LSP L2R63 Series Automatic Transfer Switch Installation Guide

L2R63 Series Automatic Transfer Switch

Specifications:

  • Dimensions: 82.5mm (4P) x 50.5mm (2P)
  • Weight: 130g
  • Wiring Stripping Length: 12mm
  • Push-in Wiring Stripping Length: 13mm

Product Usage Instructions:

Installation:

DIN Rail Installation:

  1. Insert the upper end of the ATS base into the DIN rail.
  2. Push the lower end of the ATS base into the DIN rail until the
    snap fastener locks securely.

DIN Rail Disassembly:

  1. Insert a screwdriver into the round hole of the DIN rail snap
    fastener at the bottom of the ATS.
  2. Use a screwdriver to pry the DIN rail snap fastener
    downward.
  3. Tilt the ATS upwards and remove it from the DIN rail.

Screw Mounting:

  1. Pull out the upper and lower snap fasteners located at the
    bottom of the ATS.
  2. Secure the ATS to the panel with screws.

Wiring Instructions:

Ensure correct phase sequence when connecting power supply:

  1. Backup power neutral wire
  2. Common power neutral wire
  3. Common power supply
  4. Backup power supply
  5. Load power

FAQ:

Q: What should I do if the indicator lights are flashing?

A: If the indicator lights are flashing, it
indicates abnormal power supply conditions (under voltage or over
voltage state). Check the connections and power input to resolve
the issue.

Q: How can I ensure safe operation of the ATS?

A: Adhering to correct wiring instructions and
following installation guidelines will ensure safe operation of the
ATS.

Q: Where can I find maintenance procedures for the ATS?

A: Maintenance procedures for ensuring safe and
effective functionality of the ATS can be found in the user manual
provided with the product.

“`

Installation Instructions
Automatic Transfer Switch L2R63
Important Notice:
· Please read this manual carefully before installing or operating the product. If you have any questions, please contact our company.
· Unauthorized disassembly of the product is strictly prohibited to prevent instrument failure or malfunctions.

DIN Rail Installation
1. Insert the upper end of the ATS base into the DIN rail. 2. Push the lower end of the ATS base into the DIN rail until the snap fastener locks securely.

1 3

2 2

3

1

DIN Rail Disassembly
1. Insert a screwdriver into the round hole of the DIN rail snap fastener at the bottom of the ATS. 2. Use a screwdriver to pry the DIN rail snap fastener downward. 3. Tilt the ATS upwards and remove it from the DIN rail.

Screw Mounting
1. Pull out the upper and lower snap fasteners located at the bottom of the ATS. 2. Secure the ATS to the panel with screws.
2.5 Nm
12 mm

7.4 mm

wire L

Push-in wiring Stripping length
12 mm L 13 mm

Wiring
1. The ATS is equipped with screw-type terminals, each with a width of 7.4 mm, suitable for copper wires with a cross-sectional area of 1 to 16 mm². 2. When wiring, strip the wire to a length of 12 to 13 mm; it is recomm ended to use a duckbill-shaped terminal for secure connection. 3. Tighten the screws with a recommended torque of 2.5 Nm to ensure proper tightening without damaging the terminals.

Wiring Instructions
1 2 3 4 5

8

NOTE:

9

The input power

supply must be

connected in the

correct phase

sequence

10

11

6

7

12

1

Backup power neutral wire

2

Common power neutral wire

3

Common power supply

4

Backup power supply

5 Load power

6

Load output neutral wire

7 Din-Rail buckle

8

Backup power live wire

9

Common power live wire

10

Closing indication (Green: ON, Red: OFF)

11

Manual operation handle

12

Load output live wire

Common power supply
When the power supply is abnormal (under voltage or over voltage state) Flashing indicator light

Backup power supply
When the power supply is abnormal (under voltage or over voltage state) Flashing indicator light

Dimensions

82.5 (4P) 50.5 (2P)

[mm]

130 116.2 108

122.5

78 70 59

41.2

3.5

94 45

35

Important Notes
· The input power supply must be connected in the correct phase sequence. · Avoid using single-pole breakers for neutral/live control lines. · Switch neutral and live lines simultaneously to prevent malfunctions. · Prefer automatic mode for reliability; excessive manual use can cause contact wear. · Switch to manual mode only after power disconnection for maintenance. · Keep in automatic position normally; return to it after manual use. · For dual-power ATS, minimize switching and allow at least 1 minute between tests. · Only qualified personnel should operate the ATS while powered.
Working Conditions
· Altitude: Up to 2000 meters · Operating Temperature Range: -5°C to +40°C (24-hour average must not exceed +35°C) · Storage Temperature Range: -25°C to +55°C (transient peaks up to +70°C) · Operating Humidity: Up to 50% at +40°C; up to 90% at -5°C (condensation prevention required) · Contamination Level: Level 3 · Protection Rating: IP30 · Overvoltage Category: Category III (main circuit), Category II (control/auxil iary circuits) · Mounting Orientation: The ATS can be installed vertically or horizontally in cabinets. For specific installation requirements, please get in touch with us.

Cautions
· Professional Installation: Only qualified professionals should install and commission the Automatic Transfer Switch (ATS). · Installation Environment: Install the ATS on a clean, dry surface with adequate airflow. · Electrical Connections: Ensure all connections are secure to prevent overheating and fire hazards. · Avoid Neutral-Ground Bonding: Do not connect the neutral line to the grounding system, as this can create hazards. · Follow Local Regulations: Ensure compliance with applicable local electrical codes for safety and reliability.
Adhering to these guidelines ensures the safe operation of the ATS.
Maintenance
· Professional Inspection: Engage qualified personnel to regularly inspect the ATS, verifying proper operation. · Routine Cleaning: Periodically remove dust and debris to ensure optimal performance. · Electrical Contact Check: Inspect electrical contacts for wear or damage and tighten any loose connections to maintain reliable operation. · Humidity Control: Maintain a dry environment to prevent moisture-related malfunctions. · Insulation Testing: Routinely test insulation resistance to verify adherence to safety standards. · Proper Storage: Store the ATS in a protected environment, shielded from dust, humidity, and physical harm when not in use.
Adhering to these refined maintenance procedures ensures the safe and effective functionality of ATS.

Easy Installation Instructions
PV panel

Battery packs

Combiner box

Inverter

2-way photovoltaic input to inverter

Inverter AC output

Load

Automatic Transfer Switch
Power grid

Output to load

Wenzhou Arrester Electric Co., Ltd.
5th FL, Bldg 2, No. 888 Liujiang Road, Liushi, Yueqing 325604 Zhejiang, China Email: sales@lsp.global Website: https://lsp.global

Documents / Resources

LSP L2R63 Series Automatic Transfer Switch [pdf] Installation Guide
L2R63, L2R63 Series Automatic Transfer Switch, L2R63 Series, Automatic Transfer Switch, Transfer Switch, Switch

References

Leave a comment

Your email address will not be published. Required fields are marked *