Dirwin Caravan Cargo E-Bike Assembly Manual
This manual provides step-by-step instructions for assembling your Dirwin Caravan Cargo E-Bike.
Step 1: Install front underframe bearing sleeve/bumper sleeve
Parts: 2x square plates, 5x sleeves, 1x cylindrical sleeve, 2x bearings, 6x M8 screws.
Step 2: Install the fender
Screw: 4x M6*16mm screws.
Step 3: Install the front wheel
Screw: 12x M5*16mm screws.
Step 4:
Installation of the rear wheel assembly.
Step 5:
Screw: 4x M8 screws.
Step 6:
Screw: 2x M6*16mm screws.
Step 7:
Handlebar assembly and installation.
Step 8:
Screw: 8x M6*35mm screws.
Step 9: Install the cargo box
Screw: 24x M6*10mm screws, 24x M6*15mm screws.
Additional Parts: Hinges, Locks.
Step 10: Secure cargo box components
Screw: 2x M6*10mm screws, 2x M6*15mm screws.
Step 11: Finalizing cargo box attachment
Screw: 2x M8*40mm screws.
Step 12:
Screw: 11x M6*10mm screws, 11x M6*15mm screws.
Step 13: Secure cargo box with straps and fasteners
Screw: 4x M6*10mm screws, 4x M6*12mm screws, 4x M4*27mm screws, 4x M4*16mm screws, 4x M4*10mm screws.
Step 14: Attach final components
Screw: 4x M6*25mm screws.
Step 15: Final Assembly Check
Your Dirwin Caravan Cargo E-Bike is now assembled.
Electrical Connection Diagram
This diagram illustrates the electrical connections for the e-bike components:
- Controller: The central unit managing power distribution.
- Motor: Powers the bicycle.
- Sensor: Detects pedaling or other inputs.
- Brake Sensors (x2): Integrated into the brake levers.
- Display: Shows speed, battery level, and other information.
- Throttle: Allows for electric-only propulsion.
- Rear Light: For visibility at the rear.
- Front Light: For illumination at the front.
- Battery: Provides power to the system.
Contact Information
DIRWIN BIKE CO., LTD.
Call Us: (908) 444-0652
Working Days: 8 am-5 pm EST (Weekdays: 9 am-6 pm EST)
E-mail: sales@dirwinbike.com; customerservice@dirwinbike.com
Website: www.dirwinbike.com