User Guide for GROWATT models including: MIN 2500-6000TL-X Compact Inverters, MIN 2500-6000TL-X, Compact Inverters, Inverters

044.0067704 MIN 2500-6000TL-X英文版快速安装手册

Descarca PDF

Invertor On Grid Monofazat Growatt MIN 5000 TL-X - Panouri Solare Fotovoltaice - Invertoare - Baterii deep cycle

Invertor On Grid Monofazat Growatt MIN 6000 TL-X - Panouri Solare Fotovoltaice - Invertoare - Baterii deep cycle

Download

Growatt MIN 2500TL-X Netz-Wechselrichter PV 2500W 1-phasig


File Info : application/pdf, 2 Pages, 3.03MB

PDF preview unavailable. Download the PDF instead.

MIN 2500-6000TL-X Quick Guide General EN 202206
18

1. Overview

MIN 2500-6000TL-X Quick Guide

1
(1)Front panel (6)DC switch (11)RS485 port

234
(2)Touch button (7)Vent valve (12)AC terminal

5
(3)OLED screen (8)PV terminal

6 7 8 9 10 11 12

(4)LED indicator (10)DRM port

(5)Heat sink (9)USB port

Note 1.This document is for quick installation guidance only, please refer to User Manual for more details. 2.Growatt shall not be liable for any damage resulting from unproper installation.

2. Installation
System overview

2.1 Installation requirements
300mm

375

179

319

28

161

137.5

300mm

300mm

300mm

350 429

2.2 Wall mounting

500mm

250

2.3 Communication module installation

Install

Up

Inverter side

Inverter side

Uninstall

Inverter side

Inverter side

3. Electrical connection

Please prepare the cable before connecting as follows.

No.

Cable name

1

Protective grounding wire

2

AC output wire

3

PV input wire

4

Communication wire

Type Single multi-core yellow-green wire Two or three polychromatic multi-core copper wires PV wiresuch as PV1-F)
RS485

3.1 Grounding

3.2 AC output connection
Type 1

Recommend model 6mm²
6mm² 4mm² - 6mm²
/

Note:
1.Please make sure all switches are in "OFF" position before wiring. For personal safety, please do not operate with electricity. 2.If the diameter of the cable does not match the terminal, or the cable is aluminum wire, please contact our after-sales personnel.

Type 2 Type 3

3.3 DC connection

3.3.1 PV input terminal installation

1

2

Positive metal terminal 8-10mm

4mm² - 6mm²

Negative metal terminal
4 Positive metal terminal

4mm² - 6mm² 5

Please make sure the cable can not be pulled out after pressing.

3
Negative metal terminal Pull the PV cable make sure there is no loose or shaking.

Note 1.When drilling holes in the wall, avoid water and electricity pipes, otherwise it may cause danger.

Negative metal terminal

Make sure the cable polarity is correct and voltage is less than 550V.

3.3.2 Plug in PV terminal

1

2

PV+

Click

PV-

Note: 1.Before installing the PV terminal, please double-check that the PV input voltage and current do not exceed the MPPT limits. 2.When installing the PV terminal, pay attention to the difference between the positive and negative poles and the one-toone correspondence between the terminals and the machine. 3.There is a "click" sound when the terminal is connected,please gently pulling the PV wire to make sure there is no loose or pulling off.

3.3.3 Communication cable installation

The Inverter side
Click!
The Inverter side

SYS COM Port Pin Definitions

No.

Definition

No.

Definition

1 +12V 2 COM

Power supply for

5

external relay(2W)

6

CT-P CT-N

Signal for export limitation (Optional)

3

RS 485A1

Signal for communic

7

RS 485A2

Signal for Smart

4 RS 485B1 ation

8 RS 485B2 Meter

DRM Port Pin Definitions

NO.

1

2

Definition NO

DRM5 4

DRM6 5

Click!

Definition

DRM8 REFGEN

Unclock the housing
Note 1.When laying out signal cables, separate them from power cables to avoid strong signal interference sources 2.Do not mix the connector to the DRM COM port and the connector to the SYS port.

3 DRM7
6 COM/DRM0

4. Connecting Meter

The following table describes how we can connect EASTRON meter (SDM230-Modbus)to inverter: Meter Pin NO. Description

1

L-in

2

L-out

3

N-in

4

N-out

5

RS485A

6
The following table describes how we can connect CHINT meter (DDSU666) to inverter: Meter Pin NO. 1 2 3 4 7 8

RS485B
Description L-in L-out N-in
N-out RS485A RS485B

Meter Connection Grid L
AC connector & Load L Grid N1
AC connector & Load N SYS COM Pin 7 RS485A2 SYS COM Pin 8 RS485B2
Meter Connection Grid L
AC connector & Load L Grid N1
AC connector & Load N SYS COM Pin 7 RS485A2 SYS COM Pin 8 RS485B2

Note: 1 For Australian market,installers can connect pin3 or pin4 to the neutral links/bars.

5. Post-installation check

No.

Acceptance criteria

No.

Acceptance criteria

1 The inverter is installed correctly, firmly and reliably.

6 The RS485 communication cable is installed correctly and firmly.

2

The ground wire connected well and the connection is firm and reliable.

7

The cable tie port is trimmed well without leaving sharp corners,meets the requirements of the user.

3 All switches are in the OFF state.

8

All exposed terminals are well protected and there are no vacant ports.

4 All wiring is correct and securely connected.

9 Pay attention to clean up all construction residues.

5

The wiring of the cable is reasonable, meets the requirements, and there is no phenomenon of broken skin.

6. Power on and off steps

Note: Before turning the inverter on, please make sure the PV input voltage and current are within the MPPT limits. Follow the steps below to turn the inverter on: 1.Switch on the build-in DC isolator at the bottom of the inverter. 2.Switch on the PV Array and DC isolator next to your inverter, if you can not find this switch, skip this step. 3.Switch on the Solar AC isolator if the inverter is more than 3 meters away from your switchboard. 4.Switch on the solar supply main switch in the switch board. To shut down your system, follow this guide in reverse order.

7. Status of PV grid inverter

Customer can read more information by push button.

Mark

Describe

Touch mark

Inverter status indicator

Explain

Single touch Double touch

Switch the display interface or the current number plus 1
Enter the setting state or confirm

Triple touch Long press for 5s

Return to the previous display interface
Confirm Country setting or Number recover default value

Red

Fault

Green

Normal operation

Red light flashing

Warning

It can display the basic information of inverter through OLED display screen (PV/AC voltage,PV power,ACcurrent,total power,generating capacity, etc.).

8. Export limitation setting

Set parameter

Exporlimit OFF ON

General Advanced

Meter CT

Password 123

ExportLimit Rate XXX.X%

9. Service and contact
Shenzhen Growatt New Energy CO.,LTD 4-13/F,Building A,Sino-German(Europe) Industrial Park, Hangcheng Ave,Bao'an District, Shenzhen, China T +86 0755 2747 1942 E service@ginverter.com W www.ginverter.com

Set OK

Under the permission given by your energy provider, the ratio of your system output power divided by the rated power of the inverter is called Export Limit Rate. For instance, if the energy provider only accepts 4kW from your 5KW system, then the Export Limit Rate of 5kW inverter is 80.0%.

Download Manual
GR-UM-149-A-04

Growatt New Energy



References

Corel PDF Engine Version 18.1.0.661 CorelDRAW X8