MYPV - logoDigital Meter P1 Interface
for AC•THOR / AC•THOR 9s / AC ELWA 2
Quick Start Guide

MYPV AC ELWA 2 Digital Meter P1 Interface -

NOTE: The Digital Meter P1 Interface can be used with AC•THOR from firmware version a0020300 or higher! To install this firmware on already delivered devices, please send us the 16-digit serial number to support@my-pv.com.

Intended Use

The Digital Meter P1 interface is exclusively designed for operation with AC•THOR, AC•THOR 9s or AC ELWA 2. It connects the displayed utility meter with the Modbus  RTU gateway of the my-PV device. Thus the excess power info in a photovoltaic system can be received and used without any additional meter.
The Digital Meter P1 interface will be damaged by any wrong usage.
Before commissioning, it is essential that you read the assembly instructions that accompany the my-PV device, as well as the operation manual available online.
Find the operation manual here.

MYPV AC ELWA 2 Digital Meter P1 Interface - qr MYPV AC ELWA 2 Digital Meter P1 Interface - qr1
https://www.my-pv.com/en/info/downloads?alias=AC%E2%80%A2THOR%20Operation%20manual
https://www.my-pv.com/de/manuals/ac-elwa-2

Scope of delivery

  • Digital Meter P1 Interface
  • 120 Ohm resistor

Warning icon Safety indication

Always comply with local regulations for mounting and connection.
Any damage caused by ignoring the installation and user manual is not covered by the manufacturer’s warranty.

Exemption of Warranty and Liability
Any warranty and Liability is excluded for:

  • Injury to person and/or damage to property caused bunintended use or in disregard of safety-and user instructions
  • Consequential damages
  • Unauthorized modification, disassembling or other conversion of the device.

Assembly

Plug the RJ12 socket of the interface into the right port of the displayed utility meter (P1).
Install a cable with 3 wires (shielded) from the terminal block on the interface to the Modbus RTU gateway on the my-PV device. Maximum cable length is 1,000 m Install the 120 Ohm resistor between A and B at the myPV side of the cable.

MYPV AC ELWA 2 Digital Meter P1 Interface - fig1

Warning icon Use shielded twisted pair wire for communication!

Setting for Communication

Warning icon Check if the data output of the meter data needs to be activated by your grid operator!
At step 3 of the commissioning you have to choose a signal source. Select “Digital Meter P1” at this step.
The signal source can also be adjusted anytime later on the display under “Settings” or on the Web-Interface if the my-PV device has an Ethernet connection with a router.

MYPV AC ELWA 2 Digital Meter P1 Interface - fig2

Troubleshooting

The device does not contain any user serviceable parts.
Call your installer for service.

Disposal of waste

FLEX XFE 7-12 80 Random Orbital Polisher - icon 1 Keep the packaging material or dispose it properly.
Dispose the product at the end of its service life in accordance with the applicable regulatory requirement.

EU Declaration of Conformity

You can find them at any time on www.my-pv.com
Digital Meter P1 Interface Quick Start Guide, 230628

Documents / Resources

MYPV AC ELWA 2 Digital Meter P1 Interface [pdf] User Guide
AC ELWA 2 Digital Meter P1 Interface, AC ELWA 2, Digital Meter P1 Interface, Meter P1 Interface, P1 Interface, Interface

References

Leave a comment

Your email address will not be published. Required fields are marked *