Installation Guide for Danfoss models including: CTM 1 Multi Ejector, CTM 1, Multi Ejector, Ejector

Multi Ejector, type CTM 1 - CTM 2

Danfoss A/S


File Info : application/pdf, 4 Pages, 1.23MB

PDF preview unavailable. Download the PDF instead.

Installation guide multi ejector type CTM 1, CTM 2 (Інструкція з установки)
032R9798 032R9798

ENGINEERING TOMORROW

Installation guide
Multi Ejector type CTM 1 - CTM 2

ugov.ua

English

Refrigerant: R744 with oil

Max. Working Pressure: 140 bar / 2031 psi

Ambient temp. range: -10 °C ­ +50 °C / 14 °F ­ 122 °F

Media temp. range: -10 °C ­ +50 °C / 14 °F ­ 122 °F
Max. OPD: 90 bar / 1305 psi Min. OPD: 0.1 bar / 1.45 psi

Connector positions Ejector
CTM 1 1

Label

Ejector Ejector
CTM 2 1 2

Label

Strainer
High pressure inlet A

Strainer
High pressure inlet A

Suction inlet C

Suction inlet C

Receiver E

Receiver E

WARNING!

The CTM Multi Ejector valve is approved for use only with Danfoss controller type AK-PC 78x, AK-CC 550A or AK-CC 750A and AK-SM 8xx.

DISCLAIMER

Danfoss expressly disclaims, and any responsibility or liability, whether based on contract, breach of warranty, tort, statute or otherwise, shall be excluded, if the CTM Multi Ejector valve is used with any controller other than a Danfoss controller type AK-PC 78x, AK-CC 550A or AK-CC 750A and AK-SM 8xx.
For further information on AK-PC, please see separate document.

WARNING!

· Do not disassemble / assemble the parts unnecessarily to avoid risk of breaking the O-ring, dirt in the valve etc.
· Avoid high mechanical stress in connection with tube mounting / welding. · Do not remove connectors during welding / brazing.

General installation
· Always place the ejector with the coils upwards so the check valve inside can use gravity to close. · Coils available in 110 -120V AC and 230V AC, 50/60Hz. · It is recomended to place shut-off valves on all 3 connections. · Evacuating the ejector is recommended to do on the outlet and on the high pressure side. · Pressurizing the ejector should be done from the suction side first (Suction inlet C). · It is recommended to install ejector after suction filter (Suction inlet C).

© Danfoss | DCS (rm) | 2020.01

DKRCC.PI.VM0.C2.02 | 1

Mounting: With coils upwards CTM Multi Ejector needs to be fixed to the rack frame using 2 holes in the aluminum block do avoid stress on the connectors

Brazing

Danfoss 032F893.11
Welding

N2

N2

Max. 75 °C / 167 °F Max. 700 °C / 1300 °F

Max. 75 °C / 167 °F

Danfoss
032F894.10
Recommendation for brazing

Recommendation:

brazing

nozzle

4

-

6

mm

(

5/32

in

-

/15 64

in)

Materials used for brazing:

· Flux: Metalli tenacity No. 5 Powder or Braze Tec

special h paste.

· Filler: Silver-Flo 55 (BS:AG 14/ DIN L-Ag55 Sn) or

Silver-Flo 56 (AWS B Ag-7).

Danfoss 032F1016.10
Recommendation for TIG welding
· Power approximately 60 A. · Use Shield gas charge - Argon. · Material for welding - approximately
2 mm thick stainless steel alloy.

Warning: Filler metals containing Phosphor i.e. BS: CP 1/ DIN L-Ag 15P or BS: CP 3/ DIN L-Ag P7 must not be used.

Coil

On

Off

Click!

Danfoss 32F1002.10
Warning Be sure that the O-ring is in place.

Danfoss 32F1004.10

Mounting DIN plug / LED DIN plug. © Danfoss | DCS (rm) | 2020.01

Danfoss 32F882.10
Warning

Danfoss 32F1004.10

Never switch on power to the coil when it is

dismounted from the valve. There is a danger the coil

may be damaged and a risk of injuries and burns.

Armature tubes are sensitive and have to be protected
during the installation: · do not damage the armature tubes with strokes or
forces · do not lift or handle the block by lifting the armature
tubes etc. · avoid pull-forces on the wires connected to the coils

DKRCC.PI.VM0.C2.02 | 2

Starting up /Operation: Opening sequence: 1 - connector A 2 - connector C 3 - connector E Follow the opening sequence to avoid too high NRV differential pressure.
Service Mounting and service of ejectors Ejectors with the highest capacities (longest ejectors) must be placed closest to the suction connector C.

Starting up the system: open all connection ball valves slowly (avoiding liquid hammer that can damage internal check valve (NRV) and build-in strainer. It is mandatory to clean the strainer after 2 days of running the system. O-rings needs to be replaced with the two new ones placed on the strainer top. Removed O-rings to be placed on the strainer top and reused after return to initial shape during next strainer maintenance. Strainer cleanliness is important for proper operation of Multi Ejector and the cleaning shall be repeated if necessary every 2-3 weeks to remove the dirt circulating in the system.
A: Inlet connector Gas cooler outlet - Ball valve - inlet connector Combi brazing 7/8 inch ODF - weld 3/4 inch (EN10220)
C: Suction connector MT evaporator outlet - Ball valve - suction connector Combi brazing 7/8 inch ODF- weld 3/4 inch (EN10220)
E: Outlet connector Outlet connector - Ball valve - Receiver Combi brazing 7/8 inch ODF- weld 3/4 inch (EN10220)

A

A

Warning:

C

C

Do not disassemble / assemble

the parts unnecessarily to avoid

risk of breaking the O-ring, dirt in the valve etc.

E

E

Insulation of Multi Ejector Requirements for materials used for insulation: · has to be based on a synthetic rubber base or ex Polyurethane · water vapor diffusion resistance number  7000
Exchange of connectors and pressure transmitters

· thermal conductivity  0,033 W/(m·K) · insulations material thickness  5 mm · for use at low temperature -10°C or lower · for use at high temperature +50°C or higher · glue or adhesive made of Poly chloroprene or it is Silicone type
Do not insulate the coils of Multi Ejector
C
Danfoss 32F1006.10

D

B

Torque 6 mm screws: 10 Nm ± 1 Nm

Allen key 5 mm

A

C

Tightening sequence

D

B

© Danfoss | DCS (rm) | 2020.01

Torque 6 mm screws: 10 Nm ± 1 Nm Allen key 5 mm
Torque 6 mm screws: 10 Nm ± 1 Nm Allen key 5 mm

DKRCC.PI.VM0.C2.02 | 3

Service

© Danfoss | DCS (rm) | 2020.01

Service on strainer
3 Allen key 5 mm
1 2
Remove strainer from valve body Service on ejector

5 mm allen key
4

5

6

5 mm allen key

Torque 6 Nm ± 1 7

= compressor oil

Tightening sequence

A

C

D

B

Danfoss 32F855.10

8

Allen key 5 mm Torque 10 Nm ± 1

Dismount strainer

Clean or replace strainer and replace O-ring

Assemble strainer

Oil O-rings and place strainer in valve

Mount the strainer with screws

3 Allen key 5 mm
1
2
Remove ejector from valve body

Replace complete ejector

Oil O-rings and place ejector

Tightening sequence

A

C

D

B

Allen key 5 mm Torque 10 Nm ± 1

Danfoss 32F1014.20
Mount the ejector with screws

DKRCC.PI.VM0.C2.02 | 4



References