PANDUIT logo

FlexFusion Top Hat Fascia Kit
Part Number(s) : XG-TCF6B, XG-TCF6W, XG-TCF7B, XG-TCF7W,
XG-TCF8B, XG-TCF8W

PANDUIT XG-TCF6B FlexFusion Cabinet Top Cable Routing System

© Panduit Corp. 2022
INSTALLATION INSTRUCTIONS
V00029WO
Tool List PANDUIT XG-TCF6B FlexFusion Cabinet Top Cable Routing System - Symbol 1

Components Included

PANDUIT XG-TCF6B FlexFusion Cabinet Top Cable Routing System - Components Included

Remove existing screws from Top Cap

  • Remove (4) M5 x 7 Screws from corners of Top Cap.

PANDUIT XG-TCF6B FlexFusion Cabinet Top Cable Routing System - from Top Cap

Install Front and Rear Fascia Plate

  • Secure Front Fascia Plate to cabinet using (4) M5 x 12 screws provided with kit
  • Repeat step on opposite side for rear fascia plate

PANDUIT XG-TCF6B FlexFusion Cabinet Top Cable Routing System - Install Front and Rear Fascia Plate

PANDUIT logowww.panduit.com
For Instructions in Local Languages
and Technical Support: www.panduit.com
E-mail: techsupport@panduit.com
Phone: 866-405-6654

Documents / Resources

PANDUIT XG-TCF6B FlexFusion Cabinet Top Cable Routing System [pdf] Installation Guide
XG-TCF6B, XG-TCF6W, XG-TCF7B, XG-TCF7W, XG-TCF8B, XG-TCF8W, XG-TCF6B FlexFusion Cabinet Top Cable Routing System, FlexFusion Cabinet Top Cable Routing System, Cabinet Top Cable Routing System, Top Cable Routing System, Cable Routing System, Routing System, System

References

Leave a comment

Your email address will not be published. Required fields are marked *