Learn how to configure and install the Verasys® Equipment Controller (VEC100) using the Verasys generic RTU staged heating and staged cooling controller application with this quick start guide. Discover features such as the number of heating and cooling stages, economizer availability, and demand ventilation. Follow step-by-step instructions for mounting and wiring the VEC100 controller. Get started with LIT-12013486 guide today.
This Verasys VEC100 Generic RTU Heat Pump Controller User Guide provides basic information to install and configure the LC-VEC100-0 controller for third-party COBP or VAV systems. Learn about available options and how to mount and wire the controller using this guide.
Read this quick start guide for the VEC100 Generic RTU Controller, Staged Heating and Modulated Cooling application to learn how to install and configure your Verasys equipment. This guide includes details on the features and wiring instructions for the LC-VEC100-0 controller, which can be used with third-party changeover bypass or VAV units.
This quick start guide explains how to install and configure the Verasys® Equipment Controller (VEC) using the VEC100 Generic RTU Controller application for modulated heating and staged cooling. Learn about available options, mounting and wiring instructions, and where to find additional information. Model numbers mentioned include LC-VEC100-0 and LIT-12013360.