GE Healthcare Revolution Maxima CT Scanner Installation Guide
This document provides essential information for the successful installation of the GE Healthcare Revolution Maxima CT scanner, featuring the GT2000 table. It details critical aspects such as site readiness requirements, electrical and structural considerations, radiation protection measures, and environmental specifications necessary for optimal system performance and safety.
Key Installation Aspects
The guide outlines the necessary steps and prerequisites for installing the Revolution Maxima CT scanner. It emphasizes the importance of adhering to GE Healthcare's pre-installation manual and site readiness checklists to ensure a smooth setup process. Key areas covered include:
- Site Preparation: Detailed requirements for the examination room, control room, and necessary utilities.
- Electrical Requirements: Specifications for power supply, wiring, grounding, and connectivity.
- Structural Considerations: Guidelines for floor loading, wall mounting, and ceiling support.
- Radiation Protection: Information on shielding requirements and safety protocols.
- Environmental Factors: Temperature, humidity, and noise level specifications for optimal operation.
System Components and Layout
The document includes detailed diagrams and specifications for various system components, including the gantry, GT2000 table, power distribution unit, and operator console. It provides dimensions, weight, and heat dissipation details for each component, aiding in accurate room planning and equipment placement.
Customer Responsibilities
GE Healthcare highlights the customer's responsibilities in preparing the installation site, ensuring compliance with local regulations, and coordinating with GE project managers. This includes verifying structural integrity, managing delivery logistics, and ensuring all necessary permits and approvals are obtained.
For detailed technical specifications and further assistance, please refer to the official GE Healthcare support resources.