EPever Tracer3210AN G3

Contents

EPEVER Tracer3210AN G3 MPPT Solar Charge Controller

User Manual

Brand: EPever | Model: Tracer3210AN G3

1. Overview

The Tracer-AN G3 series MPPT solar charge controller is designed with advanced Maximum Power Point Tracking (MPPT) technology. This controller efficiently tracks the maximum power point of the solar array to maximize energy harvesting, offering up to 30% more power compared to traditional PWM controllers. It supports both 12V and 24V auto-identified systems and is compatible with various battery types, including lithium batteries and a unique no-battery mode.

Key Features:

  • Advanced MPPT technology with >99.5% tracking efficiency.
  • Innovative MPPT algorithm to minimize power loss and tracking time.
  • Accurate recognition and tracking of multi-peak maximum power points.
  • Wide MPP operating voltage range for optimized PV utilization.
  • Maximum DC/DC conversion efficiency of 98%.
  • Support for multiple battery types, including lithium batteries.
  • Stable self-activation function for lithium batteries.
  • Adjustable battery voltage parameters via LCD, PC software, or mobile app.
  • Battery temperature compensation.
  • Charging power and current limits to prevent overcharging.
  • Real-time energy statistics function.
  • Automatic charging power reduction for over-temperature conditions.
  • Built-in Bluetooth for convenient settings adjustment via EPEVER APP (BLE series).
  • RS485 communication interface for remote monitoring (with optional 4G or Wi-Fi modules).
  • Standard Modbus communication protocol.
  • Comprehensive electronic protections.
  • Multiple load work modes.
  • Low self-consumption (less than 10mA).
  • Constant voltage output function for direct load supply without batteries.

Product Showcase:

Video: A visual overview of the EPEVER MPPT Solar Charge Controller Tracer AN Series, showcasing its design and features.

2. Specifications

Electrical Parameters:

ParameterTracer3210AN G3/G3 BLE
Battery Rated Voltage12/24VDC Auto-recognition
Rated Charging Current30A
Rated Discharge Current30A
Controller Work Voltage Range8~31V
PV Maximum Open-circuit Voltage100V (at minimum operating environment temperature), 92V (at 25°C environment temperature)
MPPT Voltage Range(Battery voltage +2V)~72V
Rated Charging Power390W/12V, 780W/24V
Static Losses<8mA(12V), <5mA(24V)
Discharge-circuit Voltage Drop≤0.23V
Temperature Compensation-3mV/°C/2V (Default)
Grounding TypeCommon negative
RS485 Port5VDC/200mA(RJ45)
LCD Backlight TimeDefault:60S, Range:0~999S

Environmental Parameters:

ParameterValue
Work Temperature Range-25°C~+45°C (100% loads working)
Storage Temperature Range-20°C~+70°C
Relative Humidity< 95% (N.C.)
EnclosureIP30

Mechanical Parameters:

ParameterTracer3210AN G3/G3 BLE
Dimensions (L x W x H)228 x 164 x 55mm
Mounting Size (L x W)170 x 155mm
Mounting Hole SizeΦ5mm
Terminal (Recommended Wire Size)8AWG(10mm²)
Net Weight1.26kg

Conversion Efficiency Curves:

The following graphs illustrate the conversion efficiency of the Tracer3210AN G3 controller under various PV array maximum power point voltages and system voltages.

13V Conversion Efficiency Curves for MPPT 17V and 34V
Figure: 13V Conversion Efficiency Curves for MPPT 17V and 34V.
26V Conversion Efficiency Curves for MPPT 34V, 51V, and 68V
Figure: 26V Conversion Efficiency Curves for MPPT 34V, 51V, and 68V.

3. Installation

Important Safety Instructions:

  • Read all instructions and warnings carefully before installation.
  • No user-serviceable components inside; do not disassemble or attempt repairs.
  • Mount the controller indoors, avoiding exposure to components and water.
  • Install in a well-ventilated place; the heat sink may become hot during operation.
  • Install appropriate external fast-acting fuses/breakers.
  • Disconnect PV array and battery connections before installation or adjustment.
  • Ensure power connections remain tight to avoid excessive heating.
  • WARNING: Do not install in humid, high salt spray, corrosive, greasy, flammable, explosive, dust accumulative, or other severe environments.

Mounting:

Step 1: Determine the installation location and heat-dissipation space.

Mounting diagram showing required clearance around the controller
Figure 2-1: Mounting diagram with 150mm clearance required above and below for proper airflow.

The controller requires at least 150mm of clearance above and below for proper airflow. Ventilation is highly recommended if mounted in an enclosure.

Step 2: Connect the system in the order of battery → load → PV array, and disconnect in the reverse order.

Connection Diagram:

Schematic Wiring Diagram for MPPT Solar Charge Controller
Figure 2-2: Schematic Wiring Diagram showing connections for PV, Battery, and Load.
  • Do not connect the circuit breaker or fast-acting fuse during wiring.
  • Ensure electrode polarity is correctly connected.
  • A fast-acting fuse (1.25 to 2 times rated current) must be installed on the battery side, no more than 150mm from the battery.
  • If an inverter is connected, connect it directly to the battery, not to the load side of the controller.

No-Battery Mode:

When no battery is present, the Tracer-AN G3/Tracer-AN G3 BLE series can be directly connected to an inverter. The inverter must be connected to the battery terminals of the controller and meet the following conditions:

  1. For high-frequency inverter: PV input power > (load output power ÷ inverter conversion efficiency ÷ controller conversion efficiency)
  2. For power frequency inverter: PV input power > (load output power ÷ inverter conversion efficiency ÷ controller conversion efficiency ÷ 2)

Wire Size Recommendations:

The PV array's output current varies. The minimum wire size can be calculated from the PV module's short circuit current (ISC). The PV array's ISC must not exceed the controller's maximum PV input current.

ModelMax. PV input currentMax. PV wire size
Tracer3210AN G3/G3 BLE30A10mm²/8AWG

Battery and Load Wire Size:

ModelRated charge currentRated discharge currentBattery wire sizeLoad wire size
Tracer3210AN G3/G3 BLE30A30A10mm²/8AWG10mm²/8AWG

Note: If there is a long distance between the PV array and the controller or between the controller and the battery, larger wires can be used to reduce voltage drop and improve performance.

Connecting Accessories:

Temperature Sensor: Connect the remote temperature sensor cable to the designated interface and place the other end close to the battery. If the sensor is not connected or damaged, the controller will use a default temperature setting of 25°C (no temperature compensation).

RS485 Communication: The internal circuit of the RS485 port has no isolation design. It is recommended to use an RS485 communication isolator before communicating.

Accessories for programming: MT52, RS485 cable, WiFi/BLE adapters
Figure: Optional accessories for programming and communication.

Power On: Connect the battery fast-acting fuse to power the controller. Check the battery indicator status (should be green for normal operation). Then connect the fast-acting fuse and circuit breaker of the load and PV array. The system will then operate in preprogrammed mode.

4. Operation

Product Characteristics (Figure 1-1):

Product characteristics diagram with numbered parts
Figure 1-1: Product Characteristics
  1. SELECT button
  2. RTS* Interface
  3. PV Terminals
  4. Battery Terminals
  5. Load Terminals
  6. RS485 communication interface
  7. Mounting Hole Φ5mm
  8. ENTER button
  9. LCD

LCD Display and Buttons:

The LCD screen displays system information. The display is clearest when viewed within a 90° angle. The controller has two buttons: SELECT and ENTER.

ModeNote
Load ON/OFFTurn load On/Off via the ENTER button in manual load mode.
Clear faultPress the ENTER button.
Browsing modePress the SELECT button.
Setting modePress and hold ENTER for 5s to enter setting mode. Use SELECT to set parameters, ENTER to confirm. Exits automatically after 10s of no operation.

Interface Status Description:

NameIconStatus
PV array☀️Day
🌙Night
🚫No charge
Battery🔋Charging
PV array's voltage, current, and generated energy
Battery capacity, In charging
Battery Voltage, Current, Temperature
Battery type
Load💡Load ON
Load OFF
Current/Consumed energy/Load mode

Setting Parameters:

Clear Generated Energy:

  1. Press and hold the ENTER button for 5s under the PV-generated energy interface until the value flashes.
  2. Press the ENTER button again to clear the generated energy.

Switch Battery Temperature Unit:

Press and hold the button for 5s under the battery temperature interface to switch the temperature unit.

Battery Type:

The controller supports Sealed (default), Gel, Flooded, LiFePO4, Li(NiCoMn)O2, and User-defined battery types.

To set locally:

  1. Press the SELECT button to navigate to the battery voltage interface.
  2. Press and hold the ENTER button until the battery-type interface flashes.
  3. Press the SELECT button to change the battery type.
  4. Press the ENTER button to confirm.

To set remotely (via PC software or APP):

  • Connect the controller's RJ45 port to a PC via a USB to RS485 cable. Use PC software to set voltage parameters when 'USE' battery type is selected.
  • Connect the controller to an external WiFi 2.4G adapter or Bluetooth adapter (for BLE series) via the RS485 communication port. Use the EPEVER APP to set voltage parameters when 'USE' battery type is selected.

Load Modes:

The controller offers various load working modes:

Mode (1**)Timer 1Mode (2**)Timer 2
100Light ON/OFF2 nDisabled
101Load ON for 1 hour since sunset201Load ON for 1 hour before sunrise
102Load ON for 2 hours since sunset202Load ON for 2 hours before sunrise
103~113Load ON for 3~13 hours since sunset203~213Load ON for 3~13 hours before sunrise
114Load ON for 14 hours since sunset214Load ON for 14 hours before sunrise
115Load ON for 15 hours since sunset215Load ON for 15 hours before sunrise
116Test mode2 nDisabled
117Manual mode (Default load ON)
118Always ON mode2 nDisabled

To set load modes, use PC software, APP, or a remote meter (MT50).

5. Maintenance

Perform the following inspections and maintenance tasks at least twice yearly for optimal performance:

  • Ensure no obstructions block airflow around the controller. Clean any dirt or debris from the radiator.
  • Check all exposed wires for insulation damage (sun exposure, friction, wear, insects, etc.). Repair or replace damaged wires as needed.
  • Verify that the indicator display matches actual operation. Address any troubleshooting or error conditions promptly.
  • Confirm that terminals show no corrosion, insulation damage, high temperature, or burnt/discolored signs. Tighten terminal screws to the suggested torque.
  • Clean any dirt, nesting insects, or corrosion.
  • Check the lightning arrester's condition. Replace if necessary to prevent damage to the controller and other equipment.

CAUTION: Risk of electric shock! Ensure the power is turned off before performing any maintenance operations.

6. Troubleshooting

FaultsDescriptionTroubleshooting
PV array open-circuitLCD shows no PV input when there is direct sunlight.Confirm PV array connection is correct and tight.
Battery voltage is lower than 8VThe wire connection is correct, but the controller is not working.Check battery voltage (at least 8V to activate controller).
Battery over voltageBattery frame blinks.Check if battery voltage is higher than OVD (over voltage disconnect voltage) and disconnect PV array.
Battery over dischargedBattery frame blinks.When battery voltage restores to or above LVR (low voltage reconnect voltage), load will recover. Recharge battery by other means.
Battery overheatingBattery frame blinks.Controller resumes when temperature declines below 55°C.
OverloadLoad off.Reduce number of electric devices. Restart controller or press button to clear faults.
Load short-circuitLoad and fault icon blink.Check load connections carefully, clear fault. Restart controller or press button to clear faults.

7. User Tips

  • Battery Compatibility: This controller supports a wide range of battery types including Lead-acid (Sealed, Gel, Flooded) and Lithium (LiFePO4, Li(NiCoMn)O2). Ensure you select the correct battery type in the settings for optimal charging and battery longevity. For custom battery parameters, use the 'User' setting and configure via PC software or mobile app.
  • Wiring Precautions: Always connect the battery first, then the load, and finally the PV array. Disconnect in the reverse order. This sequence prevents damage to the controller. Use appropriate wire sizes to minimize voltage drop, especially for longer distances.
  • Monitoring and Control: Utilize the optional WiFi or Bluetooth adapters with the EPEVER APP for convenient remote monitoring and parameter adjustment, enhancing system management.

8. Warranty and Support

For detailed warranty information, please refer to the official EPEVER warranty policy provided with your product or on the manufacturer's website.

For further technical support or detailed inquiries, please consult the complete user manual PDF available at: EPEVER Tracer-AN G3 User Manual (PDF).

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.