Product Information

Specifications

  • Product Name: FusionSolar Smart PV Residential Solution
  • Components: Three-phase PV system, LUNA2000 inverter, Smart Dongle Networking
  • Cable Type: Outdoor shielded twisted pair cables

Product Usage Instructions

Wiring Guidelines
Before connecting cables, ensure all switches are OFF to prevent electric shocks. Follow the wiring diagram for proper connection.

Connection Steps

  1. Connect signal cables using shielded twisted pair cables.
  2. Connect to Slave inverter 1-COM-pin 2 and Slave inverter 1-COM-pin 4 for initial setup.
  3. Connect to ESS 1-COM-pin 4, DTSU666-H-COM-pin 24, and ESS 1-COM-pin 7 for additional connections.
  4. Ensure consistent wiring sequence for the Backup box and inverter AC terminals.

Cable Connection
Connect DC power cables, AC power cables, and signal cables as per the designated ports and components mentioned in the wiring diagram.

Additional Notes

  • Ensure proper grounding by connecting shield layers as indicated in the diagram.
  • Refer to the connection method for the master inverter when connecting cables to slave inverters.

Solution Wiring Diagram

DANGER
Before connecting cables, ensure that all switches are OFF. Otherwise, electric shocks may occur.

NOTICE
Signal cables must be outdoor shielded twisted pair cables.

The wiring sequence of the Backup box must be consistent with that of the inverter AC terminals.

Connect other cables to slave inverters by referring to the connection method for the master inverter.

HUAWEI-Three-Phase-PV+LUNA2000+Smart-Dongle-Networking-1

Cable Type. No. One End The Other End
Component Port Port Component
 

 

DC

power cable

Master inverter PV1+ Positive terminal PV

strings

PV1- Negative terminal
Master inverter BAT+ BAT+  

ESS 1

BAT- BAT-
ESS 1 BAT+ BAT+ ESS 2
BAT- BAT-
 

 

 

 

Signal cable

 

 

 

 

Master inverter

 

 

COM

COM (right) ESS 1
COM Slave inverter 1
RS485 DTSU666-H
X4 Backup box
ESS 2 COM (right) COM (left) ESS 1
Slave inverter 1 COM-1 COM-2 Slave inverter 2
COM-3 COM-4
 

 

AC

power cable

 

 

 

 

Master inverter

AC-L1 X3-1 (L1)  

 

Backup box

AC-L2 X3-3 (L2)
AC-L3 X3-5 (L3)
AC-N X3-8 (N)
AC-PE X3-12 (PE)
 

 

 

 

 

 

 

 

 

 

 

AC

power cable

Backup load power distribution

box

L X1-1  

Backup box

N X1-2
PE X1-4
 

 

 

AC power distribution box

L1 X2-1  

 

Backup box

L2 X2-2
L3 X2-3
N X2-4
PE X2-6
 

AC power distribution box

L1 3  

 

DTSU666-H

L2 6
L3 9
N 10
 

 

 

 

AC power distribution box

 

L1

13  

 

 

DTSU666-H CT

14
L2 16
17
L3 19
21

FAQ

What type of cables should be used for the connections?

Signal cables must be outdoor shielded twisted pair cables for proper functioning and safety.

How should I connect the Backup box to the inverter AC terminals?

The wiring sequence of the Backup box must match that of the inverter AC terminals to ensure correct connection.

What precautions should I take before connecting cables?

Make sure all switches are OFF to prevent electric shocks while connecting the cables.

Documents / Resources

HUAWEI Three Phase PV+LUNA2000+Smart Dongle Networking [pdf] User Guide
EL, LUNA2000, Smart Dongle, Three Phase PV LUNA2000 Smart Dongle Networking, PV LUNA2000 Smart Dongle Networking, Dongle Networking, Networking

References

Leave a comment

Your email address will not be published. Required fields are marked *