Mytee LTD5 115 Volt System
Wiring Diagram
Power Input
L1: Connected to system power
G: Ground connection
L2: Connected to system power
L1: Connected to system power
G: Ground connection
L2: Connected to system power
Control and Components
L2a: Connection point
L1a: Connection point
light: Indicator light connection
L1b: Connection point
L2b: Connection point
G: Ground connection
Connected via relays and F/S switches.
Controls C348 VAC 1 operation.
Function/Switch component.
G: Ground connection
Connected via relays and F/S switches.
Controls C348 VAC 2 operation.
Function/Switch component.
L2: Power input
L1: Power input
G: Ground connection
Connected to E-515 components.
L2: Power input
L1: Power input
G: Ground connection
Connected to E-515 components.
Electrical components, likely relays or contactors, controlling various system functions.
Connections are made to pumps and other system elements.
Grounding
A ground connection is provided to the switch plate.
Diagram Date: 10/15/2018