ROLL-A-SHADE RASCP7DBMVER.2 Contract Plus 7 Dual Bottom Fascia
Specifications
- Product Name: CONTRACT PLUS+ 7 DUAL BOTTOM FASCIA
- Manufacturer: Rollashade.com
- Contact: info@rollashade.com | 951.245.5077
- Hardware Included:
- Bracket Covers
- Motor Bracket
- Motor Bracket Idler End
- #14 Screw Screws
- Shades + Motors
- Fascia
- Zip Ties
- Wire Tie Pads
- Wall Switch
- Switch Box
- Tools Required: 3/8 Hex Head, Phillips Head, 1/8 Drill Bit, Drill
Product Usage Instructions
Inside or Outside Application
- NOTE:
All shades may be pre-programmed to sensors, remotes, and/or wall switches upon arrival. - Outside:
Determine if you want to install the shades on the outside of the window. - Inside:
Determine if you want to install the shades on the inside of the window. - Mounting Location
Place your first bracket in its mounting location and mark the screw holes. Repeat the process for the second bracket.
INSTALLATION INSTRUCTIONS
HARDWARE INCLUDED
TOOLS REQUIRED
INSIDE OR OUTSIDE APPLICATION
**NOTE:
ALL SHADES MAY BE PRE-PROGRAMMED TO SENSORS, REMOTES, AND/OR WALL SWITCHES UPON ARRIVAL**
MOUNTING LOCATION
SCREW INSTALLATION
Next, pre-drill your screw holes using a 1/8” drill bit. Install the brackets with the provided screws using the 1/4” hex head driver.
ALIGNMENT
Check to make sure your brackets are level and aligned.
TOP SHADE PIN END INSTALLATION
Swivel ball bearing to align with idler shaft for easy installation. Press the idler shaft to the bracket.
TOP MOTOR END INSTALLATION
Remove the locking ring. Lineup to the motor bracket. Push the motor into the motor bracket.
TOP LOCK RING INSTALLATION
Add a locking ring to the motor bracket. Check the motor is secured correctly.
BOTTOM SHADE PIN END INSTALLATION
Swivel ball bearing to align with idler shaft for easy installation. Press the idler shaft to the bracket.
BOTTOM MOTOR END INSTALLATION
Remove the locking ring. Lineup to the motor bracket. Push the motor into the motor bracket.
BOTTOM LOCK RING & FASCIA INSTALLATION
Add a locking ring to the motor bracket. Check the motor is secured correctly. Install bottom fascia.
PLUG IN MOTOR
- Run the motor power cord to the nearest power outlet.
- Install wire tie pads and secure them with zip ties to hold the wire down.
- The path of the wire should be parallel with mullions and/or drop ceiling tiles ensuring the cable is neatly organized.
- Any modifications to the power cable should be done by a certified electrician to meet your city/state code requirements.
SHADE ADJUSTING (IF NECESSARY)
- Roll shade up and down to confirm the hembar is level and the material rolls up straight on the center tube.
- If the member is not level, lower the shade until you see the metal tube.
- Add layers of masking tape to the metal tube to the end that is too low until the member is straight.
- If the material tracks to one side, lower the shade until you see the metal tube.
- Add layers of masking tape to the metal tube to the end that is opposite the direction of tracking, until the shade rolls up straight.
ADJUSTING LIMITS (IF NECESSARY)
See programming instructions based on the motor used for your application.
- RASCP7DBMVER.2 6 OF 6
- © Copyright Roll A Shade® Inc. All Rights Reserved.
- Rollashade.com
- info@rollashade.com
- 951.245.5077
FAQS
- Q: How do I adjust the shade if it doesn’t roll up straight?
A: You can adjust the shade by gently guiding it in the direction of tracking until it rolls up straight. - Q: What should I do if I need to adjust the limits of the shade?
A: Please refer to the programming instructions specific to the motor used for your application to adjust the limits of the shade.
Documents / Resources
![]() |
ROLL-A-SHADE RASCP7DBMVER.2 Contract Plus 7 Dual Bottom Fascia [pdf] Installation Guide RASCP7DBMVER.2 Contract Plus 7 Dual Bottom Fascia, RASCP7DBMVER.2, Contract Plus 7 Dual Bottom Fascia, Dual Bottom Fascia, Bottom Fascia, Fascia |