PowerPlus Energy SPMC481 Off Grid Containerised System User Manual
PowerPlus Energy SPMC481 Off Grid Containerised System

Sending out BESS systems for remote communications site with PowerPlus Energy Batteries on board.

This containerised Battery Energy Storage System (BESS) is designed to provide immediate backup power to a remote communication sites.

Installation Instruction
Installation Instruction
Installation Instruction

Installer
Apex Energy Australia

Location
Remote Communications Site, South Australia Application Off- Grid

System Size
4.1kW Solar PV 24.0kWh Battery Storage Three Phase 35kVA 3Phase Diesel Generator

Battery storage
6 x ECO4840P 48VDC 4.0kWh LFP Battery Modules

Solar panels
10 x Canadian Solar 410W Solar Modules

Inverters
3 x Selectronic SP PRO SPMC481 5.0kW Battery Inverter 1 x Fronius 3Phase Symo 5.0kW Solar Inverters

Tel: +61 3 8797 5557
Email: info@powerplus-energy.com.au
Address: 2 Koornang Road Scoresby, VIC 3179
Web: owerplusenergy.com.au

Documents / Resources

PowerPlus Energy SPMC481 Off Grid Containerised System [pdf] User Manual
ECO4840P, SPMC481, Symo 5.0kW, SPMC481 Off Grid Containerised System, SPMC481, Off Grid Containerised System, Off Grid Containerised System, Grid Containerised System, Containerised System

References

Leave a comment

Your email address will not be published. Required fields are marked *