Installation and finishing

1.1 General information

Uponor M-XS Combi Port - Symbol 2 Warning!
Risk of electric shock if touching the components! The unit operates with a 230 V AC voltage.
Uponor M-XS Combi Port - Symbol 2 Warning!
Risk of electrical shock! Electrical installation and service behind secured 230 V AC covers must be carried out under the supervision of a qualified electrician.
Uponor M-XS Combi Port - Symbol 2 Warning!
Uponor system power supply: 230 V AC, 50 Hz.
In case of emergency, immediately disconnect the power.
Uponor M-XS Combi Port - Symbol 2 Warning!
Prior to any work on the controller or the components connected to it, switch off the controller according to the regulations.
Uponor M-XS Combi Port - Symbol 2 Warning!
The fittings are under pressure. Escaping pressurized media can cause serious injury such as scalding or eye damage.
Depressurise the system before performing any installation work.
For retrofits to an existing system:
Drain the system or close the supply lines of the section and depressurise it.
Uponor M-XS Combi Port - Symbol 2 Warning!
Risk of injury due to the heavy weight of the unit:
Do not perform the installation alone.
Always wear safety shoes during the assembly. The unit can be of considerable weight, depending on the configuration. If the station falls over, this could lead to injuries, particularly to the feet.
warning 2 Caution!
Leaks in the unit may occur during transport or installation. Check the nuts to ensure that they are properly tightened before the connection to avoid property damages.

Before installing the heat interface unit ensure that:

  • the primary pipes are laid in the building site.
  • the primary pipe installation is flushed and checked for leaks.
  • the power and ground cables are routed to the installation site.
  • the unit can be installed in a dry and frost-free room with an ambient temperature lower than +40 °C.
  • the unit can be installed upright (not inclined, upside down or lying down).
  • the unit is always easy to access even after the assembly.

Related illustrations

Uponor M-XS Combi Port - Symbol 3

Illustrations related to the different sections below are available in the end of this document.

1.2 Heat interface unit
Uponor M-XS Combi Port - Symbol 4 Note
See the dimensional drawings for measurements. All dimensions are given in mm.

  1. Mark where to drill the holes.
  2. Drill the holes.
  3. Fix the HIU to the wall using the provided material.

1.3 Components
Cold water meter/ Heat meter distance piece

Uponor M-XS Combi Port - Symbol 4 Note
The distance pieces are not suitable for continuous operation.

Item  Description
A Cold water meter distance piece
 B Heat meter distance piece

Strainer
warning 2 Caution!
Shut off the water supply to the unit and relieve the pressure before any work with the strainer.
The strainer collects dirt and its filter can be removed for inspection and cleaning.

1.4 Hydraulic installation

Uponor M-XS Combi Port - Symbol 2 Warning!
Leaks can cause personal injury and property damages.
Uponor M-XS Combi Port - Symbol 4 Note
Install the pipes in accordance with the planning documentation.
Connect the primary supply lines with the corresponding ¾” ball valves at the HIU.

1.5 Electrical installation

Uponor M-XS Combi Port - Symbol 2 Warning!
Required work must be performed by a qualified installer in accordance with local regulations. This includes electrical connections and installations, set up for operation and maintenance.
Uponor M-XS Combi Port - Symbol 2 Warning!
Establish equipotential bonding by using a copper equipotential bonding conductor (cross-section at least 6 mm²). Connect the earthling clamp to a suitable equipotential bonding rail in the building.

1.6 Filling and flushing
Fill and flush the system according to local regulations and standards.
1.7 Tightness testing

Uponor M-XS Combi Port - Symbol 2 Warning!
Leaks can cause personal injury and property damages.
warning 2 Caution!
Pressure leaks may occur even at normal operating pressure and must be repaired immediately.
Uponor M-XS Combi Port - Symbol 5 Minimum 2 hours
Uponor M-XS Combi Port - Symbol 6 According to local standards and regulations

1.8 Finishing the installation and hand over

warning 2 Caution!
Incorrect finishing of the installation can lead to property damage.

Follow these steps and finish the installation:

  1. Check the settings.
  2. Complete the acceptance/ finishing protocol.
  3. Hand over the documentation and the protocol to the homeowner.

Uponor M-XS Combi Port - Fig 1Uponor M-XS Combi Port - Fig 2

Uponor logo

Uponor GmbH
Industriestraße 56,
D-97437 Hassfurt, Germany
1143308 v2_03-2024_INT
Production: Uponor/ DCO

Uponor reserves the right to make changes, without prior notification, to the specification of incorporated components in line with its policy of continuous improvement and development.

Uponor M-XS Combi Port - QR Codewww.uponor.com

Documents / Resources

Uponor M-XS Combi Port [pdf] User Guide
XS EN, SD0000126, CD0000512, M-XS Combi Port, M-XS, Combi Port, Port

References

Leave a comment

Your email address will not be published. Required fields are marked *