Installation Guide for RITAR models including: BAT-5KWH, 10KWH, BAT-5KWH Li Ion Battery, BAT-5KWH, Li Ion Battery, Ion Battery, Battery

RESS Li-ion Battery Installation Guide

Акумулятор RITAR BAT-5KWH-51.2V (LV/51.2V/100Ah/5.12kWh/LifePO4) купити за ціною 47920 грн. Характеристики та відгуки.

[PDF] RESS Li-ion Battery Installation Guide - DEPS

51.2V Li-ion Battery. WWW.RITARPOWER.COM. CAUTION. Due to the regulations ... 2. Press ON/OFF button to active the battery, the SOC and RUN indicator will ...

PDF preview unavailable. Download the PDF instead.

Ritar BAT-5KWH-51.2V Installation-guide EN
Installation Guide BAT-5KWH , 10KWH 51.2V Li-ion Battery

This guide provides guidance on the safe and effective installation and operation wall mounted Li-ion batteries. It also provides information on how to safely connect multiple batteries in parallel (Max. 6), as well as how to charge and discharge the batteries.
CAUTION
Due to the regulations governing the transportation of Lithium Ion cells and batteries internationally. The battery is only 50% SOC during transport. Please charge battery fully in the first use. Before connecting any electrical cable, turn OFF all the switches and breakers and turn OFF the batteries by press the ON/OFF button. .Avoid any fall or collision during the installation process. Do not remove the battery components. The maintenance of the battery should be carried out by a professional engineer. Do not expose the Li-ion battery to heat in excess of 55°C during operation, 60 °C in storage.

11 Unpacking Inspection
1. Unpack the battery and visually inspect the appearance. If any shipping damage is found, notify the carrier immediately. 2. Press ON/OFF button to active the battery, the SOC and RUN indicator will be light. turn on MCB to measure the output voltage by multimeter, For parallel application, the voltage difference should less than 500mV.
23. Press ON/OFF button to shutdown the battery, the indicator light will turn off. 4. Check the accessories which should include:
4.1. Accessories for 5KWH

2 Mechanical Installation

W W W. R I TA R P O W E R . C O M

2.1. Wall mounted for 5KWH
Take out wall mounted accessories which include bracket and screws,
Fix the bracket on the battery and remove the floor mounted part on the bottom of battery.
Drill 4 pcs 10 *110mm holes on the wall, fix wall mounted part on the wall and fasten the screw head of the expansion bolts

System Introduction

Left view

-

+

CAN RS485 LINK-IN LINK-OUT

-

+

CAN RS485 LINK-IN LINK-OUT

ADD ON/OFF

ON OFF

view

ADD ON/OFF

ON OFF

Accessories for floor mounted (prevent tilt)
Bracket for floor mounted
2 pcs outer hexagon inner cross combination bolt _M6X16mm screws

Accessories for wall mounted Bracket for wall mounted 4 pcs stainless steel expansion screws M8*100mm 2 pcs outer hexagon inner cross combination bolt _M8X16mm screws

RS485 PIN MAP CAN PIN MAP

LINK-IN/OUT PIN MAP

8765 4321
RJ45 PIN Description

1 2 3,4,5,6,7,8

RS485_B RS485_A
NC

8765 4321

RJ45 PIN Description

1,2,3,4,5,6 7 8

NC CAN_H CAN_L

8765 4321

RJ45 PIN Description

1,2,3,4,5,6

NC

7

RS485-2_A

8

RS485-2_B

2 pcs power cable Black, Red. 100A 25 mm2 high flexible wire, SC25-6 & SC25-8, L=1500mm

1pc Communication 1pc cable-586B,CAT5e, 2m User manual
2pcs RJ45 terminal.

Optional Part

Optional Part

RS485-USB device Wall mounted type

distribution box-300A

Only for install engineer

and after-sale engineer. For several batteries or

inverters in parallel

Optional Part parallel parts for floor mounted

4.1. Accessories for 10KWH

Note: Y Remember that the battery is heavy ! Please be careful when doing
operation. Y Use a proper hammer to fit the expansion bolt into the holes. The screw
head protruding too long may interfere with the battery cabinet.

ON/OFF Button
OFF mode
During in transport, BMS ON/OFF button is at OFF status. it will turn off the BMS power supply.
ON mode
By press ON/OFF button to active BMS to enter into working mode, if the MCB is also ON, the battery voltage will can be measured by terminal.
Even if the button is at ON mode, The BMS will enter into dormancy mode after 24 hours when there are no charge, no discharge and no communication. it can be activated again by charge or communication or repress ON/OFF button.

Accessories for floor mounted (prevent tilt)
Bracket for floor mounted
2 pcs outer hexagon inner cross combination bolt _M6X16mm screws

Accessories for wall mounted Bracket for wall mounted 8 pcs stainless steel expansion screws M8*100mm 4 pcs outer hexagon inner cross combination bolt _M8X16mm screws

2.2. Floor mounted for 5KWH 550 mm

2 pcs power cable -Black, Red. 100A Version 25 mm2 high flexible wire,
SC25-8 & SC25-8, L=1500mm 150A Version 35 mm2 high flexible wire, SC35-8 & SC35-8, L=1500mm 200A Version 50 mm2 high flexible wire, SC50-8 & SC50-8, L=1500mm

1pc

1pc

Communication User manual

cable-

586B,CAT5e,

2m

2pcs RJ45 terminal.

Optional Part

Optional Part

RS485-USB device Wall mounted type

distribution box-300A

Only for install engineer

and after-sale engineer. For several batteries or

inverters in parallel

Optional Part parallel parts for floor mounted 2 pcs outer hexagon inner cross combination bolt _M6X16mm screws

Ver V1.0 Publish Date2023-06-10

Installation Guide BAT-5KWH , 10KWH 51.2V Li-ion Battery

2.3. Wall mounted for 10KWH
Take out wall mounted accessories which include bracket and screws, Fix the bracket on the battery. Drill 8 pcs 10 *110mm holes on the wall, fix wall mounted part on the wall and fasten the screw head of the expansion bolts.

3 Parallel Connection
For floor mounted parallel connection, it supports to install as below:

W W W. R I TA R P O W E R . C O M
4.2 Single inverter with 2 batteries The below power cable connection can't increase current. can support prolong the backup time,
RS485 to USB cable COM cable

Note: Y Remember that the battery is heavy (96Kg) ! Please be careful when doing operation. Y Use a proper hammer to fit the expansion bolt into the holes. The screw head protruding too long
may interfere with the battery cabinet.
2.4. Floor mounted for 10KWH

4 Cable Connection
4.1 Single inverter with single battery
Step 1. Make sure the battery breaker is in off condition. Connect the power cable to inverter. Make sure the screws are tight.
Step 2. Connect the communication cable.
Step 3. Set the battery module ID by ADD. The master battery which do communication with inverter ADD must be 1.
Step 4. Make sure the inverter had be installed correctly.
Step 5. Press ON/OFF button to active the battery BMS and connect battery to PC by BMS PC software, select inverter protocol on BMS (detail operation refer to user manual)
Step 6. Turn on battery breaker and the inverter will be activated, set the inverter (battery type and protocol).
Step7. If the communication between BMS and inverter is nominal, the SOC, temperature information in PC and inverter display will be totally same.
Step8. Charge the batteries fully in first use.

COM cable

ON

ADD

-

+

ON/OFF

OFF

ON 1 2 3 4 OFF

CAN RS485 LINK-IN LINK-OUT

RS485 to USB cable

Note: Y For 1pcs 5KWH battery and 10KWH-100A , it max support 5KVA inverter or the real load
power consumption is less than 5KW. Y For 1pcs 10KWH-150A battery , it max support 8KVA inverter or the real load power
consumption is less than 7KW. Y For 1pcs 10KWH-200A battery , it max support 10KVA inverter or the real load power
consumption is less than 8KW.

ADD ON/ OFF

ON OFF

-

+

ON 1 2 3 4 OFF
Master battery

CAN RS485 LINK-IN LINK-OUT

ON

-

+

ADD ON/ OFF

OFF

CAN RS485 LINK-IN LINK-OUT

ON 1 2 3 4 OFF

4.3 Single inverter with 2 batteries
The below power cable connection can increase current to support big capacity inverter. The length of power cable should be the same.

RS485 to USB cable

ADD ON/ OFF

ON OFF

-

+

ON

-

+

ADD ON/ OFF

OFF

ON 1 2 3 4 OFF
Master battery

CAN RS485 LINK-IN LINK-OUT

COM cable

CAN RS485 LINK-IN LINK-OUT

ON 1 2 3 4 OFF

Ver V1.0 Publish Date2023-06-10


Corel PDF Engine Version 17.5.0.907