Installation Guide for ROLL-A-SHADE models including: Contract Plus 7 Inch Dual Bottom Fascia, Contract Plus, 7 Inch Dual Bottom Fascia, Dual Bottom Fascia, Fascia
File Info : application/pdf, 6 Pages, 6.57MB
DocumentDocumentCONTRACT PLUS+ 7" DUAL BOTTOM FASCIA INSTALL ATION INSTRUCTIONS Rollashade.com info@rollashade.com 951.245.5077 © Copyright Roll-A-Shade® Inc. All Rights Reserved. HARDWARE INCLUDED Bracket Covers Motor Bracket Motor Bracket Idler End #14 Screw Screws Shades + Motors Fascia Shade 1 Shade 2 Shade 3 STOP Zip Ties Wire Tie Pads Wall Switch Switch Box TOOLS REQUIRED 3/8" Hex Head Phillips Head 1/8" Drill Bit Drill 1 INSIDE OR OUTSIDE APPLICATION **NOTE: ALL SHADES MAY BE PRE-PROGRAMMED TO SENSORS, REMOTES, AND/OR WALL SWITCHES UPON ARRIVAL** OUTSIDE INSIDE INSIDE RASCP7DBMVER.1 2 OF 6 | © Copyright Roll-A-Shade® Inc. All Rights Reserved. OUTSIDE 2 MOUNTING LOCATION Place your first bracket in its mounting location and mark the screw holes. Place your second bracket in its mounting location and repeat the process. A B C 3 SCREW INSTALLATION Next, pre-drill your screw holes using a 1/8" drill bit. Install the brackets with the provided screws using the 1/4" hex head driver. 4 ALIGNMENT Check to make sure your brackets are level and aligned. RASCP7DBMVER.1 3 OF 6 | © Copyright Roll-A-Shade® Inc. All Rights Reserved. 5 TOP SHADE PIN END INSTALLATION Swivel ball bearing to align with idler shaft for easy installation. Press idler shaft all the way to the bracket. A B 6 TOP MOTOR END INSTALLATION Remove locking ring. Lineup to motor bracket. Push motor into motor bracket. A B 7 TOP LOCK RING INSTALLATION Add locking ring to motor bracket. Check motor is secured correctly. A B RASCP7DBMVER.1 4 OF 6 | © Copyright Roll-A-Shade® Inc. All Rights Reserved. 8 BOTTOM SHADE PIN END INSTALLATION Swivel ball bearing to align with idler shaft for easy installation. Press idler shaft all the way to the bracket. A B 9 BOTTOM MOTOR END INSTALLATION Remove locking ring. Lineup to motor bracket. Push motor into motor bracket. A B 10 BOTTOM LOCK RING & FASCIA INSTALLATION Add locking ring to motor bracket. Check motor is secured correctly. Install bottom fascia. A B RASCP7DBMVER.1 5 OF 6 | © Copyright Roll-A-Shade® Inc. All Rights Reserved. C D E 11 PLUG IN MOTOR · Run motor power cord to nearest power outlet. · Install wire tie pads and secure with zip ties to hold wire down. · The path of the wire should be parallel with mullions and/or drop ceiling tiles ensuring the cable is neatly organized. · Any modifications to the power cable should be done by a certified electrician to meet your city/state code requirements. 12 SHADE ADJUSTING (IF NECESSARY) · Roll shade up and down to confirm hembar is level and material rolls up straight on center tube. · If the hembar is not level, lower shade until you see the metal tube. · Add layers of masking tape to the metal tube to the end that is too low until hembar is straight. · If the material tracks to one side, lower shade until you see the metal tube. · Add layers of masking tape to the metal tube to the end that is opposite the direction of tracking, until shade rolls up straight. 13 ADJUSTING LIMITS (IF NECESSARY) See programming instructions based on the motor used for your application. RASCP7DBMVER.1 6 OF 6 | © Copyright Roll-A-Shade® Inc. All Rights Reserved.