TEC-LED Itanna Yika Gedu Itọnisọna Itọsọna Handrails
Thank you for your interest in our custom manufactured Illuminated Handrail system. STEP ONE
Iwadi ati wiwọn
Before we can provide an accurate quotation, we need to know exactly the nature and extent of componentry required for your handrail project. This requires a detailed and accurate measurement and assessment of the installation site by the client or their duly authorised representative and will form the basis of all procedures going forward. While it is a simple process, it needs to be accurate and thorough.
Teepu wiwọn
Chalk ila
Protractor
Ipele
- Using a chalk line (or other marking tool), draw a line from the first riser to the last riser, ensuring the line is equidistant from the riser nosings. Height above nosings is irrelevant, as long as it is equal. Measure and record this line in millimeters.
- Draw a second line at the landing, again ensuring it is equidistant above the landing. Measure and record this line in millimeters.
- Using a protractor, carefully measure the angle where the chalk lines meet. Record this angle.
- Continue this process along the entire extent of the staircase where a handrail is required. Use the following page as an example ti bi o ṣe le gbasilẹ tabi fa data naa, ati pari fọọmu naa ni oju-iwe ikẹhin bi o ṣe pataki. Ṣe akọsilẹ nibiti awọn ogiri ogiri wa (ti o ba wulo) nitori awọn wọnyi yoo ṣee lo lati ṣatunṣe awọn biraketi si.
Fọọmu Iwadi Ati Iwọn
Pari iyaworan laini, pẹlu awọn wiwọn ati awọn igun.
*Ti a beere
Apejuwe | ODIwọn |
Ijinna AB | 306.65 mm |
Ijinna BC | 1103.10 mm |
Distance C-D | 1322.20 mm |
Distance D-E | 3418.30 mm |
Asopọmọra a | 35 iwọn |
Olubaṣepọ b | 90 iwọn |
Asopọmọra c | 35 iwọn |
OTHER SITE INFORMATION | Ijinna si aaye awakọ ti o sunmọ julọ (wiwọle)* | 5m from top wall | Ohun elo odi | Nja |
Awọn sensọ ti a mu ṣiṣẹ ṣiṣẹ nilo (ni isalẹ ati oke awọn pẹtẹẹsì) | ![]() |
Suitable site top lace transformer/s | ![]() |
* Ipari ti Handrail lati ifunni agbara kan jẹ Max. 5000mm. Awọn ipari gigun eyikeyi yoo nilo lati ni awọn ifunni agbara pupọ lati yago fun Voltage drop. *Required
Ètò view
Igbega ẹgbẹ view
ISEGUN MEJI
Asọsọ
Upon receipt of your SURVEY and MEASURE information, our team will prepare an accurate quotation for your consideration. Note, unless otherwise agreed, the quotation does NOT include installation. STEP THREE
Iwe iṣelọpọ / s
Lẹhin gbigba asọye wa ati awọn ilana ilana miiran, ẹgbẹ imọ-ẹrọ wa yoo fun PRODUCTION SHEET/S ṣe alaye ni deede bi awọn paati ọwọ ọwọ yoo ṣe ṣe. Awọn iwe wọnyi yoo ṣe alaye:
- Length of each handrail
- Position of mounting brackets with dimensions between each bracket
- Nature and extent of joiner pieces
- Position of live wire/s
- Number of transformers and the LED run each transformer can service
The PRODUCTION SHEET/S will give you an opportunity to check the proposed componentry against site conditions, having regard to dimensions, joiner piece angles, 240V feed and any other site conditions that may affect the handrail. Ṣiṣejade yoo bẹrẹ ni kete ti o ba ti fọwọsi PRODUCTION SHEET/S ti o kẹhin ti alabara ti fowo si. Ni kete ti a fọwọsi ati iṣelọpọ, ko si iwọn tabi ipo akọmọ le yipada. Aṣoju Production Dì
* Gbogbo awọn wiwọn ti handrail pẹlu awọn bọtini ipari ati awọn alasopọ nibiti o yẹ.
Igbesẹ KẸRIN
Fifi sori ẹrọ
Prior to installation, check that the components received are correct when compared to the approved PRODUCTION SHEET/S. Notify TecLED immediately if anything is missing or incorrect.
Awọn irinṣẹ nilo
Ẹya ara irin-irin (ṣayẹwo lodi si PRODUCTION SHEET)
Teepu wiwọn
Ipele
Oluwari Stud (ti o ba wulo)
Awọn atunṣe ti o yẹ (awọn skru, awọn pilogi ogiri, awọn boluti ti o gbooro ati bẹbẹ lọ)
Blue painters teepu
LOCATE STUDS (if applicable)
Generally, studs are 450mm apart. Ideally, you would have located these studs in your SURVEY and indicated their position when approving the PRODUCTION SHEET/S.
ATTACHING HANDRAIL TO THE WALL
Check your local building codes to determine the desired height of the rail above the stairs. Once this height is ascertained, draw a line (or chalk line) at this height from the bottom of the stairs all the way to the top of the staircase (including landings). This will determine the position of the fixing brackets.
CONNECTING THE ELECTRIC WIRING
Your handrail is supplied with low voltage waya / s lati sopọ si awọn Amunawa / s. Isopọmọ si awọn transformers yẹ ki o ṣe nipasẹ eniyan ti o ni oye. Gbogbo awọn asopọ gbọdọ wa ni idabobo ati aabo. Ti awọn sensọ ti a mu ṣiṣẹ ba wa pẹlu, iwọnyi yẹ ki o sopọ si ẹrọ oluyipada / s bakanna bi awọn biraketi ti n ṣatunṣe.
AKIYESI Connection of the transformers to the 240V power supply can only be done by a duly licensed electrician
Fọọmu Iwadi Ati Iwọn
Pari iyaworan laini, pẹlu awọn wiwọn ati awọn igun.
*Ti a beere
Apejuwe | ODIwọn |
Ijinna AB | Mm |
Ijinna BC | Mm |
Distance C-D | Mm |
Distance D-E | Mm |
Asopọmọra a | Awọn iwọn |
Olubaṣepọ b | Awọn iwọn |
Asopọmọra c | awọn iwọn |
OTHER SITE INFORMATION | Ijinna si aaye awakọ ti o sunmọ julọ (wiwọle)* | m | Ohun elo odi | |
Awọn sensọ ti a mu ṣiṣẹ ṣiṣẹ nilo (ni isalẹ ati oke awọn pẹtẹẹsì) | ![]() |
Aaye ti o yẹ lati gbe ẹrọ iyipada/s | ![]() |
*Ti a beere
Ètò view
Igbega ẹgbẹ view
TecLED Pty Ltd - Sydney Head Office
Unit 4, 61 - 71 Beauchamp Opopona,
Matraville NSW 2036
Tẹlifoonu: (02) 9317 4177
Imeeli: sales@tecled.com.au
TecLED Pty Ltd - Melbourne
Tẹlifoonu0478 036 481
Imeeli: vicsales@tecled.com.au
TecLED Pty Ltd – Brisbane Showroom
The Build and Design Centre,
66 Merivale Street,
South Brisbane, QLD 4101
Imeeli: sales@tecled.com.au
TecLED Pty Ltd - Gold Coast
Yaraifihan nipasẹ ipinnu lati pade nikan
Tẹlifoonu0425 298 712
TecLED’s round timber handrails are supplied prefabricated, cut to the exact lengths required at your site and include all components needed for a complete, successful installation. Ṣe akiyesi pe connection of 240V mains power must be carried out by a licensed electrician.
Iwe yi ni gbogbo alaye ti o nilo lati:
Iwadi ati wiwọn
…the installation site to enable our technical team to determine precisely the nature and quantity of components required – and thus provide an deede agbasọ for your job.
Facilitate the issue of production sheets
…prior to manufacture to ensure that the prefabricated components accurately suit the installation site, thus avoiding any on-site complications or obstacles.
Full installation guidelines
…to ensure a sound, functional and legal install of your handrail.
A ṣeduro kika gbogbo iwe yii ṣaaju ki o to bẹrẹ lati le mọ ararẹ pẹlu ilana pipe ati nitorinaa yago fun eyikeyi awọn ọran ni isalẹ orin naa.
Ti ohunkohun ba kan ọ tabi o nilo alaye siwaju sii, jọwọ kan si wa:
Ẹgbẹ imọ-ẹrọ
Imeeli: eyal@tecled.com.au
Foonu: (02) 9317 4177 during business hours EST
Awọn iwe aṣẹ / Awọn orisun
![]() |
TEC-LED Itana Yika gedu Handrails [pdf] Ilana itọnisọna Awọn ọna Ifọwọṣe Igi Yiyi ti Imọlẹ, Awọn Ọwọ Igi Igi Yika, Awọn Ọwọ Igi igi, Awọn Ọwọ |