sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Featured ImageTRACK 1020 Tracking Solution to Streamline Logistics Processes
Installation Guide
sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes

How to install the tracker

Install with rivetssensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Install with rivetsRivets are advised are they are more secure and tamper proof.
The height of the casing where the mounting holes are located is 8mm.
We recommend Gesipa Blind Rivets Aluminium/Steel Standard Flat Head 5 x 16 mm.
Install with bolts 
sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Install with bolts

  1. It is recommended to use M5 bolts and to use thread locking glue on the bolts. We recommend Loctite Thread Locker Blue 242.
  2. Protect the casing with a washer and use a spring washer to mitigate the effects of vibration and temperature variations.
  3.  The maximum allowed torque is 3.5NM for an M5 x 12 mm screw used with a washer. Applying more torque may severely damage the tracker’s casing.

Installation advice

sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation adviceThe recommended orientation is vertical (upright) with the arrows on the sticker pointing upwards.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 1The second best orientation is horizontal (sideways).
sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 2Do not mount the tracker upside down, with the sticker on top.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 2Do not mount the tracker horizontally, facing upwards.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 2Avoid blocking the tracker’s view with metal or carbonfibre walls. They weaken or block the radiofrequency signals.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 2Place the tracker as high as possible on the asset to ensure good network coverage.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 6Make sure the mounting surface is flat and clean, for a strong and durable bond and to secure the tamper function will work.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 6Do not install the tracker on parts that receive frequent shocks or vibrations.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 8You can place the tracker in a protected location, but never with metal or carbonfibre above the tracker.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 8Make sure the tracker has a clear view on the sky.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 10Avoid placing the tracker in a place that can collect water.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 11Do not mount on round surfaces, this will impact the tamper functionality.

Tracker activation
Paulmann Ceiling Lighting Accessories - Icon 1 Activation of the trackers is preferably done with clear skies, and not inside (e.g. factory or warehouse). Trackers are not activated when delivered to your premises.
Their subscription in the platform will start within six month of purchase. We offer 2 ways to activate the tracker. Magnet activation or tamper button activation.
Magnet activationsensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 11Step 1
Hold a magnet for about 5 seconds on the left of the asset tracker. You will see a red LED. Do not remove the magnet yet.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 11Step 2
When the green LED is blinking you can remove the magnet. Your tracker is ready for use.
Tamper button activation
This type of activation is done automatically when the tracker is installed properly on an flat surface and the tamper button is pressed continuously.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 11Step 1
Press the tamper button and wait 5 seconds. Keep pressing the tamper button.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Installation advice 11Step 2
You will first see a red LED. Keep pressing the tamper button for 55 seconds.sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Tamper buttonStep 3
The green LED starts to blink for a few seconds.
Keep pressing for 60 seconds
Force new configuration download on the tracker when active

sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - fig
Hold a magnet on the left side of the casing for about 5 seconds.
You will see a green LED.
LED is green and red. Remove the magnet. LED blinks green for min 30 seconds.
sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Tamper button
Either you will see a green LED. New configuration received. Or you will see a red LED. No new configuration received.

Get device status

  1. Put the magnet on the left side of the tracker for less than 5 seconds
  2. The possible LED feedback options are:

sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Tamper button(probably dead battery -> contact support)

sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes - Featured ImageSensolus recommends to install the tracker with rivets or bolts.
For alternative fixation methods such as magnets please contact the Ensouls Help Desk.
support@sensolus.com or +32.9.298.09.43
www.sensolus.com
info@sensolus.com

Documents / Resources

sensolus TRACK 1020 Tracking Solution to Streamline Logistics Processes [pdf] Installation Guide
TRACK 1020 Tracking Solution to Streamline Logistics Processes, TRACK 1020, Tracking Solution to Streamline Logistics Processes, Streamline Logistics Processes, Logistics Processes

References

Leave a comment

Your email address will not be published. Required fields are marked *