Installation Guide for RITAR models including: BAT-5KWH, 10KWH, BAT-5KWH Li Ion Battery, BAT-5KWH, Li Ion Battery, Ion Battery, Battery
Акумулятор RITAR BAT-5KWH-51.2V (LV/51.2V/100Ah/5.12kWh/LifePO4) купити за ціною 47920 грн. Характеристики та відгуки.
51.2V Li-ion Battery. WWW.RITARPOWER.COM. CAUTION. Due to the regulations ... 2. Press ON/OFF button to active the battery, the SOC and RUN indicator will ...
Installation Guide BAT-5KWH , 10KWH 51.2V Li-ion Battery This guide provides guidance on the safe and effective installation and operation wall mounted Li-ion batteries. It also provides information on how to safely connect multiple batteries in parallel (Max. 6), as well as how to charge and discharge the batteries. CAUTION Due to the regulations governing the transportation of Lithium Ion cells and batteries internationally. The battery is only 50% SOC during transport. Please charge battery fully in the first use. Before connecting any electrical cable, turn OFF all the switches and breakers and turn OFF the batteries by press the ON/OFF button. .Avoid any fall or collision during the installation process. Do not remove the battery components. The maintenance of the battery should be carried out by a professional engineer. Do not expose the Li-ion battery to heat in excess of 55°C during operation, 60 °C in storage. 11 Unpacking Inspection 1. Unpack the battery and visually inspect the appearance. If any shipping damage is found, notify the carrier immediately. 2. Press ON/OFF button to active the battery, the SOC and RUN indicator will be light. turn on MCB to measure the output voltage by multimeter, For parallel application, the voltage difference should less than 500mV. 23. Press ON/OFF button to shutdown the battery, the indicator light will turn off. 4. Check the accessories which should include: 4.1. Accessories for 5KWH 2 Mechanical Installation W W W. R I TA R P O W E R . C O M 2.1. Wall mounted for 5KWH Take out wall mounted accessories which include bracket and screws, Fix the bracket on the battery and remove the floor mounted part on the bottom of battery. Drill 4 pcs 10 *110mm holes on the wall, fix wall mounted part on the wall and fasten the screw head of the expansion bolts System Introduction Left view - + CAN RS485 LINK-IN LINK-OUT - + CAN RS485 LINK-IN LINK-OUT ADD ON/OFF ON OFF view ADD ON/OFF ON OFF Accessories for floor mounted (prevent tilt) Bracket for floor mounted 2 pcs outer hexagon inner cross combination bolt _M6X16mm screws Accessories for wall mounted Bracket for wall mounted 4 pcs stainless steel expansion screws M8*100mm 2 pcs outer hexagon inner cross combination bolt _M8X16mm screws RS485 PIN MAP CAN PIN MAP LINK-IN/OUT PIN MAP 8765 4321 RJ45 PIN Description 1 2 3,4,5,6,7,8 RS485_B RS485_A NC 8765 4321 RJ45 PIN Description 1,2,3,4,5,6 7 8 NC CAN_H CAN_L 8765 4321 RJ45 PIN Description 1,2,3,4,5,6 NC 7 RS485-2_A 8 RS485-2_B 2 pcs power cable Black, Red. 100A 25 mm2 high flexible wire, SC25-6 & SC25-8, L=1500mm 1pc Communication 1pc cable-586B,CAT5e, 2m User manual 2pcs RJ45 terminal. Optional Part Optional Part RS485-USB device Wall mounted type distribution box-300A Only for install engineer and after-sale engineer. For several batteries or inverters in parallel Optional Part parallel parts for floor mounted 4.1. Accessories for 10KWH Note: Y Remember that the battery is heavy ! Please be careful when doing operation. Y Use a proper hammer to fit the expansion bolt into the holes. The screw head protruding too long may interfere with the battery cabinet. ON/OFF Button OFF mode During in transport, BMS ON/OFF button is at OFF status. it will turn off the BMS power supply. ON mode By press ON/OFF button to active BMS to enter into working mode, if the MCB is also ON, the battery voltage will can be measured by terminal. Even if the button is at ON mode, The BMS will enter into dormancy mode after 24 hours when there are no charge, no discharge and no communication. it can be activated again by charge or communication or repress ON/OFF button. Accessories for floor mounted (prevent tilt) Bracket for floor mounted 2 pcs outer hexagon inner cross combination bolt _M6X16mm screws Accessories for wall mounted Bracket for wall mounted 8 pcs stainless steel expansion screws M8*100mm 4 pcs outer hexagon inner cross combination bolt _M8X16mm screws 2.2. Floor mounted for 5KWH 550 mm 2 pcs power cable -Black, Red. 100A Version 25 mm2 high flexible wire, SC25-8 & SC25-8, L=1500mm 150A Version 35 mm2 high flexible wire, SC35-8 & SC35-8, L=1500mm 200A Version 50 mm2 high flexible wire, SC50-8 & SC50-8, L=1500mm 1pc 1pc Communication User manual cable- 586B,CAT5e, 2m 2pcs RJ45 terminal. Optional Part Optional Part RS485-USB device Wall mounted type distribution box-300A Only for install engineer and after-sale engineer. For several batteries or inverters in parallel Optional Part parallel parts for floor mounted 2 pcs outer hexagon inner cross combination bolt _M6X16mm screws Ver V1.0 Publish Date2023-06-10 Installation Guide BAT-5KWH , 10KWH 51.2V Li-ion Battery 2.3. Wall mounted for 10KWH Take out wall mounted accessories which include bracket and screws, Fix the bracket on the battery. Drill 8 pcs 10 *110mm holes on the wall, fix wall mounted part on the wall and fasten the screw head of the expansion bolts. 3 Parallel Connection For floor mounted parallel connection, it supports to install as below: W W W. R I TA R P O W E R . C O M 4.2 Single inverter with 2 batteries The below power cable connection can't increase current. can support prolong the backup time, RS485 to USB cable COM cable Note: Y Remember that the battery is heavy (96Kg) ! Please be careful when doing operation. Y Use a proper hammer to fit the expansion bolt into the holes. The screw head protruding too long may interfere with the battery cabinet. 2.4. Floor mounted for 10KWH 4 Cable Connection 4.1 Single inverter with single battery Step 1. Make sure the battery breaker is in off condition. Connect the power cable to inverter. Make sure the screws are tight. Step 2. Connect the communication cable. Step 3. Set the battery module ID by ADD. The master battery which do communication with inverter ADD must be 1. Step 4. Make sure the inverter had be installed correctly. Step 5. Press ON/OFF button to active the battery BMS and connect battery to PC by BMS PC software, select inverter protocol on BMS (detail operation refer to user manual) Step 6. Turn on battery breaker and the inverter will be activated, set the inverter (battery type and protocol). Step7. If the communication between BMS and inverter is nominal, the SOC, temperature information in PC and inverter display will be totally same. Step8. Charge the batteries fully in first use. COM cable ON ADD - + ON/OFF OFF ON 1 2 3 4 OFF CAN RS485 LINK-IN LINK-OUT RS485 to USB cable Note: Y For 1pcs 5KWH battery and 10KWH-100A , it max support 5KVA inverter or the real load power consumption is less than 5KW. Y For 1pcs 10KWH-150A battery , it max support 8KVA inverter or the real load power consumption is less than 7KW. Y For 1pcs 10KWH-200A battery , it max support 10KVA inverter or the real load power consumption is less than 8KW. ADD ON/ OFF ON OFF - + ON 1 2 3 4 OFF Master battery CAN RS485 LINK-IN LINK-OUT ON - + ADD ON/ OFF OFF CAN RS485 LINK-IN LINK-OUT ON 1 2 3 4 OFF 4.3 Single inverter with 2 batteries The below power cable connection can increase current to support big capacity inverter. The length of power cable should be the same. RS485 to USB cable ADD ON/ OFF ON OFF - + ON - + ADD ON/ OFF OFF ON 1 2 3 4 OFF Master battery CAN RS485 LINK-IN LINK-OUT COM cable CAN RS485 LINK-IN LINK-OUT ON 1 2 3 4 OFF Ver V1.0 Publish Date2023-06-10Corel PDF Engine Version 17.5.0.907