1. Introduction
This manual provides essential information for the proper handling, installation, and maintenance of the York 1157-902 OEM Heat Pump Defrost Control Circuit Board. This component is designed to manage the defrost cycle in compatible York heat pump systems, ensuring efficient operation and preventing ice buildup on the outdoor coil.
2. Safety Information
WARNING: Electrical Shock Hazard. Read and understand all safety instructions before proceeding.
- Installation and servicing of HVAC equipment should only be performed by qualified, experienced technicians.
- Always disconnect all power to the heat pump system at the main service panel before installing, servicing, or removing this control board. Failure to do so can result in severe personal injury or death.
- Verify that the replacement board is the correct model number for your specific heat pump system.
- Handle the circuit board by its edges to avoid damaging electronic components due to electrostatic discharge (ESD). Use appropriate ESD precautions.
- Ensure all wiring connections are secure and correctly matched according to the heat pump's wiring diagram.
3. Product Overview
The York 1157-902 is an Original Equipment Manufacturer (OEM) replacement defrost control circuit board. It is a critical component in heat pump systems, responsible for initiating and terminating the defrost cycle to maintain optimal heating performance in cold weather conditions.

Figure 1: York 1157-902 OEM Heat Pump Defrost Control Circuit Board. This image shows the board with its various terminals and electronic components.
4. Setup and Installation
Note: Installation should only be performed by a certified HVAC technician.
- Power Disconnection: Turn off all electrical power to the heat pump unit at the main circuit breaker or disconnect switch. Verify power is off using a voltage meter.
- Access Panel Removal: Locate and remove the access panel to the control compartment of the outdoor heat pump unit.
- Wiring Documentation: Before disconnecting any wires, take clear photographs or make a detailed diagram of all existing wiring connections to the old defrost control board. Label each wire if necessary.
- Old Board Removal: Carefully disconnect all wires from the old board. Remove any mounting screws or clips securing the old board in place and remove it from the unit.
- New Board Installation: Position the new York 1157-902 defrost control board in the same location as the old one. Secure it with the original mounting hardware.
- Wiring Connection: Reconnect all wires to the new board according to your documentation (photos/diagrams). Ensure each connection is firm and correct.
- Panel Reinstallation: Replace the control compartment access panel.
- Power Restoration: Restore electrical power to the heat pump unit.
- System Test: Monitor the heat pump's operation to ensure it functions correctly, including observing if the defrost cycle initiates and terminates as expected under appropriate conditions.
5. Operation
The York 1157-902 defrost control circuit board operates automatically. Once installed and powered, it continuously monitors the outdoor coil temperature and ambient conditions. When conditions indicate ice formation on the coil, the board initiates a defrost cycle. During this cycle, the heat pump temporarily reverses its operation to melt the ice. Once the coil is clear, the board terminates the defrost cycle, and the heat pump returns to normal heating operation. There are no user-adjustable settings on this board.
6. Maintenance
The defrost control board itself requires no routine maintenance. However, it is recommended that the entire heat pump system undergo annual professional maintenance. During this service, the technician should:
- Inspect the control board and its wiring for any signs of damage, corrosion, or loose connections.
- Ensure the outdoor coil is clean and free of debris, which can impede proper defrosting.
- Verify the proper functioning of the defrost sensor (if external) and other related components.
7. Troubleshooting
If your heat pump system is experiencing issues related to defrosting, the defrost control board may be a factor. Due to the complexity of HVAC systems, troubleshooting should be performed by a qualified technician.
Common Symptoms of Defrost Control Board Issues:
- Outdoor coil covered in ice: The defrost cycle may not be initiating or completing.
- Heat pump constantly in defrost mode: The board may be failing to terminate the defrost cycle.
- No heat or insufficient heat in cold weather: A malfunctioning defrost board can lead to inefficient operation.
- System short cycling: The unit turns on and off too frequently, potentially due to defrost issues.
If any of these symptoms occur, contact a professional HVAC technician for diagnosis and repair. Attempting repairs without proper knowledge and tools can be dangerous and may void warranties.
8. Specifications
| Model Number | 1157-902 |
| Manufacturer | York |
| Product Dimensions | 5 x 4 x 1 inches |
| Item Weight | 5 ounces |
| ASIN | B01AGURJXO |
| Date First Available | January 11, 2016 |
9. Warranty and Support
Warranty information for the York 1157-902 OEM Heat Pump Defrost Control Circuit Board is typically provided by the seller or the original equipment manufacturer (York). Please refer to your purchase documentation or contact your supplier for specific warranty terms and conditions.
For technical support or assistance with installation and troubleshooting, it is recommended to contact a certified HVAC professional. They have the expertise and tools to correctly diagnose and resolve issues related to your heat pump system and its components.