User Guide for GROWATT models including: MIN 2500-6000TL-X Compact Inverters, MIN 2500-6000TL-X, Compact Inverters, Inverters
Invertor On Grid Monofazat Growatt MIN 5000 TL-X - Panouri Solare Fotovoltaice - Invertoare - Baterii deep cycle
Invertor On Grid Monofazat Growatt MIN 6000 TL-X - Panouri Solare Fotovoltaice - Invertoare - Baterii deep cycle
Growatt MIN 2500TL-X Netz-Wechselrichter PV 2500W 1-phasig
File Info : application/pdf, 2 Pages, 3.03MB
DocumentDocument18 1. Overview MIN 2500-6000TL-X Quick Guide 1 (1)Front panel (6)DC switch (11)RS485 port 234 (2)Touch button (7)Vent valve (12)AC terminal 5 (3)OLED screen (8)PV terminal 6 7 8 9 10 11 12 (4)LED indicator (10)DRM port (5)Heat sink (9)USB port Note 1.This document is for quick installation guidance only, please refer to User Manual for more details. 2.Growatt shall not be liable for any damage resulting from unproper installation. 2. Installation System overview 2.1 Installation requirements 300mm 375 179 319 28 161 137.5 300mm 300mm 300mm 350 429 2.2 Wall mounting 500mm 250 2.3 Communication module installation Install Up Inverter side Inverter side Uninstall Inverter side Inverter side 3. Electrical connection Please prepare the cable before connecting as follows. No. Cable name 1 Protective grounding wire 2 AC output wire 3 PV input wire 4 Communication wire Type Single multi-core yellow-green wire Two or three polychromatic multi-core copper wires PV wiresuch as PV1-F) RS485 3.1 Grounding 3.2 AC output connection Type 1 Recommend model 6mm² 6mm² 4mm² - 6mm² / Note: 1.Please make sure all switches are in "OFF" position before wiring. For personal safety, please do not operate with electricity. 2.If the diameter of the cable does not match the terminal, or the cable is aluminum wire, please contact our after-sales personnel. Type 2 Type 3 3.3 DC connection 3.3.1 PV input terminal installation 1 2 Positive metal terminal 8-10mm 4mm² - 6mm² Negative metal terminal 4 Positive metal terminal 4mm² - 6mm² 5 Please make sure the cable can not be pulled out after pressing. 3 Negative metal terminal Pull the PV cable make sure there is no loose or shaking. Note 1.When drilling holes in the wall, avoid water and electricity pipes, otherwise it may cause danger. Negative metal terminal Make sure the cable polarity is correct and voltage is less than 550V. 3.3.2 Plug in PV terminal 1 2 PV+ Click PV- Note: 1.Before installing the PV terminal, please double-check that the PV input voltage and current do not exceed the MPPT limits. 2.When installing the PV terminal, pay attention to the difference between the positive and negative poles and the one-toone correspondence between the terminals and the machine. 3.There is a "click" sound when the terminal is connected,please gently pulling the PV wire to make sure there is no loose or pulling off. 3.3.3 Communication cable installation The Inverter side Click! The Inverter side SYS COM Port Pin Definitions No. Definition No. Definition 1 +12V 2 COM Power supply for 5 external relay(2W) 6 CT-P CT-N Signal for export limitation (Optional) 3 RS 485A1 Signal for communic 7 RS 485A2 Signal for Smart 4 RS 485B1 ation 8 RS 485B2 Meter DRM Port Pin Definitions NO. 1 2 Definition NO DRM5 4 DRM6 5 Click! Definition DRM8 REFGEN Unclock the housing Note 1.When laying out signal cables, separate them from power cables to avoid strong signal interference sources 2.Do not mix the connector to the DRM COM port and the connector to the SYS port. 3 DRM7 6 COM/DRM0 4. Connecting Meter The following table describes how we can connect EASTRON meter (SDM230-Modbus)to inverter: Meter Pin NO. Description 1 L-in 2 L-out 3 N-in 4 N-out 5 RS485A 6 The following table describes how we can connect CHINT meter (DDSU666) to inverter: Meter Pin NO. 1 2 3 4 7 8 RS485B Description L-in L-out N-in N-out RS485A RS485B Meter Connection Grid L AC connector & Load L Grid N1 AC connector & Load N SYS COM Pin 7 RS485A2 SYS COM Pin 8 RS485B2 Meter Connection Grid L AC connector & Load L Grid N1 AC connector & Load N SYS COM Pin 7 RS485A2 SYS COM Pin 8 RS485B2 Note: 1 For Australian market,installers can connect pin3 or pin4 to the neutral links/bars. 5. Post-installation check No. Acceptance criteria No. Acceptance criteria 1 The inverter is installed correctly, firmly and reliably. 6 The RS485 communication cable is installed correctly and firmly. 2 The ground wire connected well and the connection is firm and reliable. 7 The cable tie port is trimmed well without leaving sharp corners,meets the requirements of the user. 3 All switches are in the OFF state. 8 All exposed terminals are well protected and there are no vacant ports. 4 All wiring is correct and securely connected. 9 Pay attention to clean up all construction residues. 5 The wiring of the cable is reasonable, meets the requirements, and there is no phenomenon of broken skin. 6. Power on and off steps Note: Before turning the inverter on, please make sure the PV input voltage and current are within the MPPT limits. Follow the steps below to turn the inverter on: 1.Switch on the build-in DC isolator at the bottom of the inverter. 2.Switch on the PV Array and DC isolator next to your inverter, if you can not find this switch, skip this step. 3.Switch on the Solar AC isolator if the inverter is more than 3 meters away from your switchboard. 4.Switch on the solar supply main switch in the switch board. To shut down your system, follow this guide in reverse order. 7. Status of PV grid inverter Customer can read more information by push button. Mark Describe Touch mark Inverter status indicator Explain Single touch Double touch Switch the display interface or the current number plus 1 Enter the setting state or confirm Triple touch Long press for 5s Return to the previous display interface Confirm Country setting or Number recover default value Red Fault Green Normal operation Red light flashing Warning It can display the basic information of inverter through OLED display screen (PV/AC voltage,PV power,ACcurrent,total power,generating capacity, etc.). 8. Export limitation setting Set parameter Exporlimit OFF ON General Advanced Meter CT Password 123 ExportLimit Rate XXX.X% 9. Service and contact Shenzhen Growatt New Energy CO.,LTD 4-13/F,Building A,Sino-German(Europe) Industrial Park, Hangcheng Ave,Bao'an District, Shenzhen, China T +86 0755 2747 1942 E service@ginverter.com W www.ginverter.com Set OK Under the permission given by your energy provider, the ratio of your system output power divided by the rated power of the inverter is called Export Limit Rate. For instance, if the energy provider only accepts 4kW from your 5KW system, then the Export Limit Rate of 5kW inverter is 80.0%. Download Manual GR-UM-149-A-04 Growatt New Energy