User Guide for Pure Electric models including: 1152100-03-E - H, 1152100-13-J, 1467316-00-A, 1467316-00-B, 1152100-03-E - H Tesla Backup Gateway 2, 1152100-03-E - H, Tesla Backup Gateway 2, Backup Gateway 2, Gateway 2
Powerwall 3 Metering Compatibility Guide
Current Transformer Specifications WARNING: Before installing, disconnecting, and/or adjusting CTs, ensure the circuits being measured are not
POWERWALL 3 METERING COMPATIBILITY GUIDE Metering Option Table 1. Metering Overview for Powerwall 3 Systems Site (Service 100A) Powerwall 3 Solar Powerwall 3 N/A Yes (no installation / configuration required) Backup Gateway 2 Meter X Yes N/A Backup Gateway 2 Meter Y + Tesla Yes CT(s) N/A (not needed) NOTE: Neurio remote energy meters are not compatible with Powerwall 3. AC-Coupled Solar ( 100A) N/A N/A Yes 1 POWERWALL 3 METERING COMPATIBILITY GUIDE Backup Gateway 2 Meters Backup Gateway Compatiblity Backup Gateway 2.0 (1152100-03-E - H) Backup Gateway 2.1 (1152100-13-J) Backup Gateway 2.0 (1152100-03-E - H) Backup Gateway 2.1 (1152100-13-J) Meter Internal Primary Meter (Meter X) Internal Auxiliary Meter (Meter Y) Internal Auxiliary Meter (Meter Y) Compatible N/A (captive CTs) CTs Tesla 100 A CTs (Tesla P/N 1467316-00-A) Tesla 100 A CTs (Tesla P/N 1467316-00-B) NOTE: As indicated above, each CT is only compatible with the meter it is designed to be paired with. CTs cannot be used with any meter other than the one they are intended for. CT Capacity Gateway 2 Meter X: 80 A per phase / 100 A if using only one phase Gateway 2.0 Meter Y: 100 A Gateway 2.1 Meter Y: 100 A Possible Site, Conductor, None Monitoring Assignments Solar, Site, None Solar, Site, None Connection Methods (Meter to Gateway) Hardwired directly to Gateway 2 CTs connect directly to Gateway CTs connect directly to Gateway Clamshell 2 Clamshell 2 Clamshell Voltage Reference Identified and labeled within the Identified and labeled within the Identified and labeled within the Gateway 2. Voltage reference Gateway 2. Voltage reference Gateway 2 can be confirmed / referenced can be confirmed / referenced to the labeled Gateway terminals to the labeled Gateway terminals · CT 1 = L1 · CT 1 = L1 · CT 2 = L2 · CT 2 = L2 2 POWERWALL 3 METERING COMPATIBILITY GUIDE Backup Gateway Compatiblity Backup Gateway 2.0 (1152100-03-E - H) Backup Gateway 2.1 (1152100-13-J) Backup Gateway 2.0 (1152100-03-E - H) · CT 3 = L3 Backup Gateway 2.1 (1152100-13-J) · CT 3 = L3 Extension Length N/A (fixed position in Gateway) Premade Tesla 100 A CT extension (Tesla P/N 1467274-00-A): 3 m 0.5 mm2 or larger twisted pair conductors: max 100 m Premade Tesla 100 A CT extension (Tesla P/N 1467274-00-B): 3 m 0.5 mm2 or larger twisted pair conductors: max 100 m Splitting CTs N/A N/A (cannot be split / paralleled) N/A (cannot be split / paralleled) One 100 A CT per terminal One 100 A CT per terminal Optional N/A N/A N/A Accessories 3 POWERWALL 3 METERING COMPATIBILITY GUIDE Current Transformer Specifications WARNING: Before installing, disconnecting, and/or adjusting CTs, ensure the circuits being measured are not energized and the system is completely powered down. Failure to de-energize the system may compromise operator and equipment safety. Additionally, plug the CT into the terminal BEFORE clamping it around the conductor to be measured. Tesla 100 A CT Specifications Electrical Specifications Max Primary Current Operating Frequency Operating Temperature Range Max Operating Humidity (with condensation) Lead Length Cable Type Cable Ratings Cable Gauge 120 A 50 Hz 60 Hz -20°C to 50°C (-4°F to 122°F) RH 95% 800 mm Twisted leads 600 V, 125°C 22 AWG Mechanical Specifications 4Antenna House PDF Output Library 6.6.1307 (Windows (x64))