Unicom installation steps
6299 Folding Container
- Open the box between the Unicom
- Hold the support rod against the frame on the front or rear wall
- The connecting room is opened
- Unicom rooms move closer together
- Put together the Unicom rooms and fold them from the inside first (the position of the folded card is stuck in the gap between the top ceiling tile and the steel)
- Upper front and rear folds (the front and rear folds need to be trimmed with scissors so that they can be easily stuck at the top)
- After all the folded parts are installed, start to glue the joints
- Remember to send foam glue to fill the gaps on the outside of the container, and apply structural glue to seal it. The front and rear walls also apply foam glue first and then apply structural glue.