1. Overview
The DuoRacer MPPT charge controller is designed for simultaneously charging two batteries (main battery BATT1 and starter battery BATT2) in a solar system. It supports various main battery types including Sealed, Gel, Flooded, LiFePO4, and Li-NiCoMn, making it ideal for RVs, campers, and boats. The controller automatically identifies the starter battery (BATT2) system voltage.
Utilizing an advanced MPPT control algorithm, this controller minimizes power loss and quickly tracks the maximum power point (MPP) of the PV array, maximizing solar energy harvest. It improves energy utilization by 20-30% compared to PWM charging methods.
Features include:
- Maximum Power Point Tracking (MPPT) technology with ultra-fast tracking speed (≥99.5% efficiency).
- Advanced MPPT control algorithm for minimal MPP loss.
- Wide MPP operation voltage range for improved PV module utilization.
- Auto-control for charging power and current limitation (BATT1).
- High-quality components (ST, TI, Infineon) for extended product life.
- Digital circuit control of adaptive three-stage charging mode for BATT1.
- Low-power mode for reduced self-consumption.
- 100% charging/discharging within environmental temperature range.
- AES control signal for car refrigerators to prevent energy waste.
- Standard Modbus protocol and RS485 communication port for expansion.
Note: BATT1 is for household loads and does not auto-identify system voltage. BATT2 is for vehicle systems (RVs, boats), supports only lead-acid batteries, and auto-identifies system voltage. Both BATT1 and BATT2 must be at the same voltage level.

Figure 1.1: EPEVER MPPT Dual Battery Solar Charge Controller in an RV setup, highlighting 10A, DR1206N-DDS, 12V/24V Auto, Max PV 60V capabilities.
2. Important Safety Instructions
Please reserve this manual for future review.
- Read all instructions and warnings carefully before installation.
- No user-serviceable components inside. Do NOT disassemble or attempt repair.
- Avoid direct sunlight, high temperatures, and locations where water can enter.
- Install in well-ventilated areas; the heat sink can become very hot.
- Do not install in humid, salt spray, corrosive, greasy, flammable, explosive, or dusty environments.
- Use appropriate external fast-acting fuses or breakers.
- Disconnect all PV array connections and battery fuses/breakers before installation or adjustment.
- Ensure power connections remain tight to prevent overheating.
3. Product Appearance and Components
Familiarize yourself with the controller's physical features and connection points.

Figure 3.1: Front and side view of the controller with labeled components.
- Mounting hole (size Ø5mm)
- LCD (Refer to chapter 3 for display details)
- Grounding Terminal
- Remote temperature sensor port
- PV terminals
- BATT1 terminals (Main battery)
- BATT2 terminals (Starter battery)
- RS485 Communication port
- AES (signal) output port
- Terminal protection cover
Note: The controller charges BATT1 at a default of 25°C if the remote temperature sensor is not connected or is damaged.
4. Setup (Installation)
4.1 Attentions
- Do not install in humid, salt spray, corrosive, greasy, flammable, explosive, or dusty environments.
- Exercise caution when installing batteries, especially flooded lead-acid types. Wear eye protection and have fresh water available.
- Keep batteries away from metal objects to prevent short circuits.
- Ensure good ventilation as explosive battery gases may be released during charging.
- For outdoor installations, protect from direct sunlight and rain.
- Ensure tight connections and use cable clamps to secure wires to prevent overheating and fire hazards.
- The controller is compatible with lead-acid and lithium batteries.
- Battery connections can be to a single battery or a bank of batteries.
- Select system connection cables with a current density no greater than 5A/mm².
4.2 PV Array Requirements
The number of PV modules in series depends on the open-circuit voltage (Voc) and maximum power point voltage (Vmpp) of the MPPT controller. Refer to the detailed specifications in the PDF manual for specific configurations based on system voltage and cell count.
4.3 Wire Size
Wiring and installation must comply with national and local electrical codes. The PV wire size and battery/load wire size must conform to the rated current. Refer to the PDF manual for detailed wire size recommendations based on controller model and current ratings.
4.4 Mounting
WARNING: Risk of explosion. Never install in a sealed enclosure with flooded batteries or in confined areas where battery gas can accumulate. Risk of electric shock. Disconnect breakers before wiring.
CAUTION: The controller requires at least 150mm of clearance above and below for proper airflow. Ventilation is highly recommended if mounted in an enclosure.
Step 1: Determine Installation Location and Heat-Dissipation Space
- Install with sufficient airflow through the radiators.
- Minimum 150mm clearance from upper and lower edges for natural thermal convection.
- If installed in an enclosed box, ensure reliable heat dissipation.
Step 2: Wiring

Figure 4.1: Wiring diagram showing connections for PV, Main Battery (BATT1), Start Battery (BATT2), AES-ADP, Refrigerator, and MT11.
Connect the system in the following order:
- Starter battery (BATT2)
- Main battery (BATT1)
- PV array
Disconnect in the reverse order (PV array, Main battery, Starter battery).
CAUTION: BATT1 and BATT2 must be at the same voltage level. Follow wiring instructions carefully to prevent BATT2 system voltage identification errors. Do NOT connect breakers/fuses while wiring. Ensure correct electrode polarity. Install a fast-acting fuse (1.25 to 2 times rated current) on the battery side, within 150mm of the battery. If an inverter is used, connect it directly to the battery.
Step 3: Grounding
- The DR N series is a common-negative controller.
- The grounding terminal on the controller's shell MUST be grounded to shield electromagnetic interference and prevent electric shock.
Step 4: Connect the Remote Temperature Sensor Cable
- Connect the remote temperature sensor cable to the designated port (4) and place the other end close to BATT1.
- If not connected, the default temperature for battery charging/discharging is 25°C without compensation.
Step 5: Connect the Remote Meter MT11 and AES Signal of the Refrigerator
- Connect the MT11 remote meter via the RS485 communication cable. Refer to the MT11 user manual for operation.
- Connect the AES signal to your refrigerator. For DR1206/2206/3206/2210/3210N models, an AES-ADP adapter is necessary when connecting a refrigerator.
Step 6: Power On the Controller
- Turn on the BATT2 safety switch and check its charging indicator.
- Turn on the BATT1 safety switch and check its charging indicator.
- Connect the PV array circuit breaker.
CAUTION: If the controller is not operating properly or shows an abnormality, refer to the Troubleshooting section.
5. Operating Instructions
5.1 Battery Charging Stages (BATT1)
The controller uses a three-stage charging algorithm: Bulk Charging, Constant Charging (Boost/Equalize), and Float Charging.
- Bulk Charging: Controller operates in constant current mode (MPPT Charging) until battery voltage reaches the constant voltage set point.
- Constant Charging: MPPT charging stops, and current gradually drops. This stage has two phases:
- Boost Charging: Default duration is 2 hours. System switches to float charging after this period.
- Equalize Charging: Starts on the 28th of each month for 120 minutes. This increases battery voltage above standard to stir electrolytes and balance cells.
- Float Charging: Battery voltage is reduced to a preset float voltage by reducing charging current, maintaining a fully charged state. If loads exceed solar array power, the system exits float charging and re-enters bulk charging when voltage drops below boost reconnect voltage.
5.2 Starter Battery (BATT2) Operation
- The controller trickle charges BATT2 at 1A constant current. Charging stops when BATT2 reaches