1. Introduction and Product Overview
This manual provides detailed instructions for the installation, electrical connection, commissioning, maintenance, and troubleshooting of the EPEVER TES series solar charge controllers. The TES series utilizes a new generation of MPPT control algorithms to enhance tracking speed and maximum power point response, ensuring optimal energy capture from solar panels under various conditions.
The controller supports no-battery mode operation, is compatible with major lithium battery types, and features advanced low-power design for extended system standby. It includes charging current/power limits and automatic power reduction at high temperatures to maintain system stability. With an IP32 protection level, short-circuit protection, and an isolated RS485 communication interface, it offers robust and reliable performance. The self-adaptive three-stage charging mode extends battery life and improves overall system efficiency. It also supports parallel charging for system capacity expansion.
Key Features:
- Advanced MPPT technology with tracking efficiency ≥ 99.5%.
- Conversion efficiency up to 98.5%.
- Low power consumption (static loss < 50mA).
- No-battery mode operation.
- Support for multiple battery types, including lithium batteries.
- Stable self-activation for lithium batteries.
- RS485 communication interface for remote monitoring (via optional WiFi, Bluetooth, TCP, 4G modules).
- Dual limits for rated charging power and current.
- Automatic power reduction at high temperatures.
- Comprehensive electronic protections.
- Rated IP32 protection level.
- Built-in BMS communication port and CAN parallel communication port.
- Real-time data logging, event logging, and energy statistics.
2. Important Safety Instructions
Please read and keep this manual for future reference. Improper use may cause serious injury or damage.
- Read all instructions and warnings carefully before installation.
- No user-serviceable components inside; do not attempt to disassemble or repair the controller.
- Install the controller indoors to avoid exposure to elements and water ingress.
- Install in a well-ventilated place; the heat sink can become very hot during operation.
- Avoid humid, salt spray, corrosive, greasy, flammable, explosive, or dusty environments.
- Install proper fast-acting fuses/breakers externally.
- Disconnect PV array and battery connections before installation or adjustment.
- Ensure all wiring is tight to prevent heat accumulation from loose connections.
- The entire system should be installed and operated by professional personnel.
3. Product Exterior and Components
The EPEVER TES series solar charge controller features a robust design with clearly labeled ports and indicators for easy setup and monitoring.

Figure 1: Controller Components (Front and Bottom View)
Component Descriptions:
- Indicator: Status LED.
- LCD: Liquid Crystal Display for real-time data and settings.
- Buttons: For navigation and parameter adjustment.
- CAN/RTS/BMS COM interface: Multi-function port for BMS communication or remote temperature sensor.
- COM port (RJ45): With isolation design, 5VDC/200mA, for RS485 communication modules (WiFi, Bluetooth, TCP, 4G).
- Battery terminals: Connect to battery bank.
- PV1 terminals: Connect to first PV array input.
- PV2 terminals: Connect to second PV array input (available on some models).
- Grounding terminal: For system grounding.
Indicators and LCD Display:
The controller features an LCD screen and LED indicators to provide real-time status and data. The LCD can be viewed clearly within a 90-degree angle. Indicators show PV status (charging, overvoltage, error) and Battery status (normal, fully charged, overvoltage, undervoltage, over-discharging, over-temperature, BMS faults).
4. Technical Specifications
Below are the key technical specifications for the TES6415 and TES6425 models. For a complete list of specifications for all TES series models, please refer to the official user manual PDF.
| Parameter | TES6415 | TES6425 |
|---|---|---|
| PV Input (DC) Max. Open-circuit Voltage | 150V (lowest temp), 135V (25°C) | 250V (lowest temp), 225V (25°C) |
| MPPT Voltage Range | (Battery voltage + 2V, > 20V) to 108V (25°C) for TES6415, to 180V (25°C) for TES6425 | |
| Number of MPPTs | 1 | |
| Battery Type | AGM (Default)/GEL/FLD/User, LFP/NCM/User | |
| Rated Voltage | 12V/24V/48VDC or Auto | |
| Rated Charging Current | 60A | |
| Rated Charging Power | 780W/1560W/3120W (12V/24V/48V) | 780W/1560W/3120W (12V/24V/48V) |
| Max. Conversion Efficiency | 98.3% | 98.5% |
| Operating Temperature | -25°C to +60°C (>40°C derating) | |
| Ingress Protection | IP32 | |
| Dimensions (L×W×H) | 270mm × 305mm × 91mm | 270mm × 305mm × 105mm |
| Weight | 3.85kg | 4.85kg |
| Certifications | CE, EN/IEC61000-6-2, EN/IEC61000-6-4, EN/IEC62109-1, IEC62321 | |
For detailed parameter lists, including battery voltage control parameters for various battery types (AGM, GEL, FLD, LFP, NCM), please refer to the official EPEVER TES Series User Manual PDF: Download User Manual PDF.
5. Installation and Connection (Setup)
5.1 Precautions:
- Wear protective goggles when installing flooded lead-acid batteries.
- Guard battery and PV connections against inadvertent contact.
- Keep batteries away from metal objects to prevent short circuits.
- Ensure good ventilation as acidic gases may be generated during charging.
- Avoid direct sunlight and rain for outdoor installations.
- Do not install in harsh environments (humid, corrosive, flammable, etc.).
- Ensure tight power connections and secure cables to prevent overheating and fire.
- Only charge lead-acid and lithium-ion batteries within the controller's control range.
- Select system connection cables with a current density no greater than 5A/mm².
- Stripped wire length should be appropriate; no exposed metal should protrude from terminal blocks.
- Grounding wire cross-sectional area should not be less than 4mm² (refer to IEC62109).
- Tighten wiring screws to at least 1.2 N·m.
5.2 Installation Requirements:
- Ensure sufficient airflow through the controller's heat sink.
- Leave at least 150mm clearance above and below the controller for natural convection.
- If mounted in a closed cabinet, ensure heat can be dissipated.
5.3 Wire Size:
Wire sizes depend on current and cable length. Refer to the tables below for recommended wire sizes. If there is a long distance between components, use thicker cables to reduce voltage drop.
| Model | Maximum PV Input Current | Maximum PV Wire Size |
|---|---|---|
| TES6415, TES6425 | 60A | 16mm²/6AWG |
| Model | Rated Charging Current | Maximum Battery Wire Size |
|---|---|---|
| TES6415, TES6425 | 60A | 16mm²/6AWG |
5.4 Device Connection:
Connect the controller in the following sequence:
- Ground cable (PE)
- Battery
- PV array
- Optional accessories
Disconnect in reverse order.
5.4.1 Connecting the Battery:

Figure 2: Wiring Diagram for Battery Mode
- Do not connect the circuit breaker or fast-acting fuse when wiring. Ensure '+' and '-' poles are connected correctly.
- Install a fast-acting fuse (1.25 to 2 times rated current) on the battery side, no more than 150mm from the battery.
- If connecting an inverter, connect it directly to the battery pack.
5.4.2 Connecting the PV Modules:
5.4.3 Connecting Accessories:
- BMS-Link Module: Connect to port 4 for lithium batteries with BMS function.
- Remote Temperature Sensor (RTS-D47K): Attach near the battery to detect temperature. Set BMS protocol number to 32.
- Communication Module (WiFi, Bluetooth, TCP, 4G): Connect to the RS485 COM port for remote monitoring via APP.
6. Operation
6.1 Checking Before Powering On:
- Verify the controller is installed correctly and securely.
- Confirm all terminal wirings are connected correctly and tightly.
6.2 Operating the Device:
- Connect the battery's fast-acting fuse to power on the controller.
- Ensure the LCD displays normally and the charge control terminal is properly inserted.
- Connect the PV array's circuit breaker. The charging indicator will flash slowly during PV charging.
6.3 Parameter Setting:
The controller allows viewing real-time data and adjusting various parameters via the LCD and buttons. For detailed steps on navigating menus and modifying settings, refer to the official PDF manual.
- PV Real-time Data: View PV1/PV2 input voltage, current, power, and energy.
- Battery Real-time Data: View battery voltage, charging current, charging/discharging power, SOC, and temperature.
- Setting Steps: Use the buttons to browse interfaces, select parameters, enter setting mode (blinking value), modify values, and confirm.
- Parameters List: A comprehensive list of parameters (Battery Type, Capacity, Rated Voltage Level, Overvoltage Disconnect, Charging Voltage Limits, etc.) can be found in the full user manual PDF.
7. Maintenance
To ensure long-term optimal performance, it is recommended to inspect the following items twice a year:
- Ensure proper ventilation and heat dissipation around the controller; clean dirt or debris from the heat sink.
- Check insulation of exposed cables for damage (sunlight, friction, pests); repair or replace if necessary.
- Verify indicator and display consistency with actual operation; note and address any fault displays.
- Inspect terminal blocks for corrosion, insulation damage, or high-temperature burn marks; ensure terminal screws are tight.
- If the lightning arrester has failed, replace it promptly to prevent damage to the controller or other equipment.
8. Troubleshooting
This section outlines common issues, their possible causes, and recommended solutions. Refer to the controller's indicators and LCD for error codes and status.
| Status/Indicator | Error Code | Possible Reason | Troubleshooting |
|---|---|---|---|
| PV indicator fast flashing green | POV | PV Overvoltage | Check if PV open circuit voltage is too high; alarm clears when voltage drops. |
| RPP | PV Reverse Polarity | Check PV connection polarity. | |
| BATT indicator solid orange | BUV | Battery Undervoltage Alarm | Disconnect loads, check battery voltage; recharge battery. |
| BATT indicator solid red | BOD | Battery Over Discharging | Disconnect loads, check battery voltage; recharge battery. |
| BATT indicator fast flashing green | BOV | Battery Overvoltage Protection | Disconnect charging, measure battery voltage; check settings. |
| BATT indicator slowly flashing red | BOT | Battery Over Temperature | Ensure battery is in a cool, well-ventilated place. |
| PV indicator fast flashing green & BATT indicator fast flashing orange | DOT | Device Over Temperature | Ensure controller is in a cool, well-ventilated place. |
For a complete list of error codes and detailed troubleshooting steps, please refer to the official EPEVER TES Series User Manual PDF.
9. User Tips
Based on general usage and common practices for solar charge controllers:
- Verify Battery Type: Always ensure the correct battery type (AGM, GEL, FLD, LFP, NCM) is selected in the controller settings to prevent overcharging or undercharging and to maximize battery lifespan.
- Cable Management: Use appropriate cable gauges and keep cable runs as short as possible to minimize voltage drop and maximize efficiency. Secure all connections firmly.
- Monitor Performance: Regularly check the LCD display for real-time data on PV input, battery status, and charging parameters to ensure the system is operating optimally.
- Ventilation is Key: Ensure the controller has ample space for airflow, especially around the heat sink, to prevent overheating and maintain performance, particularly in warmer climates.
- Grounding: Proper grounding is essential for safety and to protect the controller from electrical surges. Ensure the grounding terminal is correctly connected.
10. Technical Support
For technical inquiries regarding EPEVER products, please contact through the following channels:
- Service Hotline: 010-82894896 / 82894112, 0752-3889706, 0755-89236770
- Email: sales@epever.com
- Website: For more product information, please visit www.epever.com.
Any changes to the product or manual are subject to change without prior notice. Please refer to the official website for the latest information.