mars-LOGO

mars GUH92A GUH and GDD Projector Storage Bag

mars-GUH92A-GUH-and-GDD-Projector-Storage-Bag-PRODUCT

Specifications

  • Manufacturer: Heat Controller
  • Model: Single & Two Stage Gas Furnaces
  • Extra Parts Bag Part Numbers: 904985, 904986, M0001118, M0001119
  • Contents: Various parts for installation

Product Usage Instructions

Installation

  1. Refer to the furnace installation instructions for venting requirements.
  2. Dry-fit the components before permanent installation to ensure proper fit and alignment.
  3. Follow the provided table for part numbers and quantities.

mars-GUH92A-GUH-and-GDD-Projector-Storage-Bag-Fig-1

Additional Notes
Ensure proper orientation of PVC components as per provided illustrations.

INSTALLATION INSTRUCTIONS

EXTRA PARTS BAG FOR SINGLE & TWO-STAGE GAS FURNACES 

Parts Bag Part# 904985

EXTRA PARTS BAG FOR GUH92A / GDD92A / GDD95A FURNACES – P/N M0001118
PART NUMBER DESCRIPTION QUANTITY
600364 #10, 1-1/4” INDUCER SCREW 1
606286 HOSE CLAMP 1
631758 STRAIN RELIEF BUSHING 1
632261 3 AMP FUSE 1
663894 CONNECTOR, UNION, 1/2” X 3/8” 1
663989 1/2” BARB X 3/4” NPTF CONNECTOR 1
664633 INLET AIR FINISH FLANGE 1
664886 14.5” DRAIN TUBE 1
689089 7/8” ID GAS LINE GROMMET 1
690074 2-1/4” ID VENT GROMMET 1
690094 3/4” ID CONDENSATE GROMMET 1
690101 3-1/2” OD FINISH FLANGE GASKET 1

Table 1. Extra Parts Bag Contents – M0001118

Parts Bag Part# 904986

EXTRA PARTS BAG FOR GUH95A & GUH95T FURNACES – P/N M0001119
PART NUMBER DESCRIPTION QUANTITY
600364 #10, 1-1/4″ INDUCER SCREW 1
606286 HOSE CLAMP 1
631758 STRAIN RELIEF BUSHING 1
632261 3 AMP FUSE 1
663115 2″ PVC TEE 1
663894 CONNECTOR, UNION, 1/2” X 3/8” 1
663989 1/2″ BARB X 3/4″ NPTF CONNECTOR 1
664633 INLET AIR FINISH FLANGE 1
664659 PVC TRAP 1
664886 14.5” DRAIN TUBE 1
689089 7/8″ ID GAS LINE GROMMET 1
690074 2-1/4″ ID VENT GROMMET 1
690094 3/4″ ID CONDENSATE GROMMET 1
690101 3-1/2″ OD FINISH FLANGE GASKET 1

Table 2. Extra Parts Bag Contents – M0001119

NOTES:

  • It is necessary to vent this furnace according to the methods described in the Venting Requirement section of the furnace installation instructions.
  • Please refer to the installation instructions for proper usage of the listed parts.
  • Before permanently installing these components, it is recommended you dry-fit them first to ensure proper fit and alignment with other vent pipes.

mars-GUH92A-GUH-and-GDD-Projector-Storage-Bag-Fig-2709529A (Replaces 7095290)

HEAT CONTROLLER

  • 1900 Wellworth Ave., Jackson MI 49203
  • Ph. 517-787-2100
  • www.heatcontroller.com
  • Specifications & illustrations subject to change without notice or incurring obligations (1 0/13).

FAQs

Q: Can these parts be used for other furnace models?
A: It is recommended to use these parts specifically for the mentioned furnace models to ensure compatibility and proper installation.

Q: Are additional tools required for installation?
A: Additional tools such as PVC pipe, tubing, and fittings may be required as specified in the installation instructions.

Documents / Resources

mars GUH92A GUH and GDD Projector Storage Bag [pdf] Installation Guide
GUH92A, GUH92A GUH and GDD Projector Storage Bag, GUH and GDD Projector Storage Bag, Projector Storage Bag, Storage Bag

References

Leave a comment

Your email address will not be published. Required fields are marked *