Prolight SP-839 Empty Pack Downlight
Prolight Installation Guide
Specifications
Model | 321881194 – 321881195 |
---|---|
Protection | IP20 |
Voltage | 230V |
Installation Steps
Step 1: Turn Off Power
Ensure the power is turned off before beginning installation. Use the circuit breaker to switch off the power supply.
Step 2: Prepare the Ceiling
Ensure a minimum distance of 150mm from the ceiling. The hole diameter should be 85mm.
Step 3: Insert the Fixture
Insert the light fixture into the ceiling hole, ensuring it is properly aligned.
Step 4: Secure the Fixture
Rotate the fixture clockwise to secure it in place.
Step 5: Final Adjustments
Make any necessary adjustments to ensure the fixture is flush with the ceiling.
Step 6: Turn On Power
Once installation is complete, turn the power back on using the circuit breaker.
Contact Information
Prolight, Pachtgoedstraat 2, 9140 Temse, Belgium
FAQ
- What is the required hole size for installation?
- The required hole diameter is 85mm.
- What is the minimum distance required from the ceiling?
- A minimum distance of 150mm is required from the ceiling.
- What should I do if the fixture is not secure?
- Ensure the fixture is rotated clockwise until it is securely in place.
Documents / Resources
![]() |
Prolight SP-839 Empty Pack Downlight [pdf] Installation Guide SP-839, SP-839 Empty Pack Downlight, Empty Pack Downlight, Pack Downlight, Downlight |