The principles of installation on a Steel rack is to position in the middle of the output pinion with the operator fully forward on the slots.

30mm (Typical RAZ Rack Width)

Minimum space from edge of Foundation Plate to
reference point of edge that protrudes the furthest. (Section 7.1.1.)
53mm-55mm

25mm (Recommended to allow for adjustment)
11mm

168mm1 115mm1,2 83mm

Flat bar welded to Foundation Plate and rail Concrete Foundation

Foundation Plate

FIGURE 13. RAZ RACK ABOVE PINION
1. Includes 3mm clearance required between rack and pinion 2. Distance between bottom of the Foundation Plate and bottom edge of the Rack Tooth

The principles of installation on a RAZ rack is to position in the middle of the output pinion with the operator fully forward on the slots.

page 21

www.centsys.com

25mm (Recommended to allow for adjustment)
11mm 51mm1,2

SECTION 7

29.5mm (Typical Steel Rack Width)

OPERATOR INSTALLATION
Minimum space from edge of Foundation Plate to reference
point of edge that protrudes the furthest.
(Section 7.1.1.) 53mm-55mm

Foundation Plate

Raised Concrete Foundation
1. Includes 3mm clearance required between rack and pinion 2. Distance between bottom of the Foundation Plate and top
edge of the Rack Tooth
Nylon Angle Rack

FIGURE 14. RAZ RACK BELOW PINION
The principles of installation on a RAZ rack is to position in the middle of the output pinion with the operator fully forward on the slots.

If using nylon angle rack, please ensure that the weight and pull force of the gate does not exceed the strength limit of the rack.

29mm (Typical Nylon Rack Width)
Minimum space from edge of Foundation Plate to
reference point of edge that protrudes the furthest. (Section 7.1.1.)
53mm-55mm

25mm (Recommended to allow for adjustment)
11mm

165mm1 115mm1,2 83mm

Flat bar welded to Foundation Plate and rail Concrete Foundation
1. Includes 3mm clearance required between rack and pinion 2. Distance between bottom of the Foundation Plate and
bottom edge of the Rack Tooth

Foundation Plate FIGURE 15. NYLON RACK ABOVE PINION
The principles of installation on a Nylon rack is to position in the middle of the output pinion with the operator fully forward on the slots.

page 22

www.centsys.com

25mm (Recommended to allow for adjustment)
11mm 51mm1,2

SECTION 7

29mm (Typical Nylon Rack Width)

OPERATOR INSTALLATION

Minimum space from edge of Foundation Plate to reference
point of edge that protrudes the furthest.
(Section 7.1.1.) 53mm-55mm

Foundation Plate
Raised Concrete Foundation
FIGURE 16. NYLON RACK BELOW PINION
1. Includes 3mm clearance required between rack and pinion 2. Distance between bottom of the Foundation Plate and top edge of the Rack Tooth
The principles of installation on a RAZ rack is to position in the middle of the output pinion with the operator fully forward on the slots.

page 23

www.centsys.com

SECTION 7
7.1.4. Foundation Plate Installation
7.1.4.1. Assembling the Foundation Plate
Place the three mounting bolts through the holes of the foundation plate an secure them into position using three half-nuts. The M10 half-nuts should be tightened to 20Nm.

OPERATOR INSTALLATION

Half-nut

View once mounting bolts secured in position

The foundation plate can either be set into a new concrete foundation, as in Section 7.1.4.2, or bolted down onto an existing concrete plinth as in Section 7.1.4.3.

Mounting Bolt

FIGURE 17

Mounting Bolt
Bolt-down point for existing Concrete Plinth Tab Mounting Bolt

Towards Gate

Cutouts for Conduit (New and Existing Installations)
Bolt-down point for existing Concrete Plinth
Mounting Bolt
Tab Legs Bolt-down point for existing Concrete Plinth

Tab Legs

Tab
FIGURE 18. ASSEMBLED FOUNDATION PLATE – TOP VIEW

7.1.4.2. New Concrete Foundation

Using a pair of pliers, gently bend the two tabs of the foundation plate down to a 90° angle as shown in Figure 19.

Again, using a pair of pliers, gently bend the two legs on each tab to an angle of 90° in opposite directions as shown in Figure 20.

View once tabs have been bent down correctly

Foundation Plate

View once legs have been bent
correctly

Bottom face of the Foundation Plate

Tab

FIGURE 19

Tab Legs

FIGURE 20

page 24

www.centsys.com

SECTION 7
Lay the cabling conduit so that it routes the cables to the back of the Foundation Plate. Ensure that 30mm of conduit protrudes above the concrete.
Using medium-strength concrete (25MPa), cast the plinth according to the dimensions as shown in Figure 21.
When using a concrete foundation, it is recommended that the foundation plate is welded to the rail/track of the gate using a short length of flat bar, as shown in Figure 22. This makes it possible to complete the whole mechanical and electrical installation without having to wait for the concrete to set. After completing the installation, the concrete can be poured and the operator left in manual mode until the concrete has set. Do not operate the motor until concrete has completely set.
7.1.4.3. Existing Concrete Plinth

300mm

Rail 400mm
Foundation Plate Nut

If bolting onto an existing concrete plinth, place the foundation plate down in the correct position and use the plate as a template for marking the rawl bolt holes.
Check that the M10 halfnuts are tightened to 20Nm on the mounting bolts.

Washer

Rerouting of existing cables may be necessary.

Expansion Stud

page 25

OPERATOR INSTALLATION
300mCmabling conduit exiting at the back
of the Foundation Plate
FIGURE 21 Rail
Flat bar welded to Foundation Plate and rail FIGURE 22
Mounting Bolt
FIGURE 23 www.centsys.com

SECTION 7
7.2. Retro-fit Installations (Existing Sites)

OPERATOR INSTALLATION

The D6 SMART has been designed to retro-fit into most existing D3, D5, or D5-Evo installations, with the following provisions;

· If the unit is installed with the gate in the closed position and the unit on the lefthand side (from the inside of the property), the rack should extend at least 75mm past the centre line of the existing pinion

· If the existing unit is mounted with the maximum clearance to the Foundation Plate, the new unit will require that the rack be re-adjusted to obtain the correct mesh between the rack and pinion, as the existing bolts will be too short

If the existing Foundation Plate is in a good condition, it is not necessary to replace it with the D6 SMART Foundation Plate. However, if the existing Foundation Plate is corroded or needs to be replaced for whatever reason, the D6 SMART foundation plate can accommodate the existing footprint without the need to re-route cable conduits.

7.2.1. Retro-fitting if the Existing Foundation Plate is Unusable

Thoroughly inspect the existing Foundation Plate to determine whether or not it is fit to be reused. A foundation plate that is corroded, or otherwise damaged should be discarded and replaced with the D6 SMART foundation plate.
Follow the procedure found under Section 7.1.4.3. – “Existing Concrete Plinth”.
There is an allocated slot for existing conduit from previous D3, D5, and D5-Evo installations as shown in Figure 24.

Allocated Conduit Slot

Retro-fitted D6 SMART Foundation Plate Existing Conduit
FIGURE 24

7.3. Conduit and Cable Length

Route the cables as determined in Section 5.5 – “Cabling Requirements”.
Make sure that the conduits protrude above the concrete foundation. The mains cables should protrude 360mm above the concrete foundation, and all signal cables (i.e. beams, etc.) 550mm above the concrete foundation, as shown in Figure 25.

(Signal Cables) 550mm (Mains) 360mm

30mm
FIGURE 25

page 26

www.centsys.com

SECTION 7
7.4. Preparing the D6 SMART for Installation

OPERATOR INSTALLATION

Open the Camlock Cover, and insert the Operator Key into the Camlock. Unlock it by turning the key anti-clockwise.
There is no need to open the Release Handle to remove the cover of the D6 SMART.

Camlock Cover Operator Key Camlock

FIGURE 26

Cover

Remove the cover of the D6 SMART to expose the internal components, and place it one side in a safe location.

Control Card Accessory Tray Charger Gearbox

7.4.1. Removing the Charger (if required)
Disconnect the Charger from the D6 SMART Control Card at either Point “A” or Point “B”.
If the disconnection is made at Point “A”, note that there are two connector blocks that need to be disconnected from the Control Card.
Disconnect the Earth Harness from the Charger at Point “C”, and store it in a safe place.

Control Card Harness Charger
page 27

FIGURE 27
A
B
C
FIGURE 28 www.centsys.com

SECTION 7
Remove the Charger from the lower battery tray by gently pushing the Charger slightly down whilst pulling it towards the front of the D6 SMART. It should slide forward and off with ease.

Power Supply Harness
Battery Harness
Charger

7.4.2. Removing the Lower Battery Tray
Locked

OPERATOR INSTALLATION

Locked

FIGURE 29

Unlocked

Locked Unlocked

A Unlocked

To remove the Lower Battery Tray, firstly ensure that the Camlock is in the “unlocked” position (Figure 30 marked as “A”). Open the release handle until the Camlock Cam is visible.
Using a flat screwdriver, lever the left and right Tabs inward, lift the Lower Battery Tray up, and then out towards the front of the D6 SMART.

Left Tab
Lower Battery Tray

page 28

FIGURE 30
Flat Screwdriver
Right Tab
FIGURE 31 www.centsys.com

SECTION 7
7.4.3. Removing the Control Card
D6 SMART DX Control Card

Disconnect the Motor Wires at Point “D” and the Override Sensor
Harness at Point “E” from the Control Card as Shown in Figure 32.

Motor Wires

OPERATOR INSTALLATION
D E

Override Sensor Harness
Hinge the Control Card forward
Remove the Control Card by pushing the right tab behind the Control Card backwards. This will allow the Control Card to hinge forward.

FIGURE 32
Push the right tab backwards

Lift the Control Card upwards and away form the D6 SMART, which will unhinge it from the hinge tabs found on the sides of the Control Card.
Take care not to snag the remaining harnesses in the harness retainers when removing the Control Card from the platform.
Store the Control Card in a safe place.
The D6 SMART is now ready to be mounted onto the Foundation Plate.

D6 SMART DX Control Card
Harnesses
Harness Retainer

FIGURE 33 FIGURE 34

page 29

www.centsys.com

SECTION 7
7.5. Mounting the Gearbox
For a new site installation, place a Half-nut and a Bottom Height Adjuster onto each Mounting Bolt as shown in Figure 35.
Note the orientation of the Bottom Height Adjusters.

OPERATOR INSTALLATION
D6 SMART Foundation Plate
Bottom Height Adjuster Washer
Half-nut

Adjust the Half-nuts to be 12mm clear from the Foundation Plate.

Bottom Height Adjuster

D6 SMART Foundation Pate

FIGURE 35

12mm

HalfNut

FIGURE 36
For a retro-fit installation, remove the original washers and height adjustment nuts from the existing foundation plate and then place a Half-nut and a Bottom Height Adjuster onto each existing Mounting Bolt, as shown in Figure 37.

Note the orientation of the Bottom Height Adjusters.
If the existing unit was mounted with the maximum clearance to the foundation plate, the new unit will require that the rack be re-adjusted to obtain the correct mesh between the rack and pinion.

Existing Conduit

Existing D3, D5, or D5-Evo Foundation Plate Bottom Height Adjuster Washer Half-Nut
FIGURE 37

page 30

www.centsys.com

SECTION 7
7.5.1. Removing the Cable Shield

OPERATOR INSTALLATION

The Cable Shield needs to be removed before mounting the D6 SMART onto its Foundation Plate. This is done by levering the bottom end of the cable shield away from the motor until it unclips from the gearbox, and then slide it up.

Step 1

Step 2

Cable Shield

Cable Shield

FIGURE 38

Once the Cable Shield has been removed, place the D6 SMART into position over the three Mounting Bolts, aligning them with the three slots at the bottom of the gearbox and rest the D6 SMART onto the Bottom Height Adjusters.

Gearbox
Mounting Bolt

Slots

Foundation Plate

Mounting Bolt

TOP VIEW

FIGURE 39

Once the Gearbox is resting on top of the Bottom Height Adjusters, slide the D6 SMART as far as possible towards the gate to allow for later adjustment.
page 31

FIGURE 40 www.centsys.com

SECTION 7
7.6. Routing the Cables
Route cables as determined in Section 5.5 – “Cabling Requirements”.
“Point A” is the entry point for cables with the conduit installed at the back of the unit for new installations as shown in Figure 41.
Although “Point B” is the entry point for cables with the conduit from existing D3, D5 and D5-Evo installations, it is recommended to route the cable under the gearbox and out the back through “Point A” as shown in Figure 42.

OPERATOR INSTALLATION
A B

Section View A-A

FIGURE 41

A
A B

A
FIGURE 42. CABLE ROUTING FOR NEW INSTALLATIONS
Section View A-A

A
A B

A

FIGURE 43. CABLE ROUTING FOR RETRO-FITS WITH LONGER CABLES

The method shown in Figure 43 above, is recommended for retro-fit installations, as it is easier to remove the motor should it be necessary to do so at a later stage. However, cable lengthening may be required.

page 32

www.centsys.com

SECTION 7

OPERATOR INSTALLATION

Should the existing cables for a retro-fit installation be too short to route through “Point A” as shown in Figure 43 on the previous page, they can be routed directly through “Point B” to accommodate the shorter length. Note that routing the cables through “Point B” as shown in Figure 44, may make it more challenging to remove the D6 SMART for whatever reason at a later stage.

Section View A-A

B
A A

A
FIGURE 44. CABLE ROUTING FOR RETRO-FITS WITH SHORTER CABLES
Replacing the Cable Shield onto the Gearbox
Cable Shield
Tilt the top of the Cable Shield towards the Gearbox, and slide it down so that the top of the Cable Shield is flush with the top edge of the Gearbox.

From the other side of the gate, firmly push the bottom sides of the Cable Shield inward, towards the gearbox. Two clicks will be heard (one from each side of the Cable Shield) if the Cable Shield has engaged with the gearbox correctly.
page 33

Gearbox FIGURE 45
Gearbox
Cable Shield FIGURE 46 www.centsys.com

SECTION 7
7.7. Manual Override

OPERATOR INSTALLATION

Before mounting the rack to the gate, ensure that the D6 SMART is in Manual Override. Follow the instructions below.

To disengage (Manual Override) the motor, ensure that the Camlock is in the “unlocked” position, and pull the Release Handle as far left as it will go. The Motor will then be placed in a temporary state of disengagement.

Release Handle

Camlock

Manual Override Latching
In the event of a power failure, it may be required to lock the cover in place whilst “latching” the manual release (i.e. manual release permanently enabled). This helps prevent theft of the unit, or its components, and provides full protection from the elements.
With the release handle in the open position, slide the Override Cam located on the inside of the handle towards the gearbox, and a “click” can be heard once it has located correctly. Return the handle to the closed, or locked, position. This allows continued manual operation of the gate while ensuring that the cover remains securely locked in place. See Figure 48.
To re-engage the D6 SMART (i.e. take the operator out of latched Manual Override), push the Release Handle Override Cam to the left and then slide it towards the Camlock. See Figure 49.

Release Handle Override Cam
Release Handle
Camlock

page 34

Gearbox FIGURE 47
Release Handle FIGURE 48
Release Handle Override
Cam FIGURE 49 www.centsys.com

SECTION 7
7.8. Height Adjustment

OPERATOR INSTALLATION

The D6 SMART’s unique Height Adjustment System adjusts from the top of the gearbox. This adds further security to the system, as it is not possible to access the lock nuts from the outside of the gearbox.

Lock Nut Spring Washer

Top Height Adjuster

B

Mounting

Bolt

Washer

Bottom Height Adjuster

B

Foundation Plate

Only add the Spring Washers and Lock Nuts once the Rack has been installed and the operator height is correct. See Section 7.9.2. – “Finalising the Height Adjustment”.
Place a Top Height Adjuster onto each Mounting Bolt so that it engages with the teeth on the Bottom Height Adjuster.
Note the orientation of the Top Height Adjuster as shown in Figure 50 and 51.
Using a ratchet and a 19mm socket, turn the Top Height Adjuster anticlockwise to lift the Operator, or turn it clockwise, to lower the Operator.
Using a spirit level, ensure that the Operator is level. If not, use the Height Adjusters to level the Operator.

Spirit Level
Control Card Platfrom
Gearbox
Height Adjustment System
Foundation Plate

Section View B-B
FIGURE 50 Gearbox
Top Height Adjuster
FIGURE 51

FIGURE 52

page 35

www.centsys.com

SECTION 7
7.9. Mounting the Rack

OPERATOR INSTALLATION

The rack must be securely mounted to the side of the gate. It must be parallel with the gate rail and there must be a 2-3mm gap between the rack teeth and the teeth of the pinion.

Before mounting the rack, raise the operator an additional 3mm. Ensure that the D6 SMART Gearbox is in Manual Override. Refer back to Section 7.7 – “Manual Override”.
Start with the gate either fully-open or fully-closed. Slide the D6 SMART back towards the gate to where the Pinion will sit just under where the rack will be fixed to the gate. Rest the rack directly onto the Pinion (let it mesh fully) while welding / bolting the rack into position. Level the other end and fix that end to the side of the gate, as shown in Figure 55.

3mm raise

3mm raise FIGURE 53 Gate Rack
D6 SMART Pinion
FIGURE 54

Spirit Level
Level this end of the rack, and fix it to the gate

Pinion

Foundation Plate
FIGURE 55. THE RACK AND OPERATOR FROM THE GATE’S PERSPECTIVE
Refer to the instructions on how to fix the different types of rack to a gate in Section 7.9.1. – “Fitting Different Types of Rack to the Gate”.

page 36

www.centsys.com

SECTION 7

OPERATOR INSTALLATION

Slide the gate halfway along the first section and level the unsecured end, ensuring that the rack is resting on the Pinion, not pressing down. Continue this way to fix all sections.

Before fully fixing each section of rack, slide the gate backwards and forwards along the section, checking that the rack is only resting on the Pinion, and not pressing down onto it.

First Secured End

Spirit Level

Foundation Plate

Pinion

Level this end of the rack, and fix it to the gate

FIGURE 56. THE RACK AND OPERATOR FROM THE GATE’S PERSPECTIVE

Lower the operator 3mm to achieve the required 3mm tooth clearance.
Ensure that operator mounting bolts are securely tightened.

3mm lower

3mm tooth gap
3mm lower FIGURE 57

page 37

www.centsys.com

SECTION 7
7.9.1. Fitting Different Types of Rack to the Gate Steel Rack

OPERATOR INSTALLATION Gate

Fix the Steel Rack with the steel angle brackets provided. The brackets must be spaced no more than 300mm apart.

±300mm

When joining different lengths of Steel Rack, a simple way of ensuring that the correct pitch spacing is achieved, is to clamp a small off-cut between the two pieces.
Do not weld the off-cut to the gate or the join.

Off-cut

±300mm

Steel Rack Steel Bracket Steel Rack FIGURE 58 Welded
join
Clamp FIGURE 59

page 38

www.centsys.com

SECTION 7
RAZ Rack

Gate

OPERATOR INSTALLATION

Fix the RAZ Rack to the side of the gate using the TEK screws provided. Use the vertical slots in order to allow for adjustment.
TEK screw (Self-drilling and -tapping)

RAZ Rack
FIGURE 60

When fitting RAZ Rack, it is easier to start on the right and work towards the left. The RAZ Rack sections simply interlock with each other.
Fit an additional fixing screw through the horizontal slots to secure the rack to the gate directly above the Pinion when the gate is in the closed, pedestrian and open positions as shown in Figure 60. Fit an addition screw through the horizontal slots at the ends of each section of Rack to further strengthen the joins.
page 39

Start on the right and work to the left
FIGURE 61
FIGURE 62 www.centsys.com

SECTION 7
Nylon Angle Rack

OPERATOR INSTALLATION

Fix the Rack to the side of the gate using TEK screws.
Ensure that all the mounting holes provided in the angle section are used.

TEK screw (Self-drilling and -tapping)

Gate
Nylon Angle Rack FIGURE 63

When joining two lengths together, simply butt each section firmly together to ensure that the correct
pitch is achieved.

Nylon Angle Rack

Butt firmly together

Nylon Angle Rack
FIGURE 64

page 40

www.centsys.com

SECTION 7
7.9.2. Finalising the Height Adjustment
Slide the D6 SMART away from the gate so that the rack is centred above the Pinion. Final adjustment to the position of the gearbox should be done at this point.
7.9.2.1. Placing and Routing the Earth Harness
Place the Ring Lug-end of the Earth Harness onto the mounting bolt on the right-hand side of the Gearbox.
To ensure that the Earth Harness is able to reach the Charger once connected to the mounting bolt, it is recommended that it is positioned at the angle depicted by the middle line, but not at an angle exceeding the lines at either side of it as the Earth Harness will not be able to reach the Charger.
page 41

OPERATOR INSTALLATION
Gate
Pinion
FIGURE 65
Earth Harness Ring Lug Mounting Bolt
Gearbox FIGURE 66
Do not exceed this
angel Middle Line (Ideal position)
Ring Lug
Do not exceed this
angel FIGURE 67
www.centsys.com

Route the Earth Harness up to the left and place it into the Cable Management Clip as shown in Figure 68.
The Earth Harness will need to be routed under the battery at a later stage.
7.9.2.2. Placing the Spring Washers and Lock Nuts

Cable Management
Clip
Earth Harness Gearbox FIGURE 68

Only add the Spring Washers and Lock Nuts once the Rack has been installed and the operator height is correct.

Place one Spring Washer and one Lock Nut onto each of the Mounting Bolts. Tighten all of the Lock Nuts with a 17mm socket to secure the Earth Harness and the height of the D6 SMART firmly in position.

page 42

Lock Nut
Spring Washer
Earth Harness FIGURE 69
www.centsys.com

SECTION 7
7.10. Re-assembling the D6 SMART
7.10.1. Override Sensor

OPERATOR INSTALLATION

If the Override Sensor has previously been removed, take note of how it is placed back into position correctly, before continuing with the installation.

Override Sensor

A

Override Sensor Locating Slot
Note the orientation of the Override Sensor

B
Push the Override Sensor “A” firmly until it seats onto the gearbox “B”

FIGURE 70. OVERRIDE SENSOR
7.10.2. Routing the Override Sensor Harness
It is important to ensure that the harness for the Override Sensor is routed through the correct location when inserting the Lower Battery Tray back into position.

The Override Sensor harness is routed directly in front of the electric motor.
There is a groove located in the middle of the Lower Battery Tray, on the motor’s side. The harness needs to be routed between the electric motor and the Lower Battery Tray here as the Lower Battery Tray is placed back into position.

Lower Battery Tray

page 43

Groove for Harness
FIGURE 71 www.centsys.com

SECTION 7

OPERATOR INSTALLATION

7.10.3. Placing the Lower Battery Tray and Charger Back into Position

Ensure that the Camlock is in the “unlocked” position and that the Release Handle is partially open.

Place the Lower Battery Tray into position. Whilst doing this, route the cabling and harnesses through. A click from both sides will be heard if the tray is fitted correctly.

Ensure that the Cam Driven Slide is in the correct position before placing the Lower Battery Tray back into the Gearbox. i.e. Push it to the left.
Refer to Section 7.4 “Preparing the D6 SMART for Installation” for further information on locked and unlocked positions
Note the position of the Override Sensor Harness.

Cam Driven Slide Cam Driven Slide

Locked Unlocked

Gearbox
Groove for Harness
Lower Battery Tray

Override Sensor Harness
Earth Harness

Cam Driven Slide

FIGURE 72. LOWER BATTERY TRAY PLACEMENT

page 44

www.centsys.com

SECTION 7

Electric Motor

OPERATOR INSTALLATION

Place the Charger back into position by aligning the three feet at the bottom of the Charger with the three slots found on top of the Lower Battery Tray.
Place the studs of the Charger into the three holes on the Lower Battery Tray. Firmly press the Charger down, and push it toward the Electric Motor, sliding it along the slots.

Slots
Lower Battery Tray
Charger
Lower Battery Tray

Stud

Slot

FIGURE 73. CHARGER PLACEMENT 7.10.4. Placing the Control Card back into Position

Accessory Tray

Tilt the control card and align the wider gap with the clips shown in Figure 74.

Ridge
Clip
Ridge Left Tab
Control Card

Once aligned, hinge the Control Card under the tab’s lip, and firmly press downward on both sides in front of the Control Card.
This will engage the Control Card into the hinges at the front of the Accessory Tray.
A click from both sides will be heard if this is done correctly.

Left Tab Right Tab
Control Card
Accessory Tray

page 45

Wider gap
FIGURE 74
FIGURE 75 www.centsys.com

7.10.5. Reconnecting the Harnesses to the Control Card and Charger
Reconnect the Motor Wires at Position “A” and the Override Harness at Point “B” on the Control card.

The black motor wire is connected on the far Left of the Control Card, and the blue on the immediate right of the black.

AB
A B

Reconnect the Charger Harness to the point from which it was disconnected earlier, either at Position “C” or at Position “D”.
If the connection is made at Point “C”, note that there are two connector blocks that need to be reconnected to the Control Card.
Utilise the Cable Retainers at the bottom of the accessory storage to neaten up the wiring, and the overall installation.

Harness Charger

FIGURE 76
C D
FIGURE 77

page 46

www.centsys.com

SECTION 8
8. Completing the Installation
8.1. Fitting the Batteries

COMPLETING THE INSTALLATION

Push the left tab backwards

Swing the upper assembly forward

Gently push the left tab behind the Control Card backwards. This will allow the entire upper assembly to hinge forward.

Place a Battery into the designated area found on top of the Lower Battery Tray on the left. Route the Power and Signal cables between the right Battery compartment and the Electric Motor then place the remaining Battery in it’s designated area on the right.
Note the orientation of the two Batteries. Ensure that the Battery Terminals always face the direction of the Charger.
Take extra care not to pinch the Earth Harness when placing the Battery on the right. The Earth Harness must be routed under this Battery and out the gap found in front of the Battery once in position.
Swing the upper assembly back into position over the batteries.
A click should be heard if this is done correctly.
Failure to properly click the control card and upper assembly into place will result in erratic behaviour of the gate motor.

Battery Battery
Lower Battery Tray page 47

FIGURE 78 Battery
Lower Battery Tray
FIGURE 79 Battery
Earth Harness FIGURE 80 www.centsys.com

SECTION 8
Connect both batteries up with the supplied harness, and ensure that it is connected to the left side of the Charger.
Route the accessory cables around the back of the Charger and through the cable retainers found in front of the Control Card.
Please ensure that the battery connections match the selected battery terminals RED to RED, BLACK to BLACK.

Battery Harness
Charger

COMPLETING THE INSTALLATION FIGURE 81

8.2. Wiring and Connecting the AC Mains Input

Ensure Mains Power is disconnected before proceeding!
Push the Live, Neutral and Earth wires through the smaller end of the Mains Cover, and connect them to the Mains Connector Plug.

Charger

Refer to the Right-Hand Side of the Charger to ensure the wires are connected to the Mains Connector Plug in the correct positions.

Charger

Mains Connector
Plug Live Neutral AC Mains Cover
Incomming AC Mains Earth
FIGURE 82

Connect the AC Mains Cable Connector into the connector on the right-hand side of the Charger
Once connected, remember to slide the AC Mains Cover over the AC Mains Connector for added protection.
Connect the Earth Wire to the Earth Tab on the right-hand side of the Charger just below the AC Mains.

Lower Battery Tray

page 48

FIGURE 83 www.centsys.com

SECTION 8
8.3. Accessory Installation and Storage

COMPLETING THE INSTALLATION

There are dedicated trays below the D6 SMART Control Card to conveniently install and store any accessories connected to the Operator.

Control Card

Right Door

Opening the two retaining doors, reveal the storage space for accessory products, such as the G-ULTRA, or External Receivers.

Left Door

Wire the accessory device to the operator, place it into the space provided, and close the door.

Accessory Retaining Door

G-ULTRA

FIGURE 84 FIGURE 85

page 49

www.centsys.com

SECTION 9
9. 24V Low-voltage Charger

24V LOW-VOLTAGE CHARGER

9.1. Isolating Transformer Safety Requirements

IMPORTANT TRANSFORMER SAFETY INFORMATION

The 24V Low-voltage Charger is not included with this operator.

ATTENTION!
To ensure the safety of people and possessions, it is important that you read all of the following instructions.
Incorrect installation or incorrect use of the product could cause serious harm.
The Isolation Transformer that supplies the 24V Low-voltage AC Charger;
· MUST meet all Country Regulatory Standards · MUST meet all Local Regulatory Requirements · MUST be a Safety Isolating Transformer · MUST be Double-wound · MUST be fitted with a Thermal Fuse on the Primary / Input of the Transformer · MUST be installed according to Country and Local Regulatory Standards

· All installation, repair, and service work to this product must be carried out by a suitably qualified person
· Do not install the equipment in an explosive atmosphere; the presence of flammable gases or fumes is a serious danger to safety
· Before attempting any work on the system, turn off electrical power to the Isolating Transformer and disconnect the batteries
· The Mains power supply of the Isolating Transformer must be fitted with an all-pole switch with contact opening distance of 3mm or greater; use of a hydraulic breaker with all-pole circuit break is recommended
· Make sure that an earth leakage circuit breaker with a threshold of 30mA is fitted upstream of the system
· Make sure that the earthing system is correctly constructed and that all metal parts of the system are suitably earthed

Isolating Transformer Requirements Output Voltage Output Current Transformer Fuse Protection

24V AC MIN (Loaded) 28V AC MAX (Unloaded/Open circuit)

2A MIN (@ 24 V AC = 50VA)

Type

Rating

Thermally Fused

According to VA rating

TABLE 2

page 50

www.centsys.com

SECTION 9

24V LOW-VOLTAGE CHARGER

9.2. Introduction

The 24V Low-voltage AC SMART Charger was developed to complement 24V gate operators, and is ideal for residential sites.

The 24V Low-voltage AC SMART Charger makes use of a Low-voltage AC input (24­28V AC) supplied via an isolation transformer to supply and charge the batteries of 24V gate operators.

9.3. 24V Low-voltage Charger Technical Specifications

Input Voltage

Low-voltage 24-28V AC 50/60Hz

Output Voltage

27.4V DC (float) +/- 1%

Output Current

1.7A +/-5%

9.4. 24V Low-voltage Charger Identification

TABLE 3

2

3

4

1

95mm

108mm

5

52mm

1. Charger to Batteries Output 2. 24V Low-voltage Charger 3. Charger to Control Card Output
9.5. Wiring

FIGURE 86 4. 24-28V AC Input Terminals (from transformer) 5. Earth Tab

12V Battery 12V Battery

Charger Input from Step-down Transformer
24 – 28V AC Out

Earth
24V Low-voltage charger Thermally-fused Step-down Transformer

page 51

AC Mains in
Dx SMART Control Card

FIGURE 87

www.centsys.com

SECTION 10

WIRING THE CONTROL CARD ON ITS DEFAULT SETTINGS

10. Wiring the Control Card on its Default Settings

The D6 SMART Control Card’s Input / Output terminals are defaulted with the following configuration;

Control Card Terminal I/O1 I/O2 I/O3

Default Setting
Trigger (TRG) Pedestrian (PED) Infrared Beam Close (IRBC)

Control Card Terminal I/O4 I/O5 I/O6

10.1. Closing Infrared Beam Wiring (I5 Infrared Beams)

Default Setting
Gate Status Unassigned Unassigned
TABLE 4

DX Control Card

IRB Receiver

12V/24V –

12V/24V +

COM

NC

NC

COM NO

IRB Transmitter

12V/24V + 12V/24V –

SafeCom is not available if connected to COM

Please contact Centurion Systems (Pty) Ltd for directions on wiring Infrared Beams in an opening configuration.

If wired to I/O6; Configure for SafeCom in App

page 52

FIGURE 88 www.centsys.com

SECTION 8

COMPLETING THE INSTALLATION

10.2. Closing Infrared Beam Wiring (Photon Infrared Beams)

IRB Receiver

12V/24V +

12V/24V –

COM

NC

NC

COM NO

Dx SMART Control Card

Wireless IRB Transmitter

SafeCom is not available if connected to COM

Please contact Centurion Systems (Pty) Ltd for directions on wiring Infrared Beams in an opening configuration.

If wired to I/O6; Configure for SafeCom in App

10.3. Wireless Photon SMART beams

Dx SMART Control Card

Wireless IRB Receiver

FIGURE 89

Wireless IRB Transmitter
Opening or Closing beams can be configured using the My Centsys Pro mobile application.
page 53

FIGURE 90 www.centsys.com

SECTION 8

COMPLETING THE INSTALLATION

10.4. External Radio Receiver and Loop Detector Wiring

DX Control Card

Free-exit Loop

NC COM NO
Loop Detector

12V/24V 12V/24V + COM
NO

External Radio Receiver
NC COM NO

12V/24V 12V/24V + COM
NO

Configured using the MyCentsys Pro mobile application

FIGURE 91

page 54

www.centsys.com

SECTION 8

COMPLETING THE INSTALLATION

10.5. Anti-tamper Alarm with Two Wizo-Link Devices

Please note that this wiring diagram is intended for legacy sites where WiZo devices have been installed. The WiZo-Link has been officially discontinued and, as such, no new devices are sold.
· The trigger/TRG (green wire) in Figure 89 can be either wired into IO1 – IO6, depending on the sites individual needs
· IO1 – IO6 can be configured using the MyCentsys Pro mobile application · IO1 is configured as trigger/TRG by default

Two WiZo-Link wireless modules may be connected to the system for a signal to be wirelessly relayed to a third party alarm in the event that the anti-tamper input is triggered.

WiZo 2 (Inside House)

DX Control Card

+12-24V DC GND
COM NO

12V DC Lead Acid Battery

Siren
WiZo 1’s INPUT is linked to WiZo 2’s OUTPUT.

WiZo 1 (Inside D6 SMART)
+12-24V DC GND IN COM

FIGURE 92. ANTI-TAMPER ALARM WIRING WITH TWO WIZOS

page 55

www.centsys.com

SECTION 8
10.6. Solar Panel Wiring 10.6.1. Wiring a single Solar Panel
Solar Regulator

COMPLETING THE INSTALLATION

Specified Solar Battery

Specified Solar Battery

*Batteries: 33Ah – 200Ah

DX Control Card

+-

· Solar Panel: 80W, 36V Output
· Solar Panel Bracket: 20W – 150W

page 56

FIGURE 93. SINGLE SOLAR PANEL www.centsys.com

SECTION 8
10.6.2. Wiring Two Solar Panels
Solar Regulator

COMPLETING THE INSTALLATION

Specified Solar Battery

Specified Solar Battery

*Batteries: 33Ah – 200Ah

DX Control Card

+-

+-

· Solar Panels: 20W – 150W, 18V Output
· Solar Panel Brackets: 20W – 150W

FIGURE 94. DOUBLE SOLAR PANELS

page 57

www.centsys.com

10.7. Earth Spike Installation For further surge protection, an Earth Spike1 can be installed. Route the earth cable from the Earth Spike around to the back of the D6 SMART, and under the Gearbox by the Cable Shield. Connect it to the Mounting Bolt on the right of the Gearbox where the Charger Earth is located by means of a Ring Lug. See Section 7.9.2.1. – “Placing and Routing the Earth Harness”.
Utilise the Cable Management Clip to keep the wiring neat and out of the way.
Gearbox
Cable Management Clip

Earth Spike
Earth Return Cable 1. Not supplied with the D6 SMART.

Cable Shield
FIGURE 95

page 58

www.centsys.com

SECTION 8
10.8. G-ULTRA to D6 SMART Wiring

COMPLETING THE INSTALLATION

G-ULTRA

RELAY 1

RELAY 2

GND IO1 IO2 IO3 IO4 NO COM NC NO COM NC

+ VDC –

+ COM

STATUS FRX PED TRG

Configured using the MyCentsys Pro mobile application
10.9. 12V Siren to D6 SMART Wiring
12V Siren
+12V -12V
The negative can be connected to either I/O5 or I/O6 with adjustable pulse time which can be configured to the MyCentsys Pro App.
page 59

DX Control Card
FIGURE 96
Dx SMART Control Card
FIGURE 97 www.centsys.com

SECTION 8

COMPLETING THE INSTALLATION

10.10. Synchronisation of Two D6 SMART Operators

The following diagram illustrates how to connect two D6 SMART controllers so that the operation of the operators is synchronised.
Using the MyCentsys Pro App, Configure the settings as follows for the respective controllers;

MASTER CONTROLLER SETTINGS
GATE STATUS · External Gate Status …ON · Assigned Status ……… OPEN & OPENING
(All other indicators must be turned off) · Assign I/O to …………. I/O 5

SLAVE CONTROLLER SETTINGS
GATE TRIGGERS · Assign FRX I/O to ……. I/O 6 · Turn Autoclose ……….. ON · Autoclose Timer ……….1 SECOND

DX Control Card (Master Controller)

IRB Receiver

12V/24V +

12V/24V –

COM

NC

NC

COM NO

Wireless IRB Transmitter

Safety Beams must be configured to I/O 3 on both the Master and Slave Controllers. All Triggers need to be learned or connected into the Master Controller only.
page 60

DX Control Card (Slave Controller)
FIGURE 98
www.centsys.com

SECTION 8
10.11. Commissioning the System

COMPLETING THE INSTALLATION

1. Scan the QR Code in Figure 99.
2. Select the App Store applicable to the operating system being used, either Apple App Store, Android Google Play Store or the Huawei App Gallery.
3. Download and install the application.

Download on the
App Store
Minimum Requirements: · BLE-enabled mobile phone · iPhone 6s and above · iOS13
Get it on
Minimum Requirements: · BLE-enabled mobile phone · Android 8.0. (Lollipop)
FIGURE 99

Alternatively, go directly to the app store of the operating system being used, and search for the app “MyCentsys Pro”. Download and install the application onto the smartphone.

1. Once installed, open the application. 2. From the list of operators, select the operator that is applicable to this installation. 3. Connect to the relevant operator. 4. Use the app by following the prompts to configure the D6 SMART.

10.11.1. MyCentsys Remote Application
Introducing an intuitive and user-friendly commanding hub for all SMART and ULTRA devices. MyCentsys Remote puts the ultimate in control and flexibility at your fingertips, delivering an all-in-one, fully-customisable experience for your compatible access automation solutions. Download MyCentsys Remote free by scanning the QR code.
1. Scan the QR Code in Figure 96.
2. Select the App Store applicable to the operating system being used, either Apple App Store, Android Google Play Store or the Huawei App Gallery.
3. Download and install the application.
Alternatively, go directly to the app store of the operating system being used, and search for the app “MyCentsys Remote”. Download and install the application onto the smartphone.
1. Once installed, launch the application. 2. Register with the relevant details. 3. Select the “+ SMART”. 4. From the list of operators, select the operator that is applicable to this installation. 5. Wait for the device added message after tapping on the selected operator. 6. Select the operator on the home screen to view all available triggers and device
status.

page 61

www.centsys.com

Once all the necessary accessories and harnesses have been connected, ensure that the Camlock is in the “unlocked” position, and place the D6 SMART cover onto the gearbox.
Once the cover is secured in place, lock the Camlock to lock the cover in place.

D6 SMART cover

10.12. Applying the Warning Decal

Apply the supplied warning decals to the gate as indicated on the reverse side of the decal.

D6 SMART gearbox
FIGURE 100
FIGURE 101

page 62

www.centsys.com

SECTION 11
1. General Maintenance
11.1. Gate Maintenance

GENERAL MAINTENANCE

Description

Frequency

Ensure that the gate track is clear of debris at all times

Daily

Ensure that the endstops are sturdy and secure

Every 3 months

Check that the rack is securely mounted to the gate over its full length

Every 3 months

Contact an installer to inspect and verify that all safety equipment, e.g. safety beams, is functioning correctly

Every 6 months

Ensure that the gate

moves smoothly when

in Manual Override. Check wheels and

Every 6 months

9g.1ui.de-Dro6lleSrsMfoArRsiTgnMs aintenance
of wear

Check the track for damage or corrosion

Every 6 months

If pedestrian gate / emergency gate is fitted within the main gate, ensure that the lock operates smoothly

Every 6 months

Corrective Action Clean around the gate and gate operator. Consider installing gate brooms on the bottom of the gate If the endstops are damaged or loose,
contact an installer to replace
Contact installer
N/A
Place the motor in Manual Override and manually open and close the gate.
If the wheels and/or guide-rollers are excessively worn, contact an
installer to replace If the track is damaged, contact an
installer to replace
Dry lubricate if necessary (graphite)
TABLE 5

page 63

www.centsys.com

SECTION 11
11.2. D6 SMART Maintenance

GENERAL MAINTENANCE

Before performing any maintenance, ensure that the D6 SMART is isolated, turn off AC Mains and disconnect the batteries!

Description
Check for insect infestations

Frequency Every 3 months

Corrective Action
Clean and remove any nests that are settling in and around the motor and
Control Card
Insert a moth ball, which may help to repel insects, at the bottom of the gearbox

Check that the M10 half-nuts are tight on the foundation plate bolts
Check that there is no sand build-up inside the unit
Check pinion and rack engagement
Check the condition of the pinion
Check the condition of the override cam lock
If used, check the condition of the theftdeterrent cage
If used, check the condition of the theftdeterrent cage lock and that it operates

Every 6 months Every 6 months Every 6 months Every 6 months Every 6 months Every 6 months Every 6 months

Torque setting 20Nm
Remove batteries and lower battery tray and clear out the sand build-up If the mesh is too loose or the rack is riding on the pinion, contact an installer
to correct If the pinion is excessively worn,
contact an installer to replace Dry lubricate if necessary (graphite)
Ensure that the device is serving its purpose
Dry lubricate if necessary (graphite)
TABLE 6

page 64

www.centsys.com

SECTION 12
12. Product Ancillaries

PRODUCT ANCILLARIES

Solar Supply Solution Alternative means of powering the system – consult your CENTSYS dealer

NO WIRES REQUIRED

Photon SMART PE Safety Beams Fully-wireless PE safety beams. Always recommended on any SMART automated installation

Theft-deterrant cage & padlock Patented design provides excellent deterrence against theft, tampering and vandalism

G-ULTRA The ultimate GSM solution for monitoring and activating the operator via your mobile phone

G-SPEAK ULTRA Answer your intercom from anywhere for maximum security and convenience powered by 4G technology

Metal Gate Stations Communication hub for the G-SPEAK ULTRA GSM intercom ­ available in a stylish and strong metal enclosure in one, two and four button variants

Low-voltage Power Supply If 240V power at the gate is not feasible, this optional low-voltage power supply kit is a simple, cost effective option

PowerPack Power unwavering gate performance for busy sites. Run your gate directly from mains. Optional battery backup for added flexibility

Low-voltage Charger Enjoy a safe, reliable and cost-effective way to power your gate operator and enjoy outstanding performance and exceptional flexibility

Steel Reinforced Nylon Rack Keeps sliding gates running smoothly – reinforced for added strength and performance

CENTSYS Transmitters Available in one-, two- and four-button variants. Incorporates code-hopping encryption

SMARTGUARD or SMARTGUARDair Keypad
Cost-effective and versatile
wired and wireless keypad,
allowing access to users with a
customised code

FLUX SA Loop Detector Allows free-exit of vehicles from the property – requires ground loop to be fitted

page 65

www.centsys.com

SECTION 13
13 Installation Handover

INSTALLATION HANDOVER

Once the installation has been successfully completed and tested, it is important for the installer to explain the operation and safety requirements of the system.
NEVER ASSUME THE USER KNOWS HOW TO SAFELY OPERATE AN AUTOMATED GATE!
Even if the user has used one before, it does not mean they know how to SAFELY operate it. Make sure that the user fully understands the following safety requirements before finally handing over the site.
The following needs to be understood by the user:
· How to operate the Manual Release mechanism. (Show them how by demonstration)
· How the obstruction detection and all other safety features work. (Show them how by demonstration)
· All the features and benefits of the Operator, i.e. Beams, etc. · All the safety considerations associated with operating an automated gate. The user
should be able to pass this knowledge on to all other users of the automated system and must be made aware of this responsibility.

· Do not activate the Gate Operator unless you can see it and can determine that its area of travel is clear of people, pets, or other obstructions
· DO NOT CROSS THE PATH OF A MOVING GATE. Always keep people, pets and objects away from a moving gate and its area of travel
· NEVER LET CHILDREN OPERATE OR PLAY WITH THE GATE CONTROLS, and do not allow children or pets near the gate area
· Avoid close proximity with moving parts where fingers, hands or clothing could be pinched and caught
· Secure all easily-accessible gate operator controls in order to prevent unauthorised use of the gate
· Keep the automated gate system properly maintained, and ensure that all working areas are free of debris and other objects that could affect the gate operation and safety
· On a monthly basis, check the obstruction detection system and safety devices to ensure correct operation
· All repair and service work to this product must be done by a suitably qualified person
· This product was designed and built strictly for the use documented herein. Any other uses not included herein, could compromise the operating condition of the product and/or be a source of danger!

Centurion Systems (Pty) Ltd does not accept any liability caused by improper use of the product, or for use other than that for which the automated system was designed. Ensure that the customer is in possession of the User Guide and that you have completed the installation details in the back of the User Guide.

page 66

www.centsys.com

Warranty Information

SECTION 14
14. Warranty Information

WARRANTY INFORMATION

You can register your product(s) online at www.centsys.com, which will assist you in keeping a record of your date of purchase or installation, serial numbers, etc.
All of our products are manufactured with extreme care, thoroughly inspected and tested.
The goods supplied by us shall be subject to the provisions of sections 55 to 57 of the Consumer Protection Act (68/2008) except where the provisions of the warranty contained in our product documentation are more favourable to the purchaser. Subject to the warranty contained in our product documentation, if applicable, our products are warranted for a period of twenty-four months after delivery. However, it is expressly noted that batteries carry a six month warranty due to the nature of these products being such that they are subject to possible misuse. Please note that warranties will be honoured on a carry-in basis; in other words, the product in question must be taken in to one of our branches, or to the authorised reseller that the product was purchased from, for assessment and, if necessary, repair. For equipment not of our manufacture, the warranty as supplied by the original manufacturer will apply if such warranty is more favourable to the purchaser than the relevant provisions of the Consumer Protection Act (Act 68/2008 of South Africa), or any other applicable law as so required in different countries in which the product was sold. Such warranty is valid only once full payment has been received for such goods.
Australian customers:
Our goods come with guarantees that cannot be excluded under the Australian Consumer Law. You are entitled to a replacement or refund for a major failure and compensation for any other reasonably foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure
Any warranty may be voidable on any equipment which:
1. Has not been installed in accordance with the installation instructions provided.
2. Has been subject to misuse or which has been used for any purpose other than that designed for by the manufacturers.
3. Has damage caused as a result of handling during transit, atmospheric conditions (including lightning), corrosion of metal parts, insect infestation, power surges or other forces outside of the control of the manufacturer.
4. Has been repaired by any workshop and / or person NOT previously authorised by the manufacturer.
5. Has been repaired with components not previously tested, passed or authorised by Centurion Systems (Pty) Ltd, South Africa or one of its subsidiary companies.

page 67

www.centsys.com

Notes

page 68

www.centsys.com

Notes

page 69

www.centsys.com

Connect with us on: @FAACAustraliaPtyLtd
@faac_australia_ @FAACAustralia @faacaustralia3920 Subscribe to the newsletter: www.centsys.com/subscribe
Call: 1 300 322 228 (FAAC Australia) or Email: sales@faac.com.au Technical Support Email: technical.au@faactechnologies.com
E&OE Centurion Systems (Pty) Ltd reserves the right to change any product without prior notice All product and brand names in this document that are accompanied by the ® symbol are registered trademarks
in South Africa and/or other countries, in favour of Centurion Systems (Pty) Ltd, South Africa. The CENTURION and CENTSYS logos, all product and brand names in this document that are accompanied by the TM symbol
are trademarks of Centurion Systems (Pty) Ltd, in South Africa and other territories; all rights are reserved. We invite you to contact us for further details.
ISO 9001:2015
Doc number: 1401.D.01.0020_01082024
www.centsys.com.au

Documents / Resources

CENTURION D6-SMART Sliding Gate Operators [pdf] Instruction Manual
D6-SMART Sliding Gate Operators, D6-SMART, Sliding Gate Operators, Gate Operators, Operators

References

Leave a comment

Your email address will not be published. Required fields are marked *