LANGER-logo

LANGER E1 Set Immunity Development System

LANGER-E1-Set-Immunity-Development-System

Short description

The E1 is a set of EMC tools used for EMI suppression in printed circuit boards during the development phase. The developer can use the E1 set to quickly identify the causes ofburst and ESD interference. This allows the developer to design suitable measures to solve the causes of the interference. It can also be used to test the effectiveness ofthe measures taken. The E1 test set-up is small and fits easily on a developer’s desk. The E1 set user manual describes EMC mechanisms and provides detailed descriptions of basic measuring strategies for interference suppression in printed circuit boards. The E1 set includes a generator to generate burst and ESD disturbances.

Scope of delivery

  • 1x SGZ 21, Burst Generator
  • 1x BS 02, Magnetic Field Source
  • 1x BS 05D, Magnetic Field Source
  • 1x ES 00, E-Field Source
  • 1x ES 02, E-Field Source
  • 1x ES 08D, E-Field Source
  • 1x E1 acc, Accessories
  • 1x E1 case, System Case
  • 1x S21, Optical Sensor (10 Mbps)
  • 1x BS 04DB, Magnetic Field Source
  • 1x BS 05DU, Magnetic Field Source
  • 1x ES 01, E-Field Source
  • 1x ES 05D, E-Field Source
  • 1x MS 02, Magnetic Field Probe
  • 1x NT FRI EU, Power Supply Unit
  • 1x E1 m, E1 Set User Manual

Technical parameters

S21 optical sensor  
Transmission range DC…10 Mbps
Optical fibre connector 2.2 mm Ø
Supply voltage (3-5) V
Current input 10 mA
SGZ 21 burst Generator  
Pulse parameter  
Rise time ca. 2 ns
Tail time ca. 10 ns
Peak values ca. 0…1500 V
Optical input  
Optical fiber 2.2 mm
Max. frequency 5 MHz
Min. pulse width 100 ns
Supply voltage 12 V / 200 mA
Sizes (L x W x H) (154 x 100 x 62) mm

Measuring principles

LANGER-E1-Set-Immunity-Development-System-fig-1

Application with BS 04 DB

LANGER-E1-Set-Immunity-Development-System-fig-2

Scope of delivery E1

LANGER-E1-Set-Immunity-Development-System-fig-3

Exploded view drawing E1

LANGER-E1-Set-Immunity-Development-System-fig-4

Application with MSA 02 magnetic field probe from the S2 set

LANGER-E1-Set-Immunity-Development-System-fig-5

Langer EMV-Technik GmbH
www.langer-emv.com
+49 351 430093 0
sales@langer-emv.de

Documents / Resources

LANGER E1 Set Immunity Development System [pdf] Installation Guide
SGZ 21, BS 02, BS 05D, ES 00, ES 02, ES 08D, S21, BS 04DB, BS 05DU, ES 01, ES 05D, MS 02, NT FRI EU, E1 Set Immunity Development System, E1 Set, Immunity Development System, Development System

References

Leave a comment

Your email address will not be published. Required fields are marked *