1. Introduction
This manual provides comprehensive instructions for the safe and efficient operation, maintenance, and troubleshooting of the Sanying BS260 Heat Film Shrink Tunnel. The BS260 is a semi-automatic packaging machine designed for batch shrink production, suitable for various products including software, biscuits, printing materials, floor tiles, chinaware, beverages, and beer, utilizing PVC, POF, PP, and PE shrink films.
2. Safety Instructions
Please read and understand all safety instructions before operating the machine. Failure to follow these instructions may result in injury or damage to the equipment.
- Ensure the machine is connected to a grounded power source with the correct voltage (220V or 220V/380V, 50-60HZ).
- Keep hands and loose clothing away from moving parts, especially the conveyor belt and shrink tunnel entrance/exit.
- Do not touch hot surfaces during or immediately after operation. The shrink tunnel operates at temperatures up to 300°C.
- Operate the machine in a well-ventilated area to prevent heat buildup and ensure proper air circulation.
- Never operate the machine with damaged power cords or components.
- Only trained personnel should operate and maintain this equipment.
- In case of emergency, immediately turn off the main power switch.
3. Product Overview
The Sanying BS260 is designed for efficient heat shrink packaging. Its robust construction and intelligent controls ensure reliable performance.
3.1 Components

- Dust Cover: Protects internal components from dust.
- Control Panel: Houses controls for temperature, heating, hot wind, and conveyor speed.
- Power Wire: Connects the machine to the power supply.
- Main Power Switch: Turns the machine on/off.
- Shrink Tunnel: The heated chamber where film shrinks around products.
- Convey Belt: Transports products through the shrink tunnel. Available with Aluminum Roller or Teflon Mesh Overlay.
- Conveyor Body: The main frame supporting the conveyor system.
3.2 Key Features
- Jet structure for efficient batch production.
- Intelligent temperature control system.
- Powerful turbing motor for stable operation.
- High-power DC motor for stepless speed regulation of the conveyor belt.
- Automatic heating stop/start based on set temperature for energy saving.
- Constructed from stainless steel for durability and ease of maintenance.
- Suitable for various shrink films: PVC, POF, PP, PE.
- Can be used as a stand-alone unit or integrated into a production line.
4. Specifications
| Feature | Specification |
|---|---|
| Model | BS260 |
| Brand Name | Sanying |
| Origin | Mainland China (Zhejiang) |
| Type | Wrapping Machine |
| Condition | New |
| Automatic Grade | Semi-automatic |
| Driven Type | Electric |
| Voltage | 220V, 220V/380V, 220V 50-60HZ |
| Dimension (L*W*H) | 1000*430*580MM |
| Weight | 35 KG |
| Certification | CE |
| Shrink Temperature | 0-300°C |
| Load Capacity | 5 KG |
| Compatible Packing Material | PVC, PP, POF |
| Packing Speed | 0~10m/min |
| Applicable Industries | Home Use, Retail, Food Shop, Construction works |
| Application | Food |
| Packaging Type | Cartons |
| Machine Packaging Material | Wood |
| Key Selling Points | Easy to Operate |
| Core Components | Motor |
| Warranty of Core Components | 6 Months |
5. Setup and Installation
Follow these steps to set up your BS260 shrink tunnel:
- Unpacking: Carefully remove the machine from its packaging. Inspect for any shipping damage.
- Placement: Place the machine on a stable, level surface in a well-ventilated area. Ensure sufficient space around the machine for operation and maintenance.
- Power Connection: Connect the power wire to a suitable grounded electrical outlet. Verify that the voltage matches the machine's requirements (220V or 220V/380V, 50-60HZ).
- Conveyor Belt Check: Ensure the conveyor belt (Aluminum Roller or Teflon Mesh Overlay) is properly installed and moves freely.
- Film Loading (Initial): While not explicitly detailed, prepare your shrink film (PVC, POF, PP, PE) for feeding into the tunnel.
The BS260 can operate as a stand-alone unit or be integrated into an existing production line. For integration, consult with a qualified technician.
6. Operating Instructions
Operating the BS260 involves setting the correct temperature and conveyor speed for optimal shrink results.
6.1 Control Panel Overview

- 温度调节 (Temperature Adjustment): Dial to set the desired shrink temperature (0-300°C).
- 加热 (Heating) Switch: Activates the heating elements.
- 热风 (Hot Wind) Switch: Activates the hot air circulation fan.
- 输送 (Convey) Switch: Activates the conveyor belt.
- 输送调节 (Convey Adjustment): Knob for stepless regulation of conveyor belt speed (0-10m/min).
6.2 Operation Steps
- Power On: Flip the Main Power Switch to the ON position.
- Set Temperature: Use the "温度调节" dial to set the desired shrink temperature. Start with a lower temperature and adjust as needed for your specific film and product.
- Activate Heating: Turn on the "加热" (Heating) switch and the "热风" (Hot Wind) switch. Allow the machine to preheat until the set temperature is reached. The intelligent control system will automatically stop heating once the target temperature is achieved and restart if it drops, ensuring energy efficiency.
- Set Conveyor Speed: Turn on the "输送" (Convey) switch. Adjust the "输送调节" knob to set the desired conveyor speed. Slower speeds allow more heat exposure, while faster speeds reduce it.
- Test Run: Before processing a batch, run a few test products to fine-tune temperature and speed settings for optimal shrink results.
- Load Products: Place products, pre-wrapped in shrink film, onto the conveyor belt. Ensure they are spaced appropriately to prevent jamming and allow even heat distribution.
- Monitor: Observe the shrinking process. Adjust settings if the film is not shrinking properly (too much heat/too slow speed can burn, too little heat/too fast speed can result in incomplete shrink).
- Power Off: After use, turn off the "加热" and "热风" switches, then the "输送" switch. Allow the machine to cool down before flipping the Main Power Switch to OFF.
7. Maintenance
Regular maintenance ensures the longevity and optimal performance of your BS260 shrink tunnel.
- Cleaning: The stainless steel construction makes the machine easy to clean. Regularly wipe down exterior surfaces. Ensure the shrink tunnel interior and conveyor belt are free from film residue or debris. Always disconnect power before cleaning.
- Conveyor Belt Inspection: Periodically check the conveyor belt for wear, damage, or misalignment. Replace if necessary.
- Electrical Connections: Ensure all electrical connections are secure and free from damage.
- Motor Inspection: The core component is the motor. While designed for durability, inspect it periodically for unusual noises or signs of wear.
- Storage: When not in use for extended periods, store the machine in a dry, dust-free environment.
8. Troubleshooting
This section addresses common issues you might encounter with the BS260 shrink tunnel.
| Problem | Possible Cause | Solution |
|---|---|---|
| Machine does not power on. | No power supply; Main Power Switch OFF; damaged power cord. | Check power connection and outlet; ensure Main Power Switch is ON; inspect power cord for damage. |
| Shrink tunnel not heating. | "加热" (Heating) switch OFF; temperature set too low; faulty heating element. | Turn on "加热" switch; increase temperature setting; contact support if heating element is suspected. |
| Conveyor belt not moving. | "输送" (Convey) switch OFF; conveyor speed set to zero; motor issue. | Turn on "输送" switch; adjust "输送调节" knob; contact support if motor is suspected. |
| Poor shrink quality (incomplete or burnt film). | Incorrect temperature or conveyor speed settings; wrong film type for temperature. | Adjust temperature and conveyor speed. Experiment with test products. Ensure film type (PVC, POF, PP, PE) is appropriate. |
| Excessive noise during operation. | Loose components; motor issue; debris on conveyor. | Inspect for loose parts and tighten; clean conveyor belt; contact support if motor noise persists. |
9. Warranty and Support
The Sanying BS260 Heat Film Shrink Tunnel comes with a 1-year warranty on the machine and a 6-month warranty on core components (Motor).
For technical support, troubleshooting assistance, or warranty claims, please contact Sanying customer service. Support options include:
- Video technical support
- Online support
Contact Information:
Wenzhou Sanying Machinery Manufacturing Co., Ltd.
Contact Person: Evelyn Xiao
Email: sanyingevelyn@163.com
Phone/Skype/Whatsapp: +86-13968832463
Alibaba.com: sanyingjx.en.alibaba.com






