Rokuhan R068

Rokuhan Z Gauge R068 Double Slip Point Rail Instruction Manual

Model: R068

Introduction

The Rokuhan Z Gauge R068 Double Slip Point Rail is a precision-engineered track component designed for Z gauge model railway layouts. Inspired by concrete sleepers, this point rail allows for complex track configurations, enabling trains to cross from one track to another in two directions. It features both selectable and non-selectable functions to suit various layout designs and operational preferences. This manual provides essential information for the proper setup, operation, and maintenance of your R068 Double Slip Point Rail.

Rokuhan Z Gauge R068 Double Slip Point Rail with included auxiliary rails.

An overhead view of the Rokuhan Z Gauge R068 Double Slip Point Rail, showing its intricate trackwork and the two included pre-cut auxiliary rails. The rail features a left branch configuration.

Setup

Careful setup ensures optimal performance and longevity of your double slip point rail.

  1. Unpack Components: Carefully remove the double slip point rail and the two 2.1-inch (53.6 mm) pre-cut auxiliary rails from their packaging. Identify all parts, including the six non-selectable (replacement) screws.
  2. Track Connection: Connect the R068 Double Slip Point Rail to your existing Z gauge track layout. Ensure all track connectors are firmly seated for reliable electrical contact and smooth train passage. The pre-cut auxiliary rails can be connected directly to the double slip point rail without further modification.
  3. Orientation: Position the point rail according to your layout design, noting its left branch configuration and 13° angle.
  4. Selectable vs. Non-Selectable Function:
    • Selectable: For dynamic control of train routes, the point rail can be connected to a compatible point motor (sold separately) and control switch. Refer to the point motor's instructions for wiring and installation.
    • Non-Selectable: If you wish to fix the points in a specific position, use the included non-selectable (replacement) screws to secure the point blades. This is useful for static layouts or sections where point switching is not required. Ensure the points are aligned correctly before tightening the screws.
  5. Power Connection: Ensure your track layout, including the point rail, receives adequate power from your Z gauge power pack. Test all track sections for electrical continuity.

Operating

The R068 Double Slip Point Rail allows for versatile train movements within your Z gauge layout.

  • Function: This double slip point rail enables trains to move between two parallel tracks and also to cross from one track to the other in either direction. The 'left branch' designation indicates the primary diverging path.
  • Switching Points (Selectable Mode): If your point rail is configured for selectable operation with a point motor, use the corresponding control switch to change the direction of the point blades. Always ensure the points are fully thrown to the desired position before a train passes over them to prevent derailments.
  • Train Speed: For optimal performance and to prevent derailments, trains should pass over point rails at a reduced speed.
  • Visual Inspection: Before operating trains, always visually inspect the point blades to confirm they are correctly aligned for the intended route.

Maintenance

Regular maintenance will help ensure smooth operation and extend the life of your point rail.

  • Track Cleaning: Keep the rail surfaces clean from dust, dirt, and oxidation. Use a specialized track cleaning tool or a soft cloth with a small amount of track cleaning fluid. Clean the point blades and frog area thoroughly.
  • Inspection: Periodically inspect the point rail for any signs of wear, damage, or loose connections. Check that the point blades move freely (if in selectable mode) and return to their correct positions.
  • Electrical Contacts: Ensure all electrical contacts between track sections and to any point motors are clean and secure. Poor contact can lead to intermittent power or unreliable point switching.
  • Storage: When not in use for extended periods, store the point rail in a clean, dry environment away from direct sunlight and extreme temperatures.

Troubleshooting

Here are solutions to common issues you might encounter:

  • Derailments on Point Rail:
    • Ensure points are fully thrown and aligned correctly.
    • Check for any debris or obstructions in the point mechanism.
    • Reduce train speed when traversing the point rail.
    • Inspect rolling stock for damaged wheels or couplers.
  • Intermittent Power or Stalling:
    • Clean track surfaces, especially around the point blades and frog.
    • Check all track connections for tightness and good electrical contact.
    • Ensure power feeders are securely connected to the track.
  • Point Blades Not Switching (Selectable Mode):
    • Verify the point motor is correctly installed and wired.
    • Check the control switch for proper function.
    • Ensure there are no physical obstructions preventing the blades from moving.
    • Confirm the point motor is receiving power.

Specifications

Brand Rokuhan
Model Number R068
Scale Z Gauge (1/220)
Item Dimensions (L x W x H) 8.27 x 6.3 x 0.39 inches (approximate)
Material Type Plastic
Point Configuration Double Slip, Left Branch, 13° Angle
Set Contents Double slip point rail (left branch) 13°, 2.1 inches (53.6 mm) pre-cut auxiliary rails x 2, non-selectable (replacement) screws x 6
Recommended Age 15 years and up

Warranty and Support

For specific warranty information or technical support regarding your Rokuhan Z Gauge R068 Double Slip Point Rail, please refer to the documentation provided at the time of purchase or contact Rokuhan directly through their official website. Keep your proof of purchase for any warranty claims.

© 2024 Rokuhan. All rights reserved.

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.