PEAKMETER PM5205

PEAKMETER PM5205 Digital Insulation Tester User Manual

Model: PM5205

1. Introduction

This manual provides essential information for the safe and effective operation of the PEAKMETER PM5205 Digital Insulation Tester. The PM5205 is a versatile instrument designed for measuring insulation resistance, DC voltage, AC voltage, and continuity. It complies with international safety standards IEC61010-1 for electronic test equipment, specifically for 1000V CAT III and pollution degree 2 regulations.

Please read this manual thoroughly before using the device to ensure proper functionality and user safety.

2. Safety Information

Always adhere to the following safety precautions to prevent personal injury or damage to the instrument:

  • Do not use the meter if it appears damaged or if the insulation on the test leads is compromised.
  • Ensure the battery compartment is securely closed before operation.
  • Do not apply voltage to the input terminals that exceeds the maximum rated voltage for the selected range.
  • Always disconnect the test leads from the circuit under test before changing functions or ranges.
  • Exercise extreme caution when working with live circuits. High voltages can be lethal.
  • Keep hands and fingers behind the probe barriers during testing.
  • Do not operate the meter in explosive gas, vapor, or dusty environments.
  • The meter automatically discharges capacitive loads after insulation tests, but always verify discharge before touching the circuit.

3. Product Overview

The PEAKMETER PM5205 is a robust digital insulation tester and multimeter. It features a large digital and analog display for clear readings and a rotary switch for function selection.

Front view of the PEAKMETER PM5205 Digital Insulation Tester

Figure 3.1: Front view of the PEAKMETER PM5205 Digital Insulation Tester, showing the display, function buttons, and rotary selector.

3.1 Key Features

  • Auto Calculate Polarization Index (PI) and Dielectric Absorption Ratio (DAR)
  • Store / Load Function for data management
  • Compare function for quick pass/fail assessment
  • Automatic discharge for capacitive loads after insulation tests
  • Timer Function for insulation test duration control
  • Lock function for continuous insulation testing
  • DCV and ACV Test capabilities
  • Continuity test with audible indicator
  • Auto power off to conserve battery life
  • Digital and analog bar graph display

3.2 Input Terminals

Close-up of the input terminals on the PEAKMETER PM5205

Figure 3.2: Close-up view of the input terminals: LOW, TEST INSULATION, HIVΩ, and COM.

  • LOW: Input terminal for low potential connection during insulation tests.
  • TEST INSULATION / HIVΩ: High voltage output terminal for insulation resistance measurements.
  • COM: Common terminal for all measurements.
  • V: Input terminal for voltage measurements (DCV/ACV).

4. Setup

4.1 Unpacking

Carefully unpack the PEAKMETER PM5205 and verify that all items listed in the 'Package Contents' section are present and undamaged. If any items are missing or damaged, contact your supplier immediately.

PEAKMETER PM5205 with all included accessories and manual

Figure 4.1: The PEAKMETER PM5205 Digital Insulation Tester, carrying bag, test leads, alligator clips, and user manual.

4.2 Battery Installation

The PM5205 requires 6 x 1.5V AAA batteries (not included). To install or replace batteries:

  1. Ensure the meter is powered off.
  2. Locate the battery compartment cover on the back of the unit.
  3. Use a screwdriver to open the battery compartment.
  4. Insert 6 AAA batteries, observing correct polarity (+/-).
  5. Replace the battery compartment cover and secure it with the screw.
Open battery compartment of the PEAKMETER PM5205

Figure 4.2: The open battery compartment, showing slots for 1.5V AAA batteries.

4.3 Connecting Test Leads

Connect the test leads to the appropriate input terminals on the meter for the desired measurement function. Ensure connections are firm and secure.

Test leads connected to the PEAKMETER PM5205

Figure 4.3: Test leads with alligator clips connected to the meter's input terminals.

5. Operating Instructions

5.1 Power On/Off

Rotate the function selector dial from the 'OFF' position to any desired measurement function to power on the meter. To power off, rotate the dial back to 'OFF'. The meter also features an auto power-off function to conserve battery life after a period of inactivity.

5.2 Insulation Resistance Test

The PM5205 offers various test voltages for insulation resistance measurements.

  1. Connect the red test lead to the 'HIVΩ' terminal and the black test lead to the 'LOW' terminal.
  2. Rotate the function selector to the desired insulation test voltage (e.g., 250V, 500V, 1000V, 2500V).
  3. Connect the test leads to the circuit under test. Ensure the circuit is de-energized and isolated before connecting.
  4. Press the 'MEASURE' button to start the test. The display will show the insulation resistance value.
  5. For continuous testing, press the 'LOCK' button before 'MEASURE'. Press 'LOCK' again to release.
  6. The meter will automatically discharge the capacitive load after the test.

Note: If the resistance is beyond the meter's range, the display will show 'OL' (Overload).

PEAKMETER PM5205 display showing 'OL' for Overload

Figure 5.1: The meter's display indicating 'OL', signifying an overload or out-of-range measurement.

5.2.1 PI and DAR Calculation

The meter can automatically calculate Polarization Index (PI) and Dielectric Absorption Ratio (DAR). Refer to the on-screen prompts or specific button functions for initiating these tests, typically involving timed insulation measurements.

5.2.2 Timer Function

Use the 'TIMER' button to set a specific duration for insulation tests, which is useful for PI and DAR calculations or for observing resistance over time.

5.3 DC Voltage Test

  1. Connect the red test lead to the 'V' terminal and the black test lead to the 'COM' terminal.
  2. Rotate the function selector to 'DCV'.
  3. Connect the test leads across the DC voltage source to be measured.
  4. Read the voltage value on the display.

5.4 AC Voltage Test

  1. Connect the red test lead to the 'V' terminal and the black test lead to the 'COM' terminal.
  2. Rotate the function selector to 'ACV'.
  3. Connect the test leads across the AC voltage source to be measured.
  4. Read the voltage value on the display.

5.5 Continuity Test

  1. Connect the red test lead to the 'V' terminal and the black test lead to the 'COM' terminal.
  2. Rotate the function selector to the continuity symbol (usually a speaker icon).
  3. Touch the test probes across the circuit or component to be tested.
  4. An audible beep indicates continuity (low resistance). The display will show the resistance value.

5.6 Store / Load Function

The PM5205 allows you to store measurement data and recall it later. Use the 'MEMO' and 'READ/A' buttons in conjunction with 'ENTER' or 'SELECT' to manage stored data. Refer to the specific button labels on your device for exact operation.

5.7 Compare Function

The 'COMP' button enables a comparison function, allowing you to set a reference value and quickly determine if subsequent measurements are above or below this threshold, often indicated by visual or audible alerts.

6. Maintenance

6.1 Cleaning

To clean the meter, wipe the case with a damp cloth and a mild detergent. Do not use abrasives or solvents. Ensure the meter is powered off and disconnected from all circuits before cleaning.

6.2 Battery Replacement

Replace batteries when the low battery indicator appears on the display. Refer to Section 4.2 for battery installation instructions.

6.3 Storage

If the meter is not used for an extended period, remove the batteries to prevent leakage and store the device in a cool, dry place, away from direct sunlight and extreme temperatures.

PEAKMETER PM5205 with its carrying case and test leads

Figure 6.1: The PEAKMETER PM5205 stored in its protective carrying case with test leads.

7. Troubleshooting

If you encounter issues with your PM5205, refer to the following common problems and solutions:

  • Meter does not power on: Check battery installation and ensure batteries are not depleted. Replace if necessary.
  • 'OL' displayed during measurement: The measured value is outside the selected range or the maximum capability of the meter. Select a higher range or verify the circuit conditions.
  • Inaccurate readings: Ensure test leads are properly connected and not damaged. Verify the correct function and range are selected. Check for external interference.
  • No continuity beep: Check if the circuit has high resistance or is open. Ensure the continuity function is selected.

For issues not covered here, please contact customer support.

8. Specifications

ParameterSpecification
Insulation Test Voltages250V (0%~+20%), 500V (0%~+20%), 1000V (0%~+20%), 2500V (0%~+20%)
Insulation Resistance Range (250V)0.01MΩ ~ 250MΩ ±(3%+5)
Insulation Resistance Range (500V)0.01MΩ ~ 500MΩ ±(3%+5)
Insulation Resistance Range (1000V)0.01MΩ ~ 1000MΩ ±(3%+5), 1GΩ ~ 5GΩ ±(5%+0.1GΩ), 5GΩ ~ 10GΩ ±(10%+0.2GΩ)
Insulation Resistance Range (2500V)0.1MΩ ~ 2GΩ ±(3%+5), 2GΩ ~ 20GΩ ±(5%+0.2GΩ), 20GΩ ~ 100GΩ ±(10%+2GΩ)
Short Circuit Current2mA
DC Voltage Test Range0.1V ~ 1000V ±0.5%
AC Voltage Test Range0.1V ~ 750V ±1%
Continuity Test Range0.01Ω ~ 200Ω ±0.5%
Battery Type6 x 1.5V AAA batteries (not included)
Dimensions180mm x 140mm x 65mm (7.1in x 5.5in x 2.6in)
Net Weight950g (2.1lb)
Safety StandardIEC61010-1, 1000V CAT III, Pollution Degree 2

9. Package Contents

The standard package for the PEAKMETER PM5205 includes:

  • 1 x PM5205 Digital Insulation Tester
  • 1 Pair x Alligator Clip (Red/Black)
  • 1 x Test Leads Set
  • 1 x Portable Carrying Bag
  • 1 x English User Manual

10. Warranty and Support

For warranty information, technical support, or service inquiries, please refer to the warranty card included with your product or contact PEAKMETER customer service directly. Keep your purchase receipt as proof of purchase.

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.