Voltello-LOGO

CSIP-AUS CSIP-AUS Provisioning for Voltello Link App

CSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-PRODUCT

Specifications

  • Product: Voltello Link
  • Version: 1.0
  • Release Date: 062024

Product Usage Instructions

Link Placement:

Voltello Link devices require constant power and should be installed near a power outlet. Place the device where the Wi-Fi signal strength is strong. It can be positioned on a flat surface or mounted on a wall. Note that proximity to the solar inverter is not necessary as the devices connect over Wi-Fi.

Customer Steps:

  1. Create a Voltello account and share access with the installer.
  2. Ensure that the customer completes the setup steps before the installer arrives on-site.

Provisioning Steps:

  1. Download the Voltello app and create an account.
  2. Start customer onboarding and select the customer’s name.
  3. Access ‘Menu’ then ‘Plans and Offers’.
  4. Initiate CSIP-AUS Provisioning by managing the plan and contract.
  5. Add the inverter by selecting ‘Solar Inverter’ and proceeding with the setup.
  6. Connect to the inverter by scanning the QR code on the gateway and entering Wi-Fi credentials.
  7. Locate and select the inverter, add a name, and proceed with provisioning.
  8. If prompted, enter the Installer Code ‘VOLT’ to save and continue.

FAQ

Question: What if I encounter issues during the provisioning process?

Answer: If you face any difficulties or have\ questions, please contact our Support Desk through the Voltello appby selecting Menu > Support.

Voltello Link devices needs constant power and therefore will need to be installed in close proximity to a power point. Try to place the Link device in an areawhere you know the Wi-Fi signal strength is relatively strong.

Link devices can be placed on a flat surface or attached to the wallCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (1)

Link devices do not need to be close to the solar inverter. They connect over Wi-Fi.

Customer Steps

  • Prior to beginning this provisioning, it is essential that the customer has set up a Voltello account and shared access with you.
  • We recommend that the customer complete these steps before you arrives on site.
  • Please refer to the Customer Step-by-Step Guide

Customer Step-by-Step Guide

Provisioning Steps

  1. Download the Voltelloapp
    Create an account. Use an email you are happy to share with customersCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (2) CSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (3)
  2. Start customer onboarding
    Find the customer’s name across the top of the home screen by scrolling horizontally. Select the customer’s name. This assumes the customer has already created an account and shared access with youCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (4)
  3. Select “Menu” then “Plans and OffersCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (5)
  4. Start the CSIP-AUS Provisioning
    With ‘My Plans’ highlighted, you should see the CSIP-AUS Flexible Exports plan that the Household Customer has acceptedCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (6)
  5. Select “Manage Plan”and then “ManageContract”
    This will start the provisioningCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (7)
  6. Add an inverter
    Click “Add DeviceCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (8)
  7. Select “Solar Inverter”and click “Next”CSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (9)
  8. Select the inverter make and model
    Click “Continue”CSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (10)
  9. Select the gateway device
    Select the Link device and click “Next”CSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (11)
  10. Connect to the inverter
    Read the instructions and click “Lets get started”CSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (12)
  11. Scan the QR Code on the gateway
    Then enter the customer’s Wi-Fi credentials and click “Next“. This will get the Link device online and connected to the Village Energy CloudCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (13)
  12. Find the inverter
    Click “Find my smart inverter”. The Link will scan the home network for the inverter. You can also enter manually using the inverter’s IP addressCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (14)
  13. Select the inverter
    Choose the inverter. You can add more than one inverterCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (15)
  14. Add a name for the inverter
    This name can be changed by the customer after provisioningCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (16)
  15. Start provisioning
    Select the number of phases and choose the smart meter and the inverter or inverters if there are multiple inverters. Click “Next”CSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (17)
  16. If prompted, enter the Installer Code
    Type “VOLT” and click save and continue. Provisioning will commence automatically. This takes about 5 minutes an involves connecting to the network operator’s CSIP-AUS serverCSIP-AUS-CSIP-AUS-Provisioning-for-Voltello-Link-App-FIG (18)

Questions?

If anything in this guide is not clear, or you have questions, you can contact our Support Desk by selecting Menu > Support in the Voltello app

Documents / Resources

voltello CSIP-AUS CSIP-AUS Provisioning for Voltello Link App [pdf] Installation Guide
CSIP-AUS CSIP-AUS Provisioning for Voltello Link App, Provisioning for Voltello Link App, Voltello Link App, Link App

References

Leave a comment

Your email address will not be published. Required fields are marked *