WATERLESS WG2A Smart Logic Controller

Zambiri Zamalonda
Zofotokozera
- Chitsanzo: Smart Logic Controller
- Ntchito: PLC Ntchito & Sequences
- Wopanga: Total Green Mfg.
- Kuwongolera: PLC yoyendetsedwa
- Stagndi: 2stage ndi mayunitsi ambiri
- Kugwirizana: Imagwira ntchito ndi ma thermostats osiyanasiyana otentha / ozizira
Chodzikanira
Proper installation and servicing of the Total Green Mfg. Heat Pump is essential to its reliable performance. All Total Green Mfg. systems must be installed and serviced by a qualified HVAC contractor. Equipment sizing, selection and installation are the sole responsibility of the installing contractor.
Installations of equipment on an existing copper earth loop design that does not match a current Total Green Mfg. earth loop design is not permitted, will void all warranties on the equipment, and are the sole responsibility of the installing contractor. Installation must be made in accordance with the instructions set forth in this manual. Failure to provide installation by a qualified HVAC contractor in a manner consistent with this manual will void and nullify the limited warranty coverage for the system.
Total Green Mfg sadzakhala ndi mlandu wa vuto lililonse, kusagwira bwino ntchito, kuwonongeka kapena kutayika, kaya mwachindunji kapena chifukwa, pokhudzana ndi mapangidwe, kupanga, kumanga, kugwiritsa ntchito kapena kuyika magawo aliwonse omwe atchulidwa.
Zonse Zobiriwira Zobiriwira Mfg. 2stage ndi mayunitsi ogwiritsira ntchito zambiri adzakhala ndi zingwe zosiyanitsira zolembedwa kuti "thermostat/zone board" ndi "air handle/ng'avu" yamagetsi otsika.tage ndi PLC "olamulidwa.
Kuti zida zizigwira ntchito moyenera, chotenthetsera chotenthetsera kapena bolodi ya zone iyenera kumangirizidwa ku “thermostat/zone board terminal terminal”. Chogwirizira mpweya kapena ng'anjo iyenera kumangirizidwa ku "mpweya wowongolera mpweya / ng'anjo". Padzakhalanso mikwingwirima yowonjezereka ya ntchito zosiyanasiyana kutengera mtundu womwe mungakhale mukugwira nawo ntchito. Zomwe zaperekedwa apa ndikuwonjezera buku loyika pagawo lanu.
ZOFUNIKA: For WG2A, WG1AH, WG2AH and WG2AD unit’s, if using a cased coil over a furnace, do NOT program your thermostat for dual fuel mode or, use the furnace settings. Leave the thermostat set to electric aux. heat, otherwise, you may interfere with proper PLC function. Follow the dual fuel function option for the unit model you are installing. This information is detailed in your unit installation manual. You will also want to check the aux. heat cycle rate (CPH) setting in the thermostat and set this to 1 or, the lowest available value depending on your thermostat brand and model.
Smart Logic Controller
WG2A Forced Air Only– List of functions
- The PLC checks that the LOW/HIGH pressure and discharge temperature switches are made. An open pressure switch input has a 60 second delay before setting a lockout and fault signal to
“X”. During this 60 second time period, the compressor will only operate in 1st stage kungopatsa dongosolo mwayi wochira musanakhazikitse loko yolimba. Izi ndi zopewera kuyitana kwazovuta, makamaka kumayambiriro kwa nyengo yozizira pamene Earth Loops imakhala yozizira kwambiri. "X" imayikidwa ndi vuto lililonse lotsekera. Kutembenuza voltage ku kompresa unit kuzimitsa kenako ndikukhazikitsanso zotsekera bola ngati chosinthira kutentha sichinatseguke. Kusintha kwa kutentha kwa kutulutsa kumakhala ndi batani lokonzanso pamanja. Kusintha kwa kutentha kotsegula kumafunika nthawi zonse kukonzanso pamanja pamodzi ndi mphamvu yotsikatage mphamvu kuzungulira. Makasinthidwe amphamvu amangochitika zokha. - A “Y1” call starts 1st stage Kutentha kapena kuziziritsa komwe kupitirire kwa mphindi 20 kenako nthawi mpaka 2nd stagnthawi ikadutsa popanda chotenthetsera kuyitana "Y2". Ngati unit ili mu Kutentha mode, kamodzi 2 stage ikayamba, chowerengera cha mphindi 20 chidzabweretsa kutentha kwa AUX ngati nthawiyo itatha osakhutiritsa kuyimba kotentha. Kamodzi zonse stages ayitanidwa, azikhala oyitanidwa mpaka thermostat ikwaniritsidwe.
- If more than 3 consecutive “Y1” calls take place without the thermostat calling for 2nd stage mkati mwa mphindi 20 kapena, isanafike mphindi 20 2 stage timer itatha, pa kuyimba kwachinayi kwa "Y1", kuzungulira kumayambika komwe kumagwira ndikutseka dongosolo mu 2nd s.tage kwa mphindi 5 kutsimikizira mafuta kubwerera kwa kompresa. Ngati makinawo ali ndi mpweya, choyimira cha Zone Override "D" chidzapatsa mphamvu ku 24 volts. Monga tafotokozera m'mawu anu oyika ma unit, siginecha ya 24-volt iyi itha kugwiritsidwa ntchito limodzi ndi gawo lopatsirana lodzipatula kuti mutsegule chigawo chachikulu kwambiri ndikusunga d.amptsegulani kuti chowuziracho chisawone kuthamanga kwambiri panthawi ya mphindi zisanu. Kukonzekera kumatseka kuyitana kwina kulikonse mpaka kutha. Pambuyo pokonza, kapena ngati kuyimba kwa "Y5" kuyimba nthawi yokonza isanachitike, kauntala imabwereranso ku ziro. Izi zimapangitsa makina athu kukhala ochezeka monga momwe amaloleza zenizeni 2 stagKutentha ndi kuziziritsa.
- There is an installed jumper on the field wiring terminal block marked “A” and “S”. With the jumper installed, the unit will function with an aux heat strip as normal. If the jumper is removed, the PLC goes into dual fuel mode stopping the compressor when there is a call for aux heat. Once the aux heat call completes, a 5-minute cool down timer prevents the compressor from restarting on a “Y” call until the time elapses. This allows time for the furnace to cool so hot air doesn’t cause high discharge pressure or a lockout when the compressor restarts.
- When the thermostat is set to cooling mode, the “O” signal energizes the reversing valve and locks out the aux heat output.
- In an effort the reduce energy consumption, the PLC turns power off to the crank case heater when the compressor runs.
- This PLC program also allows the use of almost any heat/cool thermostat. Even if a single stage heat/cool thermostat yokhayo imagwiritsidwa ntchito, pulogalamu ya PLC idzawongolera ntchito zonse stagndi 2 stage ndi AUX Kutentha ngati pakufunika.
WGxAH Single ndi Awiri Stage Forced Air yokhala ndi Hydronic Heating Function
In addition to the function and features as described for WG2A units, The PLC program for the WGxAH units allows for switching priority call from forced air to hydronic heating as well as a feature
called “Split Zone” that are installer optioned by choosing jumper settings as described below.
- A jumper is used on the field wiring terminal strip between the “R” and “AW” terminals to prioritize air heating over hydronic heating. When this jumper is removed, hydronic heating becomes the priority call.
- Split Zone is a feature which allows you the ability to heat one zone or floor with hydronic heat and another zone or floor with forced air. Split Zone is active by removing the priority call jumper across “R” and “AW” moving it across the “R” and “SZ” of the field wiring terminal block.
- While in “Split Zone” mode, the compressor unit will provided forced air heating to the air zone. When the buffer storage tank calls for heat, the compressor unit will shift to heat water. Should a call for the air zone take place while the compressor unit is heating water, the call goes directly to the aux heat source to maintain the air zone. Once the tank temperature is satisfied, the system diverts back to normal air heating with the compressor unit.
- When a hydronic heat call from the buffer tank takes place, the compressor turns off if it is running. 1 minute after that, the circulator pump starts to establish good water flow, the 3 way valve energizes and the SV1 valve de-energizes. 1 minute after that the compressor starts. Once the tank thermostat is satisfied, the compressor stops and the pump will continue to run for 30 seconds before turning off to gain any residual heat from the heat exchanger. 1 minute after the compressor stops, the 3-way valve de-energizes. 1 minute after that the compressor can restart for an air zone call. These timed cycles reduce system component wear by not having to shift under pressure or load.
- The Hydronic heating function is disabled anytime the “O’ terminal is energized placing the unit in cooling mode.
WG2AD Yokakamiza Mpweya wokhala ndi Ntchito Yotenthetsera Madzi Pakhomo
Kuphatikiza pa ntchito ndi mawonekedwe monga momwe zafotokozedwera mayunitsi a WG2A monga momwe tafotokozera m'gawo loyamba lachikalatachi, pulogalamu ya PLC ya mayunitsi a WG2AD imalola kusintha kuyimba koyambira kuchokera ku mpweya wokakamizidwa kupita ku kutentha kwamadzi apanyumba.
- A jumper is used on the field wiring terminal strip between the “R” and “AW” terminals to prioritize air heating/cooling over domestic water heating. When this jumper is removed, domestic water heating becomes the priority call.
- When a water heating call from the water tank takes place, the compressor turns off if it is running. 1 minute after that, the circulator pump starts to establish good water flow, the 3 way valve energizes and the SV1 valve de-energizes. 1 minute after that the compressor starts. Once the tank thermostat is satisfied, the compressor stops and the pump will continue to run for 30 seconds before turning off to gain any residual heat from the heat exchanger. 1 minute after the compressor stops, the 3-way valve de-energizes. 1 minute after that the compressor can restart for an air zone call. These timed cycles reduce system component wear by not having to shift under pressure or load.
- An added functional PLC feature exclusive to the WG2AD model which allows water heating up 120 degrees, is the unit’s ability to maintain compressor stability by throttling the compressor load as needed to control discharge pressure.
WG1H 100% Hydronic Heated and Chilled Water Only– List of functions
- The PLC checks that the LOW/HIGH pressure, HX Low and Discharge temperature switches are made. An open safety switch input has a 60 second delay before setting a lockout and fault signal to “X”. This is to prevent nuisance calls, especially at the beginning of the cooling season when the Earth Loops are at their coldest. “X” is set with any hard lockout condition. Turning the low voltage ku kompresa unit kuzimitsa kenako ndikukhazikitsanso zotsekera bola ngati chosinthira kutentha sichinatseguke. Kusintha kwa kutentha kwa kutulutsa kumakhala ndi batani lokonzanso pamanja. Kusintha kwa kutentha kotsegula kumafunika nthawi zonse kukonzanso pamanja pamodzi ndi mphamvu yotsikatage mphamvu kuzungulira. Kuthamanga ndi HX Low kutentha masiwichi ndi basi.
- An “N” call starts the circulator pump for 30 seconds prior to the compressor to allow for full flow through the HX (heat exchanger) prior to starting the compressor. Once the call is complete, the pump will run an addition 30 seconds after the compressor stops to purge the HX of any residual heat. This occurs regardless of either a heated or chilled water call.
If you have any questions regarding any of these functions, please contact Total Green Mfg. at 419-678-2032 kwa chithandizo chaukadaulo.
Mafunso Ofunsidwa Kawirikawiri
- Q: Kodi ndimayika bwanji kutentha kwa mpweya kuposa kutentha kwa hydronic mu mayunitsi a WGxAH?
A: Remove the jumper between R and AW terminals on the field wiring terminal strip. - Q: Kodi gawo la Split Zone limagwira ntchito bwanji mu mayunitsi a WGxAH?
A: Move the jumper from R and AW terminals to R and SZ on the field wiring terminal block to activate Split Zone.
Zolemba / Zothandizira
![]() |
WATERLESS WG2A Smart Logic Controller [pdf] Buku la Malangizo WG2A, WG1AH, WG2AH, WG2AD, WG2A Smart Logic Controller, WG2A, Smart Logic Controller, Logic Controller, Controller |
