Instruction Manual for Pytes models including: TMR-190, 25, 18, TMR-190 Lithium Battery and MPP Inverter, TMR-190, Lithium Battery and MPP Inverter, MPP Inverter

123

Installation and configuration manual With for ...

25 nov 2024 — Conductor cross-section: UL10269-1/0AWG-200mm-. Amphonel 8.0mm Or. TMR-190*25*18mm. Cable diameters: 14 mm to 25 mm. Only copper cables may be used.

Installation and configuration manual With for

6 Pic 4.3 3. Communication Cable Connection Step.1: Wire Set Up a): Prepare one cable, one clamp and one scissor as shown in Pic 5.1.1.

[PDF] Installation and configuration manual With for Pytes Lithium Battery ...

Nov 25, 2024 · Pytes Lithium Battery V Series &MPP Inverter. Page 2. 2. BOM List. Before installation, you should prepare following items as shown in Graph 1.

PDF preview unavailable. Download the PDF instead.

d3fcc9352acf3837d9b53da988357f37
Installation and configuration manual With for Pytes Lithium Battery V Series & MPP Inverter

BOM List

Before installation, you should prepare following items as shown in Graph 1.

Item

Remarks

Quantity

Power Cable (DC)
RJ45 Cable PC (Personal Computer) Battery

 Conductor cross-section: UL10269-1/0AWG-200mmAmphonel 8.0mm Or TMR-190*25*18mm Cable diameters: 14 mm to 25 mm Only copper cables may be used. The DC cables must be sized for the maximum battery voltage and the maximum battery current. RS485 communicationTerminal (RJ45 port) follow RS485 protocol, to output batteries information.

Depends on the number of batteries and the connection method
1

Self-Provide.

1

V series

Depends on the number of batteries and the connection method

Inverter

MPP Inverter

1

Graph 1.

2

How to Install
Install the system as shown in Flow Chart 1.

Power cable connection

Communication cable connection

Start up the system

Set the DIP switch

change the battery setting of the inverter

Check the battery SOC

System monitoring

Flow Chart 1.

CAUTION: If you want to get more inverter-related settings, please refer to the inverter user manual first.

3

1.Communication Cable

Definition RS485 Port Pin for BMS is as follow. RS485 port definition

Version

Pin number of com. cable

V version

Pic 2

2.Power Cable Connection
Step.1 Before connecting all wirings, please take off bottom cover by removing two
screws as shown Pic 4.1.

4

Pic 4.1

Step.2

Connect the red and black cables to the inverter DC connector as shown in

Pic 4.2.

BATTERY+

BATTERY-

Pic 4.2
Step.3 At the other end of the cable, connect to the battery as shown Pic 4.3.
Ensure that the battery power switch is off
5

Pic 4.3
3. Communication Cable Connection
Step.1: Wire Set Up a): Prepare one cable, one clamp and one scissor as shown in Pic 5.1.1.
Pic 5.1.1
b): Cut the cable skin at both ends to expose the wires as shown in Pic 5.1.2.
Pic 5.1.2
c): Arrange wires sequence according to pic2.(1-3,2-5) d): Check the battery wire sequence. e): Insert battery wire lines and inverter wire lines respectively into crystal heads. f): Clamp two crystal heads tightly and take them out as shown in Pic 5.1.3.
6

Pic 5.1.3
Step.2: Cable Connection Connect the inverter end of the cable to the inverter BMS port as shown in
Pic 5.2.1. Make sure which communication port to use.
RS485
Pic 5.2.1
Connect the battery end of the cable to the battery communication port as shown in Pic 5.2.2 (Ensure the correct sequence of wires inside the communication cable).
7

RS485

4. Set the DIP Switch

Pic 5.2.2

Set the 1st dip-switch up and the rest of the switches down. Only the master battery requires the dip switches adjusted as shown in Pic 6.1

Version
V version

ADD setting

Pic 6.1
5. Start Up the System
Start up the inverters and batteries.
6. Change the Battery Setting of The Inverter
CAUTION: If you want more details about the batteries settingsplease
8

check the operating manual of inverters. Choose L16 in programme 3.(Some Mpp models will have this battery type setting in programme 5.)
Pic 8.1
END