Installation Guide for smappee models including: EV Ultra Dual Charging Station, EV Ultra Dual, Charging Station, Station

Maarten Decock

Smappee EV Ultra Dual

EV Ultra Dual – Installation manual – English 4 . 1. Introduction . Thank you for purchasing this Smappee EV Ultra charging station for electric vehicles, the smartest


File Info : application/pdf, 35 Pages, 2.41MB

PDF preview unavailable. Download the PDF instead.

installation-manual ev-ultra-dual 2.01 en
Smappee EV Ultra Dual
Installation manual
English ­ 2.01 ­ November 2024

Document accuracy The specifications and other information in this document were verified to be accurate and complete at the time of its publication. Due to ongoing product improvement, this information is subject to change at any time without prior notice. For the latest information, see our online documentation: smappee.com/downloads
2

Table of contents
1. Introduction...................................................................................................................................... 4 2. Safety instructions ........................................................................................................................... 5 3. Overview of the EV Ultra................................................................................................................. 6 4. Preparing the installation............................................................................................................... 12 5. Installation and configuration ........................................................................................................ 20 6. Maintenance.................................................................................................................................. 30 Annexes ................................................................................................................................................ 32

EV Ultra Dual ­ Installation manual ­ English

3

1. Introduction
Thank you for purchasing this Smappee EV Ultra charging station for electric vehicles, the smartest DC charging station for businesses. This installation and user manual tells you how to install and use the Smappee EV Ultra. We advise you to read the contents of this manual carefully, to ensure a safe and proper installation and enable you to use all the advanced features of this product to the full.
Support
Only qualified electricians or equivalent may install the Smappee EV Ultra. If you have any questions, please contact your service partner. Please have the following information ready to hand to speed up the process: Article number and serial number which you can find on the identification label of the EV Ultra.

Should your local distributor be unable to help you, or you have a suggestion for us, you can contact Smappee at: support@smappee.com.
Smappee NV Evolis 104 8530 Harelbeke Belgium

EV Ultra Dual ­ Installation manual ­ English

4

2. Safety instructions
2.1. Safety warning
Fully read and follow the safety instructions below before you install, service or use your Smappee EV Ultra. The installer must ensure that the charging station is installed in accordance with the relevant national and local regulations. Carrying out activities on this charging station without the relevant knowledge and qualifications can lead to serious accidents and death. Only carry out tasks for which you are qualified and have been fully instructed. Incorrect installation, repairs or modifications can result in danger to the user and may void the warranty and liability.
2.2. Safety precautions
CAUTION Risk of electric shock. Refer to the accompanying documentation whenever you see this symbol.
Please observe the following safety precautions to avoid potential electric shock, fire, or personal injury:
· The charging station is intended exclusively for charging electric vehicles and, when installed correctly, may be used by untrained individuals.
· Switch off electrical power supply to your charging station before installation or maintenance work.
· Do not use the charging station if damaged / defective. · Do not immerse the charging station in water or any other liquids. · Do not expose the charging station to heat, flame or extreme cold. · Do not attempt to open, repair, or service any parts. Contact Smappee or your service partner for
further information. · Only use the charging station under the specified operating conditions. · Do not allow children to operate a charging station. · When a charging station is in use, adult supervision of any children present is required. · While charging the charging cable must be completely unwound and connected to the electric
vehicle without overlapping loops. This to avoid the risk of overheating the charging cable.
2.3. Keeping order
· After charging, store the charging cable properly so it does not present a tripping hazard. · Make sure the charging cable cannot become damaged (kinked, compressed or driven over). · Do not place any objects on the charging station.

EV Ultra Dual ­ Installation manual ­ English

5

3. Overview of the EV Ultra

3.1. Models

Charging stations

Article no. EVU-80D-C3-W EVU-80D-C3-B EVU-240D-C3-B EVU-240D-C3-W

EAN 5425036934955 5425036934368 5425036934382 5425036934986

Description
EV Ultra Black, Standalone, 2 connectors, 40kW per connector
EV Ultra White, Standalone, 2 connectors, 40kW per connector
EV Ultra Black, Standalone, 2 connectors, 120kW per connector
EV Ultra White, Standalone, 2 connectors, 120kW per connector

Anchor (to be ordered separately)

Article no.

EAN

Description

EVU-ANCHOR

5425036934450 EV Ultra mounting anchor

EV Ultra Dual ­ Installation manual ­ English

6

3.2. Directional determination

Image 1: Directional determination

Id Description

1

Front

2

Rear

3

Left

4

Right

5

Top

6

Bottom

3.3. Identification label

Position of the identification label of the EV Ultra The identification label of the charging station is located on the bottom of the front panel.

Image 2: Position of the identification label

EV Ultra Dual ­ Installation manual ­ English

7

Content of the identification of the EV Ultra

Image 3: Identification label

No. Description

1

Manufacturer's logo

2

Article number

3

Manufacturing date

4

IP rating

5

Electrical rating

6

Maximum DC output current

7

Maximum DC output voltage

8

Operating temperature

9

CE

10 Waste disposal symbol

11 Electric hazard symbol

12 Warning symbol

13 Manufacturer's data

14 QR code to scan during configuration of the charging station

15 Serial number

EV Ultra Dual ­ Installation manual ­ English

8

3.4. Technical specifications

Feature Physical properties Dimensions Charging unit weight (excluding packaging) Anchor Charging cable length Stationary / moveable External design Mounting method AC input Power supply Auxiliary power supply Rated voltage (Un) Rated frequency (Fn) Nominal input current
Power factor Efficiency Connection method Integrated protective measures DC output Charge mode DC Plug Connection case Maximum current Voltage Nominal power charging point
Nominal power charging station

Description
1870 x 920 x 325 mm EV Ultra 40D: 240 kg EV Ultra 120D: 340 kg 23 kg 3.25 m Fixed installation Enclosed assembly Ground mounted, with supplied anchor
3P + PE 5G2.5 mm² 400 Vac ± 10 % 50 Hz EV Ultra 40D: 120 A EV Ultra 120D: 350 A > 0.98 at full capacity 95% at full capacity AC, permanently connected Galvanically isolated inverters
Mode 4 (IEC 61851) CCS2 Case C (fixed cable) (IEC 61851) 500 A (boost mode) 100 V ­ 1000 V EV Ultra 40D: maximum 40 kW EV Ultra 120D: maximum 120 kW EV Ultra 40D: maximum 80 kW EV Ultra 120D: maximum 240 kW

EV Ultra Dual ­ Installation manual ­ English

9

Feature Interfaces & Connectivity Information status Session activation Connectivity
Communication protocol Metering Certifications and Standards Product certification Standards Environment Enclosure material Enclosure standard colours
IP rating Mechanical impact protection Pollution degree Electrical safety class Stand-by use Acoustic noise Environmental conditions Operating temperature Storage temperature Relative humidity Operating altitude Access

Description
6.5" RGB Disaplay QR code / RFID (Optional payment terminal) Ethernet 100BASE-T LTE Cat M1 (4G) OCPP 1.6 J, ready for update to OCPP 2.0.1 kWh meter compliant with IEC 62053-21
CE IEC 61851-21, ISO 15118, DIN SPEC 70121
Powder coated steel RAL 9016 (star white) + RAL 7021 (black grey) Optional customisation IP 54 IK 10 3 I 150 W 0 dB to 60 dB Indoor and outdoor use -25 °C to 50 °C (power derating from 40 °C) -25 °C to 70 °C 0 % to 95 %, non-condensing 0 to 2.000 m Locations with restricted and non-restricted access

EV Ultra Dual ­ Installation manual ­ English

10

NOTE The operating temperate assumes the ambient temperature of a product delivered in the default enclosure colours RAL 9016 (star white) or RAL 7021 (black grey). Direct exposure to sunlight may have an adverse effect on the temperature range.
NOTE If the product is exposed to lower or higher ambient temperatures, continuous operation cannot be guaranteed. If temperatures exceed the maximum values, the charging station will automatically decrease the charging current to decrease the internal temperature of the charging station. This stabilises the internal temperature and makes it less likely that a transaction will be unexpectedly paused.
NOTE If the product is directly exposed to sunlight, the automated temperature management may automatically start below the maximum ambient temperature. Therefore, wherever possible, avoid exposing the charging station to direct sunlight.
NOTE Where products are exposed to the elements of nature, the enclosure can be subject to gradual aging of the material, which can result in product discolouration over time. Therefore, wherever possible, place the product in a sheltered place to optimise the life of the materials.

EV Ultra Dual ­ Installation manual ­ English

11

4. Preparing the installation
First step is to prepare the physical installation of the EV Ultra as described in this chapter.
4.1. Installation prerequisites
· Calculate the existing electrical load to find the maximum operating current for the charging station. Note that with the Smappee Overload functionality more charging stations or the total maximum operating current can be higher than the physical installation allows.
· Obtain all necessary permits from the relevant local authority. · Refer to local wiring regulations to select the conductor sizes and use only copper or aluminium
conductors. · Make sure that the installation area of the charging station is adequate for usability and ventilation
purposes. · Use the correct tools and provide sufficient material resources and protection measures. · Route the power supply cables to the position where the EV Ultra will be installed together with an
Ethernet cable for the internet connection.
NOTE
Make sure that there is at least 100 cm power supply and 100 cm shielded CAT 6 cable length available at the location of the EV Ultra, to be able to connect it easily. For more information, refer to:
· Technical specifications on page 9 · Install the EV Ultra anchor on page 17
4.2. Power supply
· The correct cable section of the supply cable depends on the power rating and distance between the meter cabinet and the charging station. The voltage drop must not exceed 5%. It is advisable to have a maximum voltage drop of 3 %.
· The cable lugs that can be fitted have a width of maximum 35 mm. · The power supply trajectory from the circuit breaker panel up to the EV Ultra charging station
must be protected against short-circuiting and over-current with B or C circuit breakers (or otherwise in compliance with local standards and regulations) · A charging station must always be connected on a dedicated power circuit. · Route the power supply cables to the position where the charging station will be installed together with an Ethernet cable for the internet connection. · Make sure the power supply cables are positioned through the dummy plate of the EV Ultra anchor.
NOTE
All cables enter the charging station through the EV Ultra anchor.
· Local regulations may be applicable and can vary depending upon the region or country.

EV Ultra Dual ­ Installation manual ­ English

12

4.3. Lifting supplies (not included)
· Crane · Suitable lifting accessories (four lifting eyes are included)
4.4. Tools (not included)
· Screwdrivers · Hex keys (2.5 mm, 10 mm) · Torx key (T30) · Torque wrench · 13 mm socket wrench with ratchet handle (for anchor) · 17 mm socket wrench with ratchet handle · Wire stripper and cutter · Needle-nose pliers · Cable lugs M10 with a maximum width of 35 mm · Multimeter and earth ground meter · RJ45 crimping tool
4.5. Supplies (not included)
· Shielded CAT 6 Ethernet cable and two RJ45 connectors for internet access · Power supply cables · Spray with airtight material such as polyurethane foam
4.6. Transport, storage and unboxing the EV Ultra
Transport and storage
· Disconnect electrical power supply before removing the charging station for storage or relocation. · Only transport and store the charging station in its original packaging. No liability for damage
incurred will be accepted if the charging station is transported in non-standard packaging. · Store the charging station in a dry environment within the temperature range specified in the
technical specifications.
Unboxing The EV Ultra is delivered standing on a euro pallet. First remove the cardboard packaging. Keep in mind to store the cardboard, as this can be used to safely store loose panels while installing the EV Ultra.

EV Ultra Dual ­ Installation manual ­ English

13

4.7. Prepare the foundation of the EV Ultra
Assemble the EV Ultra anchor The Smappee EV Ultra is designed to be installed at ground level using the supplied anchor. It is mandatory to use this anchor.
NOTE Only top and bottom of the anchor are specified. There is no specified front or back on the EV Ultra anchor.
To guarantee compact transportation, the anchor is supplied in a kit and needs assembling. Follow these instructions to assemble the different parts. 1. Disassemble the anchor kit and separate each part.

Image 4: Parts of the EV Ultra anchor kit
2. Assemble the plates to the anchor.

Image 5: View on the anchor assembly

EV Ultra Dual ­ Installation manual ­ English

14

ID

Description

1

Small side plate

2

Wide side plate

3

Bottom plates

4

Fasteners

More information
The left and right plate are the same and have slotted holes. The front and rear plate are the same and have hooks to slide in the slotted holes. These four plates have a bolted connection to the side plates. Tighten the bolted connection manually during this assembly step.

3. Put the dummy plate on top of the anchor. The six studs at the bottom of the dummy plate each fit into a hole in the anchor.

Image 6: View on the dummy plate
4. Tighten the nuts for the dummy plate and the four bottom plates.

Image 7: View on the fasteners

EV Ultra Dual ­ Installation manual ­ English

15

5. If necessary, remove the round cut-outs. This can be useful for better fixation of the anchor and for connections to other EV chargers.
Image 8: View on the cut-outs
As a result, the anchor is ready for installation.

EV Ultra Dual ­ Installation manual ­ English

16

Install the EV Ultra anchor
NOTE
To keep the dimensions of the EV Ultra during the installation of the anchor, there is a dummy plate attached to the top of the anchor. The anchor itself is symmetrical, or in other words, you can select which longest side will be the front..
NOTE
Think about accessibility and usage of the charger for the driver: For example, placed lengthwise in the middle of 2 parking spots.
Make sure that there is sufficient space around the charging station for service and maintenance operations as specified in the IEC 60204-1 standard. This also let adequate airflow for normal operation of the charging station.
NOTE
When dimensioning the foundation, it is advisable to carry out a static load capacity analysis according to the relevant standards.
A stable and level ground needs to be prepared in advance. We advise a levelled concrete foundation at ground level minus the height of the anchor (705 mm).
To correctly install the EV Ultra anchor: 1. Make a foundation hole large enough to accommodate the anchor. 2. Flatten the bottom of the foundation hole by creating a foundation layer made of a dry mixture of
sand and cement. The minimum dimensions of this foundation layer are 450 mm by 750 mm. This is a bit larger than the dimensions of the anchor, to make sure a stable foundation is created. 3. Reinforce the corners of the foundation layer by placing concrete blocks on the foundation layer at the points where the corners of the anchor will be. Make sure the concrete blocks are level in both directions. If not, adjust until level. 4. Place the EV Ultra anchor on the concrete blocks. If needed, the anchor can be fixed to the concrete blocks by screwing a bolt in each corner of the anchor (hole diameter 16 mm).

Image 9: View on the anchor fixation

EV Ultra Dual ­ Installation manual ­ English

17

5. Route all necessary cables through the anchor. The final location of all cables may already be taken into account here (see picture below).

Image 10: View on the cables

ID Description

More information

1

Power supply cables

For the three phases (L1, L2, L3) and a protective

earth (PE) to the inverters.

They will be connected at the rear of the EV Ultra,

refer to page 24.

2

Auxiliary power supply cable For the internal electronics of the EV Ultra

3

Ethernet cable

For internet connectivity of the EV Ultra

6. Shorten the power supply cables for the inverters to the correct length using a cable cutter. Attach a cable lug over the four shortened cables. Use cable lugs M10 with a maximum width of A = 35 mm.

Image 11: View on the connection point of the power supply cables

EV Ultra Dual ­ Installation manual ­ English

18

7. Fill the anchor (A) with concrete (C) until half of the anchor is filled with concrete. It is normal that some excess concrete pours out of the holes. Use this excess to further fix the anchor to the foundation.
Image 12: View on the installed anchor
Wait for the concrete to cure before going to the next steps.

EV Ultra Dual ­ Installation manual ­ English

19

5. Installation and configuration
CAUTION The installation must be carried out by a qualified professional who has read this manual and works in compliance with IEC 60364 standards. Neglecting this may lead to severe injuries or hazardous situations while working with electricity.
CAUTION The electric system must be entirely disconnected from every power source prior to performing installation or maintenance work. Make sure it is not possible to connect the electric current during installation. Put up caution tape and warning signs to mark the work areas. Make sure no unauthorised people can enter the work areas.
CAUTION Hazardous electrical voltages are present in the EV Ultra (up to 1000 V).
CAUTION The charging station contains electric components that may still contain electrical charge after being disconnected. Wait at least 10 seconds after disconnection before commencing work.
CAUTION Adaptors or conversion adaptors and cord extension sets are not allowed to be used.
CAUTION The EV Ultra contains components and circuits boards sensitive to electrostatic discharge. Sufficient electrostatic discharge measures should be taken to protect the components during installation and maintenance.
CAUTION Components of the EV Ultra can be very heavy, for example the inverters.
CAUTION Take care that components don't squeeze a human body or body part while assembling or disassembling.

EV Ultra Dual ­ Installation manual ­ English

20

This procedure describes the required steps for the physical installation of the EV Ultra. 1. Prepare the EV Ultra for lifting (page 21) 2. Position the EV Ultra (page 23) 3. Attach the EV Ultra (page 24) 4. Connect the power supply to the inverters (page 24) 5. Connect the auxiliary power supply (page 25) 6. Connect the EV Ultra to the internet (page 26) 7. Start the power supply to the inverters (page 28) 8. Complete the installation (page 28) 9. Configure the EV Ultra with the Smappee App (page 29)
5.1. Prepare the EV Ultra for lifting
The EV Ultra is delivered standing on a euro pallet. To position the EV Ultra, do the following: 1. Remove the dummy plate from the top of the anchor.
This dummy plate was used during the installation of the anchor, but is not longer necessary. 2. Remove the cardboard packaging. 3. Attach the lifting eyes on the top of the EV Ultra.
Image 13: View on the lifting eyes
The lifting eyes are in the included accessory box. The four M10 bolts that hold the top plate, can be removed without tools. Make sure you keep the bolts and rubber washers. 4. Put a little tension on the lifting loops, to prevent the EV Ultra from falling over. Use a suitable crane and lifting loops with carabiners.

EV Ultra Dual ­ Installation manual ­ English

21

5. Remove the rear plate (A) and side plates (B, C).
Image 14: View on the plates
The rear side of the EV Ultra is the side without the Smappee logo. Put the plates in a safe location where they cannot be scratched or damaged. 6. Remove the plates (P) that hold the EV Ultra on the euro pallet. The bolted connection can be loosened with a 17 mm key for the hex nut at the top and a 10 mm key for the hexagon socket screw at the bottom.
Image 15: View on the bottom

EV Ultra Dual ­ Installation manual ­ English

22

5.2. Position the EV Ultra
Instructions 1. Lift the EV Ultra with the crane. 2. Put a screw (M8 x 40) in each threaded hole.
These screws will be used to align the EV Ultra with the anchor.
Image 16: View on the alignment screws
3. Move the EV Ultra with the crane above the anchor.
Image 17: View on the position
Make sure that all cables go through the opening, while keeping the final position. Make sure no cable can be crushed during lowering the EV Ultra.

EV Ultra Dual ­ Installation manual ­ English

23

5.3. Attach the EV Ultra
Instructions 1. Put the other fasteners to connect the EV Ultra to the anchor.

Image 18: View on the attachment points
2. Tighten the fasteners manually to prevent the EV Ultra from falling over. 3. Remove the tension from the lifting loops. 4. Tighten the fasteners to a torque of 40 Nm. 5. Remove the lifting loops. 6. Replace the eye bolts on top of the EV Ultra again with the four originally fitted bolts.
Make sure a washer of rubber is still fitted around each bolt to prevent water seeping into the charging station. Do not use more than 8 Nm of torque.
5.4. Connect the power supply to the inverters
Context The power supply to the inverters is used for the DC charging.

Image 19: View on the power supply to the inverters

EV Ultra Dual ­ Installation manual ­ English

24

Instructions Proceed as follows. 1. Loosen the two screws from the plastic cover with a cross-head screwdriver. 2. Remove the plastic plate from the load break switch. 3. Connect the three phase cables to the load break switch and the PE cable to the left bus bar. 4. Tighten the bolted connections to a torque of 42 Nm. 5. Put the plastic cover back on the load break switch.
5.5. Connect the auxiliary power supply
Context The auxiliary power supply is used for power supply to the AC-parts of the charging station that doesn't need high power for DC-charging.

Image 20: View on the auxiliary power supply

ID

Description

L1

Brown conductor

L2

Black conductor

L3

Grey conductor

N

Blue conductor

PE Green/yellow conductor

More information The three phases go into the internal 3P 10 A circuit breaker.
The neutral (N) and protective earth (PE) conductor go into the terminal blocks.

Instructions

Proceed as follows.
1. Shorten the 5G2.5 mm² cable to the necessary length. 2. Put each conductor in the corresponding connection opening.
Make sure each conductor goes to the indicated connection opening.

EV Ultra Dual ­ Installation manual ­ English

25

5.6. Connect the EV Ultra to the internet
Context CAUTION Risk of electric shock. Make sure no tools are in the charging station and persons stand free from the charging station.
Instructions Proceed as follows. 1. Put the Ethernet cable in the open WAN port on the bottom right side of the router.
Image 21: View on the left side
A router creates a small, private network within the EV Ultra to provide network connectivity for all components. This private network is created within the subnet 192.168.37.0. There is a 4G connection configured as backup, in case of failure of the wired internet connection. 2. Make sure that the circuit breaker is set to the on position. 3. Start the power supply to the auxiliary power supply cable. 4. Check the status of the components after approximately 30 seconds.

EV Ultra Dual ­ Installation manual ­ English

26

Image 22: View on the left side and right side

ID

Description

1

Smappee Power Box

2

Smappee Connect

3

Router

More information Flashing 1 time per 3 seconds Blue flashing, 1 time per second Signal strength indicator

EV Ultra Dual ­ Installation manual ­ English

27

5.7. Start the power supply to the inverters
Context
CAUTION Risk of electric shock. Make sure no tools are in the charging station and persons stand free from the charging station.
Instructions Proceed as follows. 1. Make sure that the load break switch is set to the on (I) position. 2. Start the power supply to the power supply cable. 3. Complete the installation.
5.8. Complete the installation
Context
CAUTION Risk of electric shock. Switch off electrical power supply to your charging station before installation or maintenance work.
Instructions Proceed as follows. 1. Fill the opening between the anchor and charging station with an airtight material such as
polyurethane foam. This is to prevent the overpressure from the cooling fans escaping into the ground, to stop small animals from entering the charging station via the ground and to avoid moisture problems. 2. Put the rear plate back. 3. Configure the EV Ultra with the Smappee App (page 29). 4. Put the side plates back.

EV Ultra Dual ­ Installation manual ­ English

28

5.9. Configure the EV Ultra with the Smappee App
Prerequisites The EV Ultra must be commissioned. This procedure is done with the Smappee App. You can download this mobile app from the Apple App Store for iOS or the Google Play store for Android phones.
Image 23: Download the Smappee App
Instructions 1. For the installation of the first Smappee product, go to Home > + button > I want to install a
Smappee charging station. For the addition of an EV Ultra to an exisiting Smappee location, go to Settings and then: · For a first installation to this location: Install a Smappee EV Line charging station · For an additional charging station at this location: Your charging stations > Plus button 2. Follow the steps shown in the Smappee App. 3. Put the side plate back, refer to Complete the installation (page 28). Post-requisites The Name and Maximum power for each connector of your charging station can be adjusted in the Smappee App or the Smappee Dashboard. For more information, refer to the EV Ultra training on Smappee Academy.

EV Ultra Dual ­ Installation manual ­ English

29

6. Maintenance
For a safe and regular operation of the EV Ultra, regular maintenance or control is required. Refer to the table below for the intended maintenance work and interval. All points in the table are considered mandatory and must be carried out by a certified technician. Before starting maintenance activities, consider all safety precautions as listed in: · Safety instructions (page 5) · Installation and configuration (page 20)
6.1. Maintenance
· Observe the maintenance schedule in the table below. · Clean the outside only with a dry, clean cloth. · Do not use abrasive agents or solvents. · May not be carried out during rain or if air humidity exceeds 95%.
WARNING Fully read and follow the safety instructions below before you install, service or use your EV Ultra. Incorrect installation, repairs or modifications can result in danger to the user and may void the warranty and liability.

Maintenance task Interval

More information

Check the compliance. Every maintenance activity Refer to local regulations and standards.

Check the visual state
Replace the charging cable.

Every maintenance activity
After 10000 charging cycles or if damaged

Do a functional test of the load break switch.

Every maintenance activity

Do a visual inspection of Yearly the overvoltage fuse to each inverter.

Do a functional test of the overvoltage circuit breaker of the auxiliary power supply.

Yearly

Verify the protective measures.

Yearly

Check the tightening torque of bolts.

Yearly

If necessary, replace worn parts
Article number: 30-0206
Set the load breaker switch to off. Check that there is no power supplied to the inverters. If necessary, replace the load breaker switch. Stop the power supply before you open the charging station fuse holder. Do a visual inspection of each fuse. If necessary, replace the fuse. Article number: 100-0076 Set the switch to off. Check that there is no power supplied. If necessary, replace the overvoltage circuit breaker. Article number: 260-0039 With the charging station switched off, check the resistance between the ground and all externally accessible parts. This can be housing, screws and other parts. With stopped power supply to the charging station, check the tightening torque of the load break switch bolts (6x:

EV Ultra Dual ­ Installation manual ­ English

30

Maintenance task Interval

Check for cleanliness and condensation

Yearly

Ventilation filters

Yearly

6.2. Inverter fault codes

More information
for each phase cable, before and after the load break switch). Also do a visual inspection of the connection of the cables to the bus bar. The marker on the bolt must be aligned with the marker on the bus bar. Stop the power supply before you open the charging station. If necessary, clean with a dry, clean cloth. Do not use abrasive agents or solvents. If necessary, replace the sealant of the openings. Refer to page 28. Replace the filters of the EV Ultra with article numbers: 100-0102 back top 100-0103 back bottom 100-0104 inverter outlet

Fault code E02 E03 E05 E06
E07 E09

Analysis Fan blocked Air duct blocked AC input voltage is not in the normal range
Module positive and negative pole short circuit
Module output voltage exceeds the set output overvoltage value
Address conflict
The difference between the module current and average current is too large

Solution Remove the object that prevents the fan. Remove the object that blocks air duct or clear dust.
Ensure AC input voltage is in the normal range
Power off the control module, check whether the positive and negative poles on the output circuit are short circuited, and reboot after confirming that there is no short circuit. If alarm persists, replace control module. Power off the control module, check whether the module output voltage has been changed, and check that the module output voltage is less than the set module output overvoltage value. And then, reboot after pulling out the control module, if alarm persists, replace control module. Reboot the charging station. If the error persists, contact support. Check the control module communication, check the connection of the communication cable. If the communication is good and alarm persists, replace the control module.

EV Ultra Dual ­ Installation manual ­ English

31

Annexes
Performance graphs EV Ultra Dual
The following graph shows the DC output power for a charging point, related to the AC input line voltage. No DC output power is produced if the AC input voltage is below 285 V or above 475 V. Small variances in the normal AC input voltage (for example between 400 V and 410 V) will not cause any change in de DC output power.
Power limiting curve

DC output power [kW]

AC input line voltage [V]
Charging point EV Ultra 40D Charging point EV Ultra 120D

EV Ultra Dual ­ Installation manual ­ English

32

The following graph shows the maximum output current for a charging point as a function of the output voltage. The output voltage is determined by the vehicle's battery, where most vehicles require voltages of approximately 400 V or 800 V. The Smappee EV Ultra can provide voltages between 100 V and 1000 V.
Maximum output current curve

Maximum output current [A]

Output voltage [V]
Charging point EV Ultra 40D Charging point EV Ultra 120D

EV Ultra Dual ­ Installation manual ­ English

33

Power derating graph EV Ultra Dual
The following graph shows the decrease in power output per charging point as a function of temperature increase in the inverters of the different EV Ultra.
Power derating

Power [kW]

Temperature [°C]

EV Ultra Dual ­ Installation manual ­ English

34

Declaration of conformity

EV Ultra Dual ­ Installation manual ­ English

35



References

Adobe PDF Library 24.4.48