Introduction
This guide provides essential information for the proper installation of the Sub-Zero UC-15I Undercounter Ice Machine. It covers critical pre-installation considerations, detailed electrical and plumbing requirements, and step-by-step instructions for a successful setup. Ensure all guidelines are followed to guarantee optimal performance and safety.
Key Installation Steps
The installation process involves several key stages:
- Pre-Installation Considerations: Review site requirements, including space, power supply, and water access.
- Electrical Requirements: Understand the necessary grounded, polarized electrical connections and circuit breaker specifications.
- Plumbing Requirements: Details on water supply lines, drain connections, and pressure considerations are provided.
- Installation Procedure: Step-by-step instructions for connecting water and drain lines, electrical connections, and initial setup.
- Door Panel Installation: Guidance on fitting and installing the custom door panel, including options for reversing the door swing.
- Leveling and Securing: Instructions on adjusting leveler legs and securely fastening the unit to cabinets.
Important Safety Information
WARNING: Improper installation can lead to personal injury, property damage, and erratic machine operation. Always consult qualified professionals if unsure about any aspect of the installation. Ensure the unit is properly grounded in accordance with all electrical codes.
For further details and design specifications, visit the Sub-Zero website.