M5 IIoT Sensor Gateway
“
Specifications:
- Model: M5/SOL-SYS
- Power Source: Solar Panel
- Communication: MetronView
- IP Rating: IP67
Product Usage Instructions:
1. Unpack & Open Up the Metron5
Place the unit on a flat surface. Use appropriate tools to
loosen the screws and open the device.
2. Mount the Solar Panel
Mount the solar panel in a location with adequate sunlight and
at the recommended tilt angle.
3. Mount the Metron5
Mount the Metron5 on a flat surface using the pre-drilled holes.
Avoid locations that may interfere with signal reception.
4. Connect the Battery
Ensure correct polarity when connecting the black and red wires
to the battery terminals.
5. Connect the Sensor(s)
Connect the sensors to the specified input channels on the
Metron5, ensuring waterproofing is maintained.
Use the buttons to navigate through the menus, enter PIN, and
transmit data. Follow instructions to view live channel
readings.
7. View Data
Access historical data and unit summary on 2020.metronview.com
using provided login credentials.
8. Programming
Remote programming available via MetronView to change settings.
Contact support for assistance in reconfiguring the device.
FAQ:
Q: What should I do if the unit fails during mid-Winter?
A: Ensure the solar panel is mounted correctly. If needed,
consider adding a second solar panel.
Q: How can I contact support for assistance?
A: Contact PowTechnology support via phone at +44 (0) 1827
310666 or email at support@powtechnology.com.
“`
EASY INSTALL GUIDE: M5/SOL-SYS
1 Unpack & Open Up the Metron5
Place unit on a flat surface. To open, loosen the 2 nylon screws in the bottom corners of the Metron5 and 4 screws around battery enclosure. Allen key and Pozi / Phillips head screwdriver required.
2 Mount the Solar Panel
Solar panel comes attached to a mounting bracket. The panel must face directly south and have a view of at least 100° of unobstructed sky. The panel should be tilted at an angle 10° to 15° plus the site’s latitude from the horizontal to achieve maximum sun exposure (example overleaf). The higher the cell, the better.
3 Mount the Metron5
Ideally a flat surface such as a wall/ DIN railing/ Unistrut railing. Avoid mounting inside metal cabinets or underground (could reduce signal). There are pre-drilled holes for easy mounting.
Sunlight
Solar Panel Tilt Angle
Horizontal
4 Connect the Battery
Ensure the highlighted switch is positioned at “Solar”. Remove the white plastic cover from the battery terminals. Use the loose black and red wires and slide on to connect to the battery terminals. Maintain polarity: Black to black (-). Red to red (+).
5 Connect the Sensor(s)
The inputs shown in the blue box connect directly to the inputs in the yellow box on the Metron5 above Run the sensor cable(s) through the lower unit’s glands. Unplug the green connector(s) and wire in as required. Plug the connector(s) back into the correct input channel and tighten the gland. Ensure cable is through the gland. Reattach all lids and take care to tighten screws to ensure waterproof IP67 rating is maintained.
0-10 Volt DC 3 wire sensor
0V +V IN
4-20mA 2 wire sensor that requires power
Volt free contacts
0V +V IN
0V +V IN
Phone: +44 (0) 1827 310666
Email:support@powtechnology.com
5
EASY INSTALL GUIDE: M5/SOL-SYS
6 Navigate the Metron5
Press any button to wake the Metron5. Press left to cycle channels for immediate reading (config. dependent) or enter PIN (1234) and press right after 4th digit to enter homepage.
Move down to F orce Transmit and right to select. Watch the progress bar and wait for the unit to transmit. Once complete, data can be viewed on MetronView. The unit will countdown for 45 seconds, then enter Run Mode. Screen will turn off.
F or live channel readings, channels can be selected from the menu by pressing right on Channels and Read Now.
Go back a level of the menu
Up Down
Select the highlighted option
7 View Data
Visit: 2020.metronview.com Login credentials will have been sent by email. Once logged in, a summary of the units will be visible. Click view to the left of the device’s name to see the historical data.
8 Programming
Units can be remotely programmed from MetronView. It is possible to change how often readings are taken & sent, alter scaling and alarm thresholds for each input channel and much more. To make changes contact PowTechnology support. The configuration will be held on the server and downloaded to the device when it next communicates. Select `Force transmit’ rather than waiting for the next time the device transmits in order to reconfigure sooner.
Note
Failure to mount the solar panel exactly in accordance with the aforementioned rules may result in the unit failing during mid-Winter. If the power drain is greater than expected (from poor signal or lots of retries), a 2nd solar panel may be required.
Common Latitudes: · London: 51.5o; Cardiff: 51.5o; Birmingham: 52.5o;
Leeds: 54.0o; Belfast: 54.5o; Edinburgh: 56.0o; Aberdeen: 57.0o
· Example calculation: London = 51.5o + 10 = 61.5o tilt angle from the horizontal
Phone: +44 (0) 1827 310666
Email:support@powtechnology.com
5
Documents / Resources
![]() |
Metron5 M5 IIoT Sensor Gateway [pdf] Installation Guide M5 IIoT Sensor Gateway, M5, IIoT Sensor Gateway, Sensor Gateway, Gateway |