EPEVER IT-NC G3 Series (IT5420NC G3, IT6415NC G3, IT6420NC G3, IT7415NC G3, IT7420NC G3, IT8420NC G3, IT10415NC G3, IT10420NC G3, IT6415NC G3 BLE, IT10415NC G3 BLE)

Contents

EPEVER IT-NC G3 Series MPPT Solar Charge Controller User Manual

Models: IT5420NC G3, IT6415NC G3, IT6420NC G3, IT7415NC G3, IT7420NC G3, IT8420NC G3, IT10415NC G3, IT10420NC G3, IT6415NC G3 BLE, IT10415NC G3 BLE

Brand: EPEVER

Important Safety Instructions

Please keep this manual for future reference. This manual contains safety, installation and operation instructions for the IT-NC G3/IT-NC G3 BLE series solar charge controller (hereinafter referred to as "controller").

  • Read all the instructions and warnings carefully in the manual before installation.
  • No user-serviceable components inside the controller, do not attempt to disassemble or repair the controller.
  • Install the controller indoors to avoid component exposure and water ingress.
  • Install the controller in a well-ventilated place; the heat sink temperature will be very high during operation.
  • Do not install the controller in humid, salt spray, corrosive, greasy, flammable, explosive, dust accumulative or other harsh environments.
  • It is recommended to install the proper fast-acting fuses/breakers externally.
  • Disconnect PV array connections and the battery fast-acting fuse/breakers before controller installation and adjustment.
  • Check whether the wiring is tight to avoid the danger caused by heat accumulation due to loose connection.
  • The entire system should be installed and operated by professional personnel!

Symbols Explanation

To ensure the user's personal and property safety while using this product, relevant information is provided in the manual and highlighted with the following symbols. Please read the relevant texts carefully when you encounter the following symbols in the manual.

DANGER

Indicates a high-level hazard that, if not avoided, will result in serious injury or death.

WARNING

Indicates a medium-level hazard that, if not avoided, could result in death or serious injury.

CAUTION

Indicates a low-level hazard that, if not avoided, could result in minor or moderate injury.

NOTICE

Indicates an important reminder during the operation which, if ignored, may result in an equipment error alarm.

Tip

Indicates recommendation for reference.

1. General Information

1.1 Overview

The EPEVER IT-NC G3/IT-NC G3 BLE series solar charge controllers feature a new design concept, integrating a solar charge controller with a built-in Bluetooth module (for BLE series). Users can monitor and set parameters via a mobile app.

These controllers utilize a new generation MPPT control algorithm, significantly improving maximum power point tracking and response speed. This minimizes power loss and ensures high tracking efficiency across various sunlight conditions and power bands. They can capture energy effectively from solar panels.

Key features include independent voltage stabilization, allowing direct load connection without a battery, and compatibility with various lithium battery types. The low-power design reduces static power consumption, extending system standby time. Functions like charging current/power limits and automatic power reduction at high temperatures ensure system stability.

The controller boasts an IP32 protection level (up to IP43 with an optional white terminal cover) and includes short-circuit protection. An isolated RS485 communication interface supports optional WiFi, Bluetooth, TCP, and 4G modules for remote monitoring. The communication port can be enabled or disabled to further reduce static power consumption.

A self-adaptive three-stage charging mode extends battery life and improves system performance. Comprehensive electronic protections (overcharge, over-discharge, PV/battery reverse polarity) ensure safety and stability. The controller supports parallel charging for up to 6 units, facilitating system capacity expansion. It is suitable for RVs, ships, industrial monitoring, and small to medium-sized solar power systems.

1.2 Features

  • Low power consumption with static loss less than 50mA.
  • Independent voltage stabilization.
  • Advanced MPPT technology, with maximum tracking efficiency not less than 99.5%.
  • Supporting two PV inputs to improve PV utilization (for IT8420NC G3, IT10415NC G3, IT10415NC G3 BLE and IT10420NC G3 models).
  • Conversion efficiency up to 98.5%.
  • Supporting multiple battery types, including lithium batteries.
  • Stable self-activation for lithium batteries.
  • Supporting local setting of main control parameters.
  • RS485 communication interface, connected with optional WiFi, Bluetooth, TCP, 4G and other modules for remote monitoring.
  • Some models have built-in Bluetooth module (IT-NC G3 BLE series) to read and modify parameters directly through APP.
  • Dual limits for rated charging power and charging current.
  • Automatic power reduction when charging at high temperature.
  • Multiple load control modes.
  • Comprehensive electronic protections.
  • Protection level IP32, up to IP43 with white terminal cover.
  • Built-in independent BMS communication port.
  • Built-in CAN parallel communication port.
  • Real-time data logging, event logging and energy statistics.
  • Remote switch control, easy to turn on/off.
  • Dry contact output to turn on/off the oil generator.
  • All metal die-casting shell.
  • Compliant with IEC62109, UL1741, EMC (Class B) and other relevant standards.

1.3 Naming Rules

The model names follow a specific structure to indicate their features:

IT 10 4 20 N C G3

  • IT: Product series (IT series with load).
  • 5/6/7/8/10: Rated charging/discharging current (5=50A, 6=60A, 7=75A, 8=80A, 10=100A).
  • 2/4: Battery rated voltage (2=12/24VDC, 4=12/24/36/48VDC).
  • 15/20: PV maximum open-circuit voltage (15=150V, 20=200V).
  • N/P/X: Common negative system (N), Common positive system (P), Not common positive or common negative (X).
  • C/E: LCD screen (C), LED indicator (E).
  • G3: The 3rd generation.
  • BLE: Built-in Bluetooth module (only for IT-NC G3 BLE series).

1.4 System Wiring Diagram

The controller supports both 'No battery mode' and 'Battery mode'.

No Battery Mode

When no battery is present, the IT-NC G3/IT-NC G3 BLE series controller can be directly connected to an inverter. The inverter must be connected to the battery terminals of the controller and meet specific power conditions:

  • For high-frequency inverters: PV input power > (load output power / inverter conversion efficiency / controller conversion efficiency).
  • For industrial frequency inverters: PV input power > (load output power / inverter conversion efficiency / controller conversion efficiency) × 2.
No Battery Mode Wiring Diagram
Wiring diagram for no battery mode, showing PV arrays connected to the controller, which then connects to an inverter.

Battery Mode

In a system with a battery connected, if an inverter is needed, it should be connected directly to the battery pack, not to the load terminals of the controller.

Battery Mode Wiring Diagram
Wiring diagram for battery mode, showing PV arrays, controller, battery, and loads. Note: This image is a general product view, not a specific wiring diagram from the PDF. The PDF page 16 shows a more detailed wiring diagram.
NOTICE
  • Ensure that the length of battery connection cable is less than 3 meters.
  • Ensure that the length of load connection cable is less than 3 meters.
  • Ensure that the length of communication cable is less than 3 meters.
  • It is recommended that the length of the PV connection cable is less than 3 meters. If the length of the PV connection cable is less than 3 meters, it meets the requirements of EN/IEC61000-6-3 standard; If the length of the PV connection cable exceeds 3 meters, it may not meet the requirements of the EN/IEC61000-6-3 standard.

2. Installation

2.1 Attention

  • Be careful when installing batteries. Wear protective goggles when installing flooded lead-acid batteries, and rinse with clean water if contact with battery acid occurs.
  • The battery and PV connections must be guarded against inadvertent contact. Install the solar charge controller in an enclosure or use the optional white terminal cover.
  • Keep the battery away from any metal objects to prevent short circuits.
  • Acidic gases may be generated when charging the battery; ensure the environment is well ventilated.
  • Avoid direct sunlight and rain infiltration for outdoor installation.
  • Do not install the controller in humid, salt spray, corrosive, greasy, flammable, explosive, dust accumulative, or other harsh environments.
  • Loose power connections and corroded cables can result in high heat, melting insulation, burning materials, or even fire. Ensure tight connections and secure cables with ties to prevent swaying.
  • Charge only lead-acid and lithium-ion batteries within the controller's control range.
  • The battery terminals on the controller can connect to a single battery or a group of batteries.
  • Select system connection cables with a current density no greater than 5A/mm².
  • The stripped length for wiring should not be too long, and exposed metal parts should not protrude from the terminal block.
  • Refer to IEC62109 for grounding wire cross-sectional area; it should not be less than 4mm².
  • The torque for tightening wiring screws should be not less than 1.2 N·m.

2.2 Requirements for the PV Array

The controller is designed to suit various types of PV modules. The suitable serial connection for different PV modules depends on the open-circuit voltage (Voc) and maximum power point voltage (VMPP) of the MPPT controller. Refer to the tables in the full PDF manual for detailed PV module series connection recommendations based on battery voltage and cell count.

NOTICE
  • When PV modules are connected in series at the lowest temperature, the total voltage must not exceed the controller's maximum PV open circuit voltage (150V for IT**15NC G3, IT**15NC G3 BLE; 200V for IT**20NC G3).
  • When PV modules are connected in series at 25°C, the total voltage must not exceed the controller's maximum PV open circuit voltage (138V for IT**15NC G3, IT**15NC G3 BLE; 180V for IT**20NC G3).

2.3 Cable Specifications

Wiring and installation must conform to national and local electrical code requirements.

The minimum PV cable specifications are determined by the PV module's short-circuit current (Isc). The PV array's Isc must not exceed the controller's maximum PV input current. Refer to the full PDF manual for a table of recommended maximum input current and cable specifications for each model.

Battery cable specifications should be selected according to the rated current. Refer to the full PDF manual for a table of recommended rated charging current and battery cable specifications for each model.

Load Wiring Specifications

Refer to the full PDF manual for a table of recommended rated load current and load cable specifications for each model.

NOTICE
  • The cable specification is only for reference. If there is a long distance between the PV array and the controller or between the controller and the battery, thicker cables can be used to reduce voltage drop and improve system performance.
  • For the battery, the recommended cable specification is selected according to the conditions that its terminals are not connected to any additional inverter.

2.4 Mounting the Controller

DANGER
  • Risk of explosion! Never install the controller in an enclosed space with flooded batteries! Do not install it in a confined area where battery gas can accumulate.
  • Electric shock hazard! The PV array may generate a very high open circuit voltage. Disconnect the circuit breaker or fast-acting fuse first and be careful when wiring.
NOTICE

When installing the controller, ensure there is enough airflow through the heat sink, and leave at least 150mm of clearance above and below for natural convection. If mounted in a closed cabinet, ensure heat can be dissipated.

Step 1: Determine Installation Position and Heat-Dissipation Space

Ensure adequate airflow and clearance (at least 150mm above and below) for heat dissipation.

Installation Diagram (IP32 and IP43)
General product view, for detailed installation diagrams showing clearance, refer to page 21 of the PDF manual.

Step 2: Remove the Terminal Cover

Remove the terminal cover with a screwdriver before wiring.

2.5 Wiring the Controller

Connect the controller in the following sequence: ① Ground > ② Battery > ③ Load > ④ PV array > ⑤ Communication modules. Disconnect in reverse order. The following diagram illustrates the wiring for the IT10420NC G3; refer to actual terminal positions for other models.

Wiring Diagram for IT10420NC G3
General product view, for detailed wiring diagrams showing connections for PV, Battery, Load, and Communication modules, refer to page 22 of the PDF manual.

2.5.1 Grounding

IT-NC G3 and IT-NC G3 BLE series are common-negative controllers. Negative terminals of the PV array, battery, and load can be grounded simultaneously, or any negative terminal can be grounded. The grounding terminal on the shell must be grounded to shield against electromagnetic interference and prevent electric shock.

NOTICE
  • According to the actual application, the negative terminals of the PV array, battery and load may not be grounded. However, the grounding terminal on the shell must be grounded to effectively shield the external electromagnetic interference and to avoid the electric shock to the human body caused by the live shell.
  • For common-negative systems, such as the RV system, it is recommended to use a common-negative controller. If a common-positive controller is used and the positive electrode is grounded in the common-negative system, the controller may be damaged.

2.5.2 Connecting the Battery

NOTICE
  • Protection is triggered if only battery connection is reversed, but do not reverse battery connection if PV is correctly connected, as this may damage the controller.
  • Do not connect the circuit breaker or fast-acting fuse when wiring. Ensure '+' and '-' poles are connected correctly.
  • A fast-acting fuse (1.25 to 2 times the controller's rated current) must be installed on the battery side, no more than 150mm from the battery.
  • Connect the inverter directly to the battery when using an inverter in the system.

2.5.3 Connecting the DC/AC Loads

DC loads can be directly connected to the controller's load terminals. AC loads require connection through a DC/AC inverter. Note: DC load surge current should be less than the product's rated value. DC/AC inverters must be connected directly to the battery.

2.5.4 Connecting the PV Modules

DANGER

Electric shock hazard! The PV array can generate very high voltage. Disconnect the circuit breaker before wiring, and ensure that the leads of '+' and '-' poles are connected correctly.

NOTICE

If the controller is used in an area with frequent lightning strikes, an external surge arrester must be installed at the PV input and utility input terminals.

2.5.5 Connecting Optional Accessories

The controller supports various optional accessories for enhanced functionality.

  • Connecting the BMS-Link Module: For systems using lithium batteries with BMS function, connect the BMS-Link module and lithium batteries through port 12. The BMS-Link module converts different BMS protocols to EPEVER's standard protocols for communication.
  • Connecting the Remote Temperature Sensor (Model: RTS-D47K): If the system has no BMS function, attach the RTS-D47K close to the battery to detect real-time battery temperature. The temperature data is transmitted via RS485 communication for improved system safety. Set the BMS protocol number to 32 when connecting the remote temperature sensor to the BMS port.
  • Connecting Communication Modules: Connect WiFi, Bluetooth, TCP, or 4G modules to the RS485 COM port for remote monitoring and parameter modification via a mobile app. (Note: IT-NC G3 BLE series has built-in Bluetooth, so no external Bluetooth module is needed).
RS485 Communication with Bluetooth/WiFi/4G
Diagram showing the controller connected to a mobile phone via Bluetooth/WiFi/4G for real-time data monitoring.

2.6 Powering on the Controller

Connect the battery's fast-acting fuse to power on the controller. Once the LCD displays normally and the charge enable terminals are connected, connect the PV array's circuit breaker. The charging indicator will flash slowly during PV charging.

Tip

If the controller does not work properly or the fault indicator activates after powering on, refer to the Troubleshooting section.

3. Operating Instructions

3.1 Interface Overview

The LCD can be viewed clearly when the angle between the user's horizontal sight and the LCD is within 90°. If the angle exceeds 90°, the information may not be clearly visible.

LCD Display Overview
General product view showing the LCD display. For detailed indicator descriptions, refer to page 28 of the PDF manual.

3.2 Buttons

The controller features several buttons for navigation and setting parameters:

ButtonOperationDescription
Press (< 50ms)Exit the current interface.
Press and hold (> 2.5s)Turn on/off the load.
△▽Press (< 50ms)Browse the interface: Up/Down. Set the parameter value as per step size.
△▽Press and hold (> 2.5s)Browse the interface: invalid. Set the parameter value quickly as per step size.
Press (< 50ms)Confirm the setting parameters.
Press and hold (> 2.5s)Switch real-time interface to setting browsing interface. Switch setting browsing interface to parameter settings interface. Confirm setting parameters.

3.3 LCD Display

The LCD displays various icons and statuses related to PV array, battery, and load. For a detailed breakdown of each icon and its meaning, refer to page 30 of the PDF manual.

3.4 Browsing Real-time Data

After the controller is powered on, press the 'Enter' button on the LCD to cycle through PV, battery, and load real-time data interfaces.

3.4.1 PV Data

You can view PV1 input voltage, current, power, energy, and for models with dual PV inputs, PV2 data as well.

3.4.2 Battery Data

You can view battery voltage, total current (charging current), charging/discharging power, SOC, and battery temperature.

3.4.3 Load Data

You can view load output current, power, energy, and the current load operating mode.

3.5 Parameters Setting

To set parameters:

  1. In the PV/battery/load real-time data browsing interface, press and hold the 'Enter' button to enter the parameter setting interface.
  2. Press the 'Up/Down' buttons to select the parameter to be set.
  3. Press and hold the 'Enter' button to enter the setting interface (the parameter value will blink).
  4. Modify the parameter value using the 'Up/Down' buttons.
  5. Press the 'Enter' button to confirm the parameter value.
  6. Press the 'Exit' button to exit the parameter setting interface and return to the real-time data browsing interface.

The default values and setting ranges for controller parameters are listed in the full PDF manual (pages 33-46). Most parameters can be modified directly via the LCD, except for some read-only ones.

3.5.4 Setting Parameters Remotely

Parameters can also be set remotely using PC software or a mobile app.

  • Via PC Software: Connect the controller's COM port to a PC USB port using a USB to RS485 communication cable. Use the PC software to set 'USER' voltage parameters.
  • Via APP (External WiFi Module): Connect a WiFi module to the controller's COM port. Set 'USER' voltage parameters via the app using the WiFi signal.
  • Via APP (External Bluetooth Module): Connect a Bluetooth module to the controller's COM port. Set 'USER' voltage parameters via the app using the Bluetooth signal.
  • Via APP (Built-in Bluetooth Module - IT-NC G3 BLE series only): For IT-NC G3 BLE series, connect directly via mobile phone Bluetooth. Set 'USER' voltage parameters via the app.
Remote Parameter Setting via App
Illustration of remote parameter setting using a mobile app connected via Bluetooth/WiFi/4G.

3.6 Load Operation Mode

The controller offers several load operation modes:

  • Manual Mode (ON by default): Turn the load ON/OFF manually using the button or remote commands (PC software, APP, remote monitoring unit).
  • Sunset Load ON Mode: The load turns ON at dusk and OFF at dawn.
  • Sunset Load ON + Timer Mode: The load turns ON at dusk and stays ON for a set duration (Timer 1), then turns OFF. It can also have a second timer (Timer 2) for turning ON before sunrise.
  • Timer Mode: Control load ON/OFF time by setting a real-time clock.
  • Always ON Mode: The load is always ON after being powered on, suitable for loads requiring 24-hour power supply.
  • Sunrise Load ON Mode: The load turns ON at sunrise and OFF at dusk.

Load operating modes can be set via PC software, APP, and remote monitoring units. Refer to the full PDF manual (pages 50-53) for detailed diagrams and settings.

4. Maintenance

4.1 General Maintenance

To ensure long-term working performance, it is recommended to inspect the following items twice a year:

  • Ensure the airflow around the controller is not blocked, and remove dirt or debris from the heat sink.
  • Check whether the insulation of exposed cables has been damaged by sunlight, friction with other surrounding objects, dryness, insects, or rodents. Repair or replace cables if necessary.
  • Check whether the indicator and display are consistent with the actual operation of the equipment. Take corrective action in case of inconsistency or error.
  • Check terminals for signs of corrosion, insulation damage, high temperature, or burning/discoloration. Tighten terminal screws.
  • Check for signs of dirt, insect nesting, and corrosion, and clean up as required.
  • If the lightning arrester has failed, replace it in time to avoid lightning strikes' damage to the controller or other equipment.
DANGER

Electric shock hazard! Ensure that the power supply of the controller is disconnected when performing any maintenance operations!

5. Troubleshooting

5.1 Protections

The controller incorporates various protection mechanisms to ensure safe and reliable operation:

ProtectionDescription
PV Current/Power-LimitingWhen actual charging current/power exceeds rated values, the controller charges at rated current/power.
PV Short CircuitController is not damaged if PV is short-circuited when not charging. Note: Do not short-circuit PV array during charging.
PV Reverse PolarityController is not damaged and resumes normal operation after correction. Note: If PV array is reversed and actual power is 1.5 times rated power, controller may be damaged.
Night Reverse ChargingPrevents battery discharge through PV module at night.
Battery OvervoltageController stops charging when battery voltage exceeds 'OVD' (Overvoltage Disconnect Voltage).
Battery Over DischargeOver discharge alarm occurs when battery voltage drops below 'LVD' (Low Voltage Disconnect Voltage).
Battery Over TemperatureController stops working if battery temperature exceeds 65°C and resumes below 55°C.
Battery Reverse PolarityIf battery polarity is reversed alone, or PV and battery are reversed simultaneously, or battery reversed first then PV connected correctly, controller is not damaged and continues to work after correction. Note: If PV is connected correctly and controller is working, then reversing battery polarity will damage the controller.
Lithium Battery Low Temperature Charging/DischargingController stops charging if temperature is below 'LTCL' (Low Temperature Charging Limit) and resumes above 'LTCL'.
Load OverloadIf load current exceeds 1.02 times rated current, output cuts off after a delay. After 5 automatic recovery attempts, reduce load, restart controller, or wait for night-to-day change.
Load Short-CircuitIf short circuit occurs (≥ 4 times rated load current), controller protects and cuts off output. After 5 automatic recovery attempts, load is locked. Restart controller or wait for night-to-day change to clear.
Controller Over TemperatureController stops operating if internal temperature exceeds 85°C and resumes below 75°C.
TVS High Voltage SurgeInternal TVS protects against high-voltage surges with less energy. External lightning arrester recommended in frequent lightning areas.

5.2 Troubleshooting Guide

If the controller encounters an issue, refer to the following guide for possible causes and solutions:

StatusError CodePossible ReasonsTroubleshooting
PV indicator is fast flashing green.POVPV OvervoltageCheck if connected PV open circuit voltage is higher than PV maximum open circuit voltage. Alarm clears when PV open circuit voltage is lower than PV maximum open circuit voltage minus 5V.
PMEPV Work Mode ErrorCheck if PV connection method is consistent with 'PCM (PV Connection Mode)' settings.
RPPPV Reverse Polarity ProtectionCheck if PV is connected to the battery correctly.
PREPV Relay ErrorTurn off controller, wait 5 mins, then turn on. If error persists, contact technical support.
PPLPV Power LowWait for sufficient sunlight to check if fault clears.
BATT indicator is solid orange.BUVBattery Undervoltage AlarmDisconnect loads, check if battery voltage is too low. After charging and voltage restored above 'UVAR', normal operation resumes.
CUVCell Undervoltage ProtectionCheck BMS communication status or BMS parameters.
BATT indicator is solid red.BODBattery Over Discharging ProtectionDisconnect loads, check if battery voltage is too low. After charging and voltage restored above 'LVR', normal operation resumes.
BATT indicator is fast flashing red.BOFBMS Other FaultCheck if battery BMS connection is normal.
LBVELithium Battery Rated Voltage Identification ErrorCheck if lithium battery is connected correctly or if voltage uploaded by BMS is consistent with voltage at controller battery terminals.
BATT indicator is fast flashing green.BOVBattery Overvoltage ProtectionDisconnect all charging, measure battery voltage. Check if connected battery voltage matches rated level or if 'OVD' setting is inconsistent. Alarm clears when voltage drops below 'OVR'.
BATT indicator is slowly flashing red.COVCell Overvoltage ProtectionCheck BMS communication status or BMS parameters.
BOTBattery Over TemperatureEnsure battery is in cool, well-ventilated place. Check if actual charging/discharging current exceeds 'Battery Max Charging Current'. Resumes normal control when temperature drops below 'BATT OTPR'.
BATT indicator is slowly flashing green.SDPSOC Discharging ProtectionCharge battery to 'DPRS' (Discharging Protection Recovery SOC).
SLBPSOC Low Battery ProtectionCharge battery to 'LBAR' (Low Battery Alarm Recovery SOC).
Yellow Load indicator is off.LSCLoad Short CircuitDisconnect all loads, turn off controller, wait 5 mins, then turn on. If error persists, contact technical support.
PV indicator is fast flashing green.DOTDevice Over TemperatureEnsure controller is in cool, well-ventilated place. Resumes normal charging when temperature drops below 'DOT'.
BATT indicator is fast flashing orange.DCFDSP Communication FaultTurn off controller, wait 5 mins, then turn on. If error persists, contact technical support.

For a complete list of error codes and their abbreviations, refer to Appendix II of the full PDF manual (pages 77-80).

6. Specifications

6.1 Electrical Parameters (Common for IT-NC G3 Series)

ParameterValue
Battery Rated Voltage12/24/48VDC or Auto
Controller Operating Voltage Range8-62V
Battery TypeAGM (Default)/GEL/FLD/User
Lithium Battery TypeLiFePO4/Li(NiCoMn)O2/User
MPPT Voltage Range(Battery voltage plus 2V, and > 28V) to 144V (@ 25°C)
Tracking Efficiency≥ 99.5%
Maximum Conversion Efficiency98.1% - 98.6% (varies by model)
Full Load Efficiency97.1% - 98.0% (varies by model)
Temperature Compensation Coefficient-3mV/°C/2V (Default)
Static Loss (Enabled Communication)98mA/12V; 60mA/24V; 46mA/48V
Static Loss (Disabled Communication)48mA/12V; 25mA/24V; 14mA/48V
Grounding TypeCommon negative grounding
Dry Contact (Oil Generator)Rated value: 5A/30VDC; Maximum value: 0.5A/60VDC
Communication MethodRS485 5VDC/200mA (RJ45)

For specific Rated Charging/Discharging Current, Rated Charging Power, Maximum Charging Power, Rated Load Current, Maximum Load Current, and PV Maximum Open-circuit Voltage for each model (50A, 60A, 75A, 80A, 100A), please refer to the detailed tables in the full PDF manual (pages 61, 63, 65, 67, 69).

6.2 Mechanical Parameters (Common for IT-NC G3 Series)

ParameterValue
Mounting Dimension (L × W)295mm × 130mm (for 50A models) to 340mm x 140mm (for 100A models)
Mounting HoleΦ7mm
Wiring Terminal6AWG/16mm² (for 50A/60A models) to 2AWG/35mm² (for 75A/80A/100A models)
Recommended Cable6AWG/16mm² (for 50A/60A models) to 2AWG/35mm² (for 75A/80A/100A models)

For specific dimensions (L × W × H) and weight for IP32 (Controller Only) and IP43 (Controller & White Terminal Cover) for each model, please refer to the detailed tables and diagrams in the full PDF manual (pages 62, 64, 66, 68, 70, 72-76).

6.3 Environmental Parameters

ParameterValue
Operating Temperature-25°C to +60°C (> 40°C derating)
LCD Operating Temperature-20°C to +70°C
Storage Temperature-30°C to +70°C
Relative Humidity5%-95% (N.C.)
Altitude< 5,000M (> 2,000m derating)
Ingress ProtectionIP43 (Controller & White Terminal Cover); IP32 (Controller Only)
Pollution DegreeII

6.4 Certifications

CertificationStandard
SafetyEN/IEC62109-1
EMCEN61000-6-1/EN61000-6-3
FCC47 CFR Part 15, Subpart B
ROHSIEC62321-3-1

7. User Tips

  • Remote Monitoring: For models without built-in Bluetooth (non-BLE series), consider purchasing an external WiFi or Bluetooth communication module to enable remote monitoring and parameter adjustment via the EPEVER mobile app. This allows for convenient system management from your smartphone.
  • PDF Manual: For detailed technical specifications, wiring diagrams, and parameter lists, please refer to the official user manual PDF available at: EPEVER Solar Charge Controller User Manual (PDF).

8. Warranty and Support

For warranty information, technical support, or any inquiries regarding your EPEVER Solar Charge Controller, please contact EPEVER directly.

HUIZHOU EPEVER TECHNOLOGY CO., LTD.
Phone: +86-752-3889706
Email: info@epever.com
Website: www.epever.com

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.