NGP Logo

5100 Seal for Mullion ApplicationNGP 5100 Seal for Mullion Application

Installation Instructions

  1. Clean mullion surface of all dust, dirt, oil, grease, etc.
  2. Surface temperature of the mullion must be above 50ºF for the adhesive on this seal to bond properly.
  3. Cut the seal to the proper length.
  4. Remove protective backing 1 to 2 feet at a time and adhere the seal to the center of the mullion face that the doors close against.NGP 5100 Seal for Mullion Application - Door
  5. Firmly press down along the entire length of the seal to bond the adhesive to the mullion. DO NOT remove and relocate. DO NOT stretch the seal when installing.
  6. Adjust the position of the RIM Exit Device strikes as required for proper latching of the devices.

NGP 5100 Seal for Mullion Application - LENGTH

NGP 5100 Seal for Mullion Application - Symbol POSITIVE PRESSURE TESTED GASKETING MATERIALS
FOR FIRE DOORS
FOR APPLICATION TO HOLLOW-METAL-TYPE FIRE DOORS
RATED UP TO 3 HOURS AND WOOD-TYPE FIRE DOORS
RATED UP TO 1 1/2 HOURS.
CATEGORY J

NGP Logo8.23
ngp.com
1-800-NGP-RUSH

Documents / Resources

NGP 5100 Seal for Mullion Application [pdf] Installation Guide
5100 Seal for Mullion Application, 5100, Seal for Mullion Application, Mullion Application, Application

References

Leave a comment

Your email address will not be published. Required fields are marked *