White Knight CPT-1 Cycle Rate Translators Instruction Manual
White Knight CPT-1 Cycle Rate Translators

To configure your Cycle Rate Translator with different connection methods, a power supply or request a specific revision level, please select options from the appropriate additional options (1-3).

Connection Method

  • W= 44 male pin to 1-Meter Wire Lead Cable
    Connection Method
  • Q= Quick Connect Plugs
  • S= 44 male pin to Screw Terminals
    Connection Method

Revision Level : Contact factory for copy exact code activation information.

White Knight Fluid Handling, Inc. wkfluidhandling.com

Documents / Resources

White Knight CPT-1 Cycle Rate Translators [pdf] Instruction Manual
CPT-1 Cycle Rate Translators, CPT-1, Cycle Rate Translators, Rate Translators, Translators

References

Leave a comment

Your email address will not be published. Required fields are marked *