Victoria Arduino Eagle One 2GR Professional Lever Coffee Machine
Specifications:
- Device Type: IoT Coffee Machine Controller
- Group Capacity: 2
- Power Supply: External AC/DC Converter
- Connectivity: GPS Antenna
- Included Cables: Power Cable, CT Cables, Flowmeter Cable
Product Usage Instructions:
1. Device Installation:
Follow these steps to install the device:
- Remove cup warmer, drip tray, and side covers of the coffee
machine. - Release the electronics’ box and power relay by removing
specified screws. - Connect power cable wires to power relay and AC/DC
converter. - Attach flowmeter cable to the circuit board terminals.
- Connect main power and pump current transformers (CTs) as
instructed. - Mount the external AC/DC converter and telemetry device as
indicated. - Install the GPS antenna at the specified location.
2. External Flowmeter Installation:
For external flowmeter installation, refer to the external
flowmeter manual for detailed instructions.
3. Device Activation & Configuration:
Activate the service and configure the device based on coffee
machine calibration using the technical mobile application
manual.
4. Platform Check for Metrics:
Login to the IoT platform to verify that data is being
registered correctly.
FAQ:
Q: What should I do if the device is not registering data on
the IoT platform?
A: Check the connections of the power cable, CT cables, and
flowmeter cable. Ensure proper installation as per the manual. If
issues persist, contact customer support for assistance.
Q: Can I use a different AC/DC converter with the device?
A: It is recommended to use the provided AC/DC converter to
ensure compatibility and proper functioning of the device.
INSTALLATION MANUAL
Victoria Arduino Eagle One
2 GROUP
1
1. Installation Materials
1.1 Device and Peripherals
IoT Device
GPS Antenna
Power Cable 2x CT Cables
Flowmeter Cable
Accessories Bag
External AC/DC Converter
2
1.2 Required Toolbox (Not Provided)
1.3 IoT Device Overview 1.4 Notes & Warnings
PWR: Power Supply Flow: Flow Meter 1
Flow Meter 2 Flow Meter 3 Flow Meter 4 Flow Meter GND Flow Meter GND CT: Water Pump CT: Boiler COMMS: External Flowmeter + External Flowmeter
External Flowmeter Signal SMA Connector: GPS Antenna
3
2. Device Installation
Step 1: Remove the cup warmer (1), the drip tray (2), and the side covers (3) of the coffee machine.
Step 2: At the left side of the machine, remove the screw highlighted in the picture below (left) to release the electronics’ box and then remove the two screws on the top-left of the machine to release the power relay.
4
Step 3: Install the fork terminals to the two wires of the power cable (included in the Gulliver kit). Connect the blue and brown wires of the power cable to the power relay (positions 13 and 6 respectively) as shown below. Use a cable-tie to secure and stress relief the cable.
Step 4: Attach the power cable with input of the AC/DC converter that is included within the Gulliver kit. Afterwards connect the output of the AC/DC converter with the power cable of the IOT device
5
Important Note: In some cases (when for example the Coffee Machine is connected to a Single-phase grid) there is the possibility that the machine’s central switch appears to have the opposite polarity, when the IoT Device is connected to the Coffee Machine. This means that the Coffee Machine appears constantly OFF in the BibeCoffee platform. To solve this issue, try reversing the polarity on the connection of the coffee machine to the power supply. Step 5: Remove the cover of the electronics’ box at the left side of the machine.
Step 6: Locate and remove the 10-position screw terminal at the top of the circuit board.
1…1
6
Step 7: Connect the flowmeters’ cable to the screw terminal as follows: green wire (group 1) to position 4, white wire (ground) to position 5, and purple wire (group 2) to position 6. Short-circuit the three remaining wires (white, grey, and yellow) and use the provided heat-shrink to protect and isolate the connection. Use a cable-tie to secure and stress relief the cable.
GROUP 1 GND
GROUP 2
Step 8: Connect the black (main power) CTs to the three power (live) cables of the central conductor, located at the right side of the machine, as shown below.
7
Step 9: Connect the blue (pump) CT to the power (live) cable of the pump, located at the left side of the machine, as shown below.
Step 10: Mount the external AC/DC converter using double-sided tape and the telemetry device using the magnets at the back side of the device at the right side of the coffee machine as shown below.
8
Step 11: Mount the magnetic GPS antenna at the top-right side of the coffee machine as shown below.
9
3. External Flowmeter Installation
Connect external flowmeter following instructions from the external flowmeter manual.
4. Device Activation & Configuration
Activate the service and then configure the device according to coffee machine calibration following instructions from the technical mobile application manual
5. Platform check for metrics
Now, you can login to the IoT platform and ensure that data is registered in the platform.
FCC Warning
This device complies with part 15 of the FCC rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any inte rference received, including interference that may cause undesired operation.
Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment.
NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interferenceto radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: · Reorient or relocate the receiving antenna. · Increase the separation between the equipment and receiver. · Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. · Consult the dealer or an experienced radio/TV technician for help.
10
Radiation Exposure Statement
This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with minimum distance 20cm between the radiator and your body.
We make it count!
11
Documents / Resources
![]() |
BibeCoffee Victoria Arduino Eagle One 2GR Professional Lever Coffee Machine [pdf] Installation Guide Gullive 2BLXR-GULLIVER, 2BLXRGULLIVER, gulliver, Victoria Arduino Eagle One 2GR Professional Lever Coffee Machine, Victoria Arduino Eagle One, 2GR Professional Lever Coffee Machine, Professional Lever Coffee Machine, Lever Coffee Machine, Coffee Machine, Machine |