Instruction Manual for Mercia Garden models including: Corner Summerhouse, 03COR0707-V4, 7X7
Refer to the instructions pages for you speci˜c product code **Protim Aquatan T5 (621)** Your building has been treated with Aquatan. Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.
Winter = High Moisture = Expansion Summer = Low Moisture = Contraction. BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY - Check the pack and make sure...
File Info : application/pdf, 7 Pages, 3.15MB
DocumentDocumentGeneral Instructions 03COR0707-V4 7X7 CORNER SUMMERHOUSE Please retain product label and instructions for future reference x2 All building's should be erected by two adults Winter = High Moisture = Expansion Summer = Low Moisture = Contraction BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY - Check the pack and make sure you have all the parts listed. - When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit. - Ensure there is plenty of space and a clean dry area for assembly. TIMBER As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow. Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment to prevent water ingress Pressure Treated buildings - Require a waterproof treatment to prevent water ingress Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment. BUILDING A BASE When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment. Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding. TYPES OF BASE - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. Refer to the instructions pages for you specific product code 2mm Drill bit For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk. CAUTION Every effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber. **Protim Aquatan T5 (621)** Your building has been treated with Aquatan. Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry. Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings. Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol. For assistance please contact customer care on: 01636 880514 Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk P 1 03COR0707-V4 Overall Dimensions: Length = 2073mm Width = 2073mm Height = 2145mm Base Dimensions: Length = 1998mm Width = 1998mm Before assembly please make sure you have a suitable base ready to erect your building MADE IN GREAT BRITAIN 1 2 3 4 Door Panel QTY 1 AI-03COR0707-V4DP Window Panel QTY 2 AI-03COR0707-V4WP Rear Panel Right QTY 1 AI-03COR0707-V4RPR Rear Panel Left QTY 1 AI-03COR0707-V4RPL Please retain product label and instructions for future reference 9 Roof Frame - 28 x 28 x 2049mm QTY 1 FS2828-2049MM 10 Roof Frame - 28 x 28 x 2025mm QTY 1 FS2828-2025MM 11 Roof Frame - 28 x 28 x 1149mm QTY 2 FS2828-1149MM 12 Roof Frame - 28 x 28 x 1196mm QTY 1 FS2828-1196MM 13 Roof Support - 44 x 58 x 1906mm QTY 1 F4458-1906MM 14 Fascia - 12 x 95 x 2045mm QTY 2 S1295-2045MM 15 Fascia - 12 x 95 x 1275mm QTY 3 S1295-1275MM 16 Cover Trim - 12 x 40 x 1918mm QTY 4 S1240-1918MM 17 Panel Joint Frame - 28 x 28 x 1806mm QTY 1 FS2828-1806MM 18 Barrel Bolt QTY 2 PI-07-0114 22 Press Lock QTY 1 PI-07-0162 19 20 21 Butt hinge QTY 6 PI-07-0066 Door Handle QTY 2 PI-07-0081 Turn Button QTY 2 PI-07-0034 23 "L" Bracket QTY 2 PI-07-0012 24 Rain Guard - 28 x 44 x 680mm QTY 2 RG2844-680MM 25 Rear Cover Trim - 12 x 60 x 1800mm QTY 2 S1260-1800MM 26 Rain Guard - 28 x 44 x 990mm QTY 1 RG2844-990MM 5 6 7 8 Nail Bag Roof Sheet QTY 1 8 x 2053 x 2053mm PI-03-0041 Floor QTY 1 AI-03COR0707-V4F Slave Door QTY 1 AI-03FGD1720X475-V1 Master Door QTY 1 AI-03FGMD1720X475-V1 30mm Screw x43 40mm Screw x56 50mm Screw x12 60mm Screw x24 Felt Tacks x100 10mm Screw x8 16mm Screw x6 25mm Screw x18 P 2 Pre Assembly Remove transportation blocks from the bottom of each panel before beginning assembly. Each Panel should have two. Attach the butt hinges to the door using 3x25mm screws and to the door panel using 3x30mm screws per hinge. 18x25mm Screws 18x30mm Screws Pre drill hole 30mm screw 25mm screw 1 7 8 19 Please retain product label and instructions for future reference Pre Assembly Position press lock on the door align with key hole and fix into position using 4 x 10mm screws. Then fit barrel bolts to top and bottom of the door as shown in diagram. Use 4x10mm screws per barrel bolt. Ensure doors open and close 18 freely. Drill a hole in the framing 22 above and below the door for the tower bolt to fix into. 4x16mm Screws 8x10mm Screws Pre drill hole 16mm screw 10mm screw Pre drill holes then fix Chrome Handle using 35mm coach screw as shown in diagram. 4x35mm Bolt Pre drill hole 35mm bolt 20 P 3 Step 1 Place the floor on a firm and level base, ensure the base has suitable drainage, free from areas where standing water can collect. *Wood is a natural product and is subject to movement with changing weather conditions. It is important that you fit the turn buttons and tower bolts as per the fitting instructions. Step 2 Fix the window panels and the door panel with 6x60mm screws as shown in the 2 diagram. 6x60mm Screws Pre drill hole 60mm screw Please retain product label and instructions for future reference Step 3 Place rear panel left against the floor and the window side. Fix into place using 3x50mm screws as shown in the diagram. Attach the panel joint into place with 3x50mm screws. 6x50mm Screws 4 17 Pre drill hole 50mm screw Step 4 1 Using the same method outlined in 2 Step 3 place the rear panel right against the floor and window panel securing using 6x50mm screws. 6x50mm Screws Pre drill hole 50mm screw P 4 Step 5 Position the support bar across the building from the left window panel upright framing to the opposite framing on the plain panel right as shown in the diagram. Fix the support bar the framing on both panels using the L bracket and 4x30mm screws per bracket as shown in the bubble diagram. 8x30mm Screws Pre drill hole 30mm screw 23 13 23 13 23 Please retain product label and instructions for future reference Step 6 Layout the roof sheet and position the roof framing onto the sheet as shown in the diagram. Ensure the framing is level around the edges and fix into place using 30mm screws. * It is recommended to cut the felt sheets before fixing the roof to the building. 17x30mm Screws 9 10 11 12 11 Pre drill hole 30mm screw Step 7 Place the roof section on top of the building, ensure the roof framing slots over each side. Fix the roof onto the panels using 40mm screws making sure they line up with the internal framing. Screw 6x60mm screws through the roof and into the support bar. 21x40mm screws 6x60mm screws Pre drill hole 40mm screw 60mm screw P 5 50mm Slave Door Step 8 Cut three strips from the roll of felt, 2x3020mm and 1x1420mm in length. Place felt on top of roof sheet and align as shown in diagram ensuring strip 3 over hangs the front by 50mm. with equal spacing at each corner. 50mm 17 Corner 50mm *Ensure strip 1 is the first piece placed down then lay sheet 2 and then 3. Make sure each sheet overlaps the next by at least 100mm creating a run off. Use a fascia as a guide to mark out the angled cuts including 50mm overhang. Triangle Cut the sides as shown in diagram at the dotted lines, use fascia width as a cutting guide. Cut the triangle with 1420mm 50mm overhang again using fascia as 1 a guide. 100x Felt Tacks Step 9 Attach the cover trims as shown using 3x40mm screws per cover trim. 12x40mm Screws 16 Pre drill hole 40mm screw 16 Felt tacks 302F0rmomnt 3 1000mm 50mm 2 Corner 16 16 PPleleaasesereretataininpprorodduuccttlalabbeel laannddininstsrturucctitoionnssfoforrfufututurerererefefererenncece Step 10 Fit the fascias to the building over the felt and secure in place with 40mm screws as shown. Cut to length where necessary. Pre drill to avoid splitting. Make sure the fascias at the back of the building fit lower than the roof height to allow water to run off. 17x40mm Screws 14 14 15 15 15 Pre drill hole 40mm screw *Cut down trims to fit Step 11 Attach the two turn buttons to the slave door using 2x16mm screws. * These turn buttons help to keep your doors straight during high and low levels of moisture content in the air. 2x16mm Screws Pre drill hole 16mm screw Locking Door P 6 Step 12 Attach the rain guards to the building, fixing in place above each window using 3x60mm screws per guard. 6x60mm Screws Pre drill hole 60mm screw Step 13 Fix the rear cover trimsto the back of the building, aligning with the edge of the panel. 6x40mm Screws Pre drill hole 40mm screw Step 14 Please retain product label and instructions for future reference Attach the larger rain guard above the door, fixing in place using 3x60mm screws. 6x60mm Screws Pre drill hole 60mm screw 24 26 25 25 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back