AntSpace HK3 Liquid Cooling System Operation and Maintenance Manual
ANTSPACE HK3 Liquid Cooling System Operation and Maintenance V1.3
ANTSPACE HK3
V2/V3/V5
Liquid Cooling System Operation and Maintenance Manual

Catalogue
1. Summary of the ANTSPACE HK3 2. Composition and Working Principles of the ANTSPACE HK3 3. Main technical specification of the ANTSPACE HK3 4. Structural view of ANTSPACE HK3 5. Use and Operation of ANTSPACE HK3 6. Common faults and troubleshooting methods of ANTSPACE HK3 7. Maintenance of ANTSPACE HK3 8. Safety instructions of ANTSPACE HK3

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

1. Summary of the ANTSPACE HK3

ANTSPACE liquid cooling system aims to continuously provide coolant that meets the requirements of pressure,

temperature and flow rate for the internal heat dissipation unit of mining machine, and ensure a good working environment

for load. There are two heat dissipation forms for the ANTSPACE liquid cooling system: evaporative cooling (cooling

tower) or water-water heat exchange (plate heat exchanger). The internal cooling medium can choose the legitimate brand

antifreeze or purified water according to the local ambient temperature.

2. Composition and Working Principles of the ANTSPACE HK3

2.1 Composition of the system

Table 2-1 Major components of ANTSPACE liquid cooling system

Components Pump station
Cooling tower
Electric cabinet
Network system and PDC
Water separator assembly Fitting
2.2 Working principles

Functions of components To transport and monitor the status of coolant to maintain stable operation of the system To transfer heat from the load to the atmosphere To control the operation of each component of the pump station, read and upload the numerical display of each sensor Distribution of network and power for mining machine
Distribution and delivery of flow
Supporting parts and accessories for container water cooling system

Main parts Centrifugal pump, expansion vessel, sensor, valve, exhaust valve, filter, pipeline and other related accessories Spray pump, cooler, air inlet grill, fan and other related accessories
Air switch, intermediate relay, programmable logic controller (PLC), switch power supply, touch screen and other related accessories
Circuit breaker, aviation connector, cable, switch and other related accessories Water distributor, elbow, hose, chuck, valve and other related accessories Screw, miniature circuit breaker, aviation plug, clamp, rubber hose and other related accessories

The pump station provides two ways of coolant with temperature, pressure, flow rate and medium to meet the requirements

to the water distributor assembly, the water distributor conveys the coolant to the water cooling plate after two stages of

liquid distribution, and the water cooling plate takes away the heat inside the equipment; the coolant after heating enters

the cooling tower and the outside air for forced heat exchange, or enters the plate heat exchanger and the outside cold

source for cold exchange, and the coolant after cooling is again conveyed to the water cooling plate through the pump

station and the water distributor assembly. The coolant after cooling enters the cooling tower and the outside air for forced

heat exchange or enters the plate heat exchanger and the outside cold source for heat exchange.

- 1 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance The working principle of Dry-Wet Combined Type Air Cooling Tower is divided into dry working condition and wet working condition. Its working principle under wet condition is as follows: The cooling tower takes water and air as the cooling medium, and USES partial evaporation of cooling water to take away the heat generated by cooling fluid flowing in the coil. Inside are: spray device, snake type condensing coil, (packing heat exchange layer) water remover, bottom set water tray. The outside of the box is equipped with a circulating pump and an axial fan on the side of the condensing coil. During operation, the cooling water is sent from the pump to the upper part of the condenser coil and the liquid condensed by the cooling water outside the tube flows from the lower part of the condenser coil And out the other. After absorbing the heat from the refrigerant, some of the water is evaporated into water vapor, which is sucked up by the axial fan and discharged into the atmosphere. The cooling water that has not evaporated falls on the lower collector plate, which is used for recycling by the water pump. The axial circulating fan is drawn by the top to strengthen the air flow, the negative pressure in the water tank, to reduce the evaporation temperature of water, to promote the evaporation of water film, and to strengthen the heat release of the condensing coil. The role of the water eliminator is to block unevaporated water droplets in the air and make It leaves the water tray to reduce the consumption of cooling water. In addition, the float ball valve is also set in the water pan. When the water is continuously evaporated, the float ball valve will open automatically, providing supplementary cooling water. The working principle under dry working condition is to force the higher temperature coolant from the water cooling plate to exchange heat with the low-temperature air, and the coolant after reducing the water temperature enters the system again through the pump set for heat dissipation.
- 2 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Figure 2-1 Schematic diagram of ANTSPACE liquid cooling system - 3 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

Summary of functions of valves in schematic diagram

No.

Name

Function

1.

1#ball valve

Drain of Liquid separator

State Closed

Remark

2.

2#ball valve

Drain of Main pipeline

Closed

3.

3#ball valve

Drain of Main pipeline

Closed

4.

4#ball valve

The safety valve can be closed for maintenance in case of safety valve

Open

failure

Closed(Pressurization)

5.

5#ball valve

The valve at the front end of the make-up filter shall be closed during filter maintenance

Open

6.

6#ball valve

The liquid can be added to the tank after opening this valve after opening this valve

Closed

7.

7#ball valve

The liquid can be added to the system after opening this valve

Open

8.

8#ball valve

The tank is connected with the system and can automatically replenish or discharge liquid after opening this valve

Open

After opening this valve, the external liquid can be replenished to the

9.

9#ball valve

inside of the system / tank during liquid filling; When discharging

Closed

liquid, the liquid inside the tank can also be discharged

10.

10#ball valve

The expansion vessel can be serviced by closing the valve

Open Closed(Pressurization)

11.

11#ball valve

The exhaust valve on the top of degassing tank can be serviced by closing the valve

Open

12.

12#ball valve

The exhaust valve can be serviced by closing the valve

Open

13.

13#ball valve

The Y-filter can be serviced by closing the valve

Closed

14.

1# butterfly valve

When the ambient temperature is low, open this valve to reduce heat exchange

The valve of the water separator on the left side of the return liquid 15. 2# butterfly valve shall cooperate with 4# butterfly valve to isolate the water separator

assembly on the left side

The valve of the water separator on the right side of the return liquid 16. 3# butterfly valve shall cooperate with 5# butterfly valve to isolate the water separator

assembly on the left side

Closed Open Open

The valve of the water separator on the left side of the liquid supply is 17. 4# butterfly valve matched with 2# welded butterfly valve to isolate the water separator
assembly on the left side The valve of the water separator on the right side of the liquid supply 18. 5# butterfly valve is matched with 3# welded butterfly valve to isolate the water separator assembly on the left side Due to this liquid supply valve, the ANTSPACE cooling system is independent, and closing the valve can facilitate the movement of the 19. 6# butterfly valve system. In addition, when cooperating with 8# welded butterfly valve to maintain the filter, the system does not need to discharge a large amount of liquid Due to this return valve, the ANTSPACE cooling system is 20. 7# butterfly valve independent. Closing the valve can facilitate the movement of the system

Open Open Open Open

Due to this liquid supply valve, the cooling tower is independent, and

21.

8# butterfly valve

closing the valve can facilitate the movement of the system. In addition, when cooperating with 8# welded butterfly valve to maintain

the filter, the system does not need to discharge a large amount of liquid

22.

9# butterfly valve

Due to this return valve, the cooling tower is independent. Closing the valve can facilitate the movement of the system

The water pump suction pressure gauge can judge whether the water 23. 1# Pressure gauge pump suction pressure ( 0.1MPa) is normal, and check whether the

water pump suction pressure sensor is normal

Open Open
/

The outlet pressure gauge of the water pump, together with 1# pressure

24.

2# Pressure gauge

gauge, can analyze whether the operating condition of the water pump is consistent with the design condition (the difference is the pump head

/

at this time)

- 4 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

The pressure gauge of main liquid supply pipeline shall cooperate with

25. 3# Pressure gauge 2# pressure gauge to analyze whether the outlet pressure of water pump

/

is normal and whether there is fault in the system

The pressure gauge of the left branch pipe for liquid supply, together

26. 4# Pressure gauge with 6# pressure gauge, can analyze whether the flow resistance of the

/

left water separator assembly is normal

The pressure gauge of the right branch pipe for liquid supply, together

27. 5# Pressure gauge with 7# pressure gauge, can analyze whether the flow resistance of the

/

right water separator assembly is normal

The pressure gauge of the left branch pipe for liquid supply, together

28. 6# Pressure gauge with 4# pressure gauge, can analyze whether the flow resistance of the

/

left water separator assembly is normal

The pressure gauge of the right branch pipe for liquid supply, together

29. 7# Pressure gauge with 5# pressure gauge, can analyze whether the flow resistance of the

/

right water separator assembly is normal

3. Main technical specification of the ANTSPACE HK3

Table 3-1 System performance indicators

No.

Description

Indicators

Remarks

Environmental indicators

Working temperature
1. Working temperature

2.

Working humidity

-3540 540 1090%

Outdoor
IndoorThe temperature range can be controlled by adjusting the
fan

3.

Storage temperature

-3570

4.

Storage humidity

595%

5.

Height above sea level

2000m

Container Specifications

1.

Dimensions (L*W*H) (mm)

6058×2438×2896

2.

AntMiner capacity

210 units -S19 Hydro Series

3.

Container Certification

CCS

NFPA 79:2021V2 version

UL 508A:2018 R8.21V2 version

4.

Safety Certification

CSA C22.2 No. 14-18V2 version ANSI/ISO 12100:2012V2 version

2014/35/EUV5 version

2006/42/ECV5 version

5.

Operating Power (kW)

10471050

Excluding cooling tower power consumption

6.

Input voltage and frequency

415V±5%/60HzV2 version 400V±5%/60HzV3/V5 version

7.

Transport Weight(t)

8

Excluding miner and coolant

8.

Operating Weight(t)

12

Including miner and coolant

- 5 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

9.

PDU main switch capacity (A)

10.

Rated Current (A)

11.

Rated Power (kW)

12.

Max Power (kW)

13.

Rated Current per PDU (A)

14.

Connection Interface Cooling Tower

15.

Connection Interface (Heat Exchange Interface)

16.

Flow Rate (m³/h)

1200AV2 version 1250AV3/V5 version
952
1047
1050
10
DN125GB/T 9119-2010 PN16 DN125
DN100GB/T 9119-2010 PN16 DN100 85

The container contains two power distribution cabinets, each with a
1200A (UL)/1250A(CE)main switch.
The rated current of each distribution cabinet in the
container is 952 A.
Excluding cooling tower power consumption
Excluding cooling tower power consumption
The container contains two power distribution cabinets, each with a
1200A (UL)/1250A(CE)main switch.

Cooling Tower Specifications

1.

Type

Dry-Wet Combined Type Air Cooling Tower

2.

Dimensions (L*W*H) (mm)

6058×2438×2896

Excluding cage ladder

3.

Heat Dissipation Capacity (kW)

1000

4.

Outlet Temperature

35±1

@ 28 Wet Bulb Temperature

5.

Container Certification

CCS

NFPA 79:2021V2 version

UL 508A:2018 R8.21V2 version

6.

Safety Certification

CSA C22.2 No. 14-18V2 version ANSI/ISO 12100:2012V2 version

2014/35/EUV5 version

2006/42/ECV5 version

7.

Operating Power (kW)

14~28

8.

Transport Weight(t)

7t

9.

Operating Weight(t)

10.

Connection Interface (Container)

11.

Water Resupply Hose Interface

12t
DN125GB/T 9119-2010 PN16 DN125
DN40Internal thread

12.

Drain Hose Interface

DN65Internal thread

13.

Noise Level @25, 16m

70dBA

14.

Water Consumption

11.5m³/h

- 6 -

4. Structural view of ANTSPACE HK3

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

4.1 External view of ANTSPACE Liquid Cooling System
Dry and wet closed cooling tower

Water-cooled container

Cable inlet hole

Automatic exhaust valve

Exhaust fan
Liquid return inlet

Liquid supply inlet

Figure 4-1-1 External view 01 of ANTSPACE liquid cooling system

Ladder for the protective cage

Fence

Face recognition
- 7 -

Air inlet side of the cooling tower Air inlet side of the container

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

Figure 4-1-2 External view 02 of ANTSPACE liquid cooling system 4.2 Internal view of ANTSPACE Liquid Cooling System

Container

Shelf and water separator assembly PDC

Pump set

Three stage water separator for liquid supply

Figure 4-2-1 Internal view 01 of the container

Three stage water separator for liquid return
Shelf components
Two stage water separator for liquid supply
Two stage water separator for liquid return

Figure 4-2-2 Internal view 01 of the water separator assembly - 8 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

Shutter
Emergency button

Access control switch Mounting plate for face recognition Lighting switch

Figure 4-2-3 Internal view 01 of the front door of the container

NO.8 Ball Valve

Liquid filling pump NO.9 Ball Valve

Safety valve

NO.4 Ball Valve

NO.7 Ball Valve

NO.6 Ball Valve
Figure 4-2-4 Internal view 01 of the pump station

The status and functions of common valves are summarized as follows:

4#ball valve(open)The safety valve can be closed for maintenance in case of safety valve failureIt is normally open

except that it is closed during pressurization.

6#ball valve(closed): The liquid can be added to the tank after opening this valve after opening this valve.

7#ball valve(open): The liquid can be added to the system after opening this valve.

8#ball valve(open): The tank is connected with the system and can automatically replenish or discharge liquid after opening

this valve.

- 9 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance 9#ball valve(closed): After opening this valve, the external liquid can be replenished to the inside of the system / tank during liquid filling; When discharging liquid, the liquid inside the tank can also be discharged.

Figure 4-2-5 Internal view 02 of the pump station

Y-type filter

NO.3 Ball Valve

NO.8 Ball Valve

Y-type filter

NO.7 Ball Valve

NO.6 Ball Valve

NO.9 Ball Valve

Figure 4-2-6 Internal view 03 of the pump station

Safety valve

NO.4 Ball Valve
11

- 10 -

Manual liquid filling inlet
High Level Switch Low Level Switch

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Automatic breathing valve Make-up water tank Liquid indicator

Figure 4-2-7 Internal view 04 of the pump station

Main Switch

Frequency converter

Temperature Sensor Thermal Relay

PLC Contactors

Figure 4-2-8 Internal view 01 of ECC - 11 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Main Switch PSD
Switches Circuit breaker
Figure 4-2-9 Internal view 01 of PDC 5. Use and Operation of ANTSPACE HK3 5.1 Safety regulations 5.1.1 A symbolic distinction indicating the degree of danger " " is the logo for electrical charge. It is forbidden to open the cover plate with the logo. 5.1.2 Precautions for operation 1 Filtered coolant should be used as the cooling medium, and there should be no floating objects, or particles in the liquid supply circulation system. Note: the cooling medium should use the coolants produced by manufacturers. It is not allowed to make them with different substances by yourself. Otherwise, we will not be responsible for any problems. It is recommended to choose organic coolants. Inorganic coolants contain phosphorus, silicon, boron, molybdenum, nitrate, etc., which will generate precipitate over a long time. The recommended manufacturers for coolants: Great Wall brand, Shell brand, etc. 2 When the ambient temperature is below 0 , the water in the sump and spray pipeline must be completely discharged to prevent icing damage to the equipment. 3 The equipment should not be wired without permission, and it is forbidden to be used in parallel with other equipment.
- 12 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance 4 If the equipment has abnormal conditions (such as burning smells, etc.), it should be shut down, disconnected from the power supply, and checked. 5 There is an emergency stop on the entry door and on the door of electric cabinet A and B, when an emergency occurs, press the emergency stop, then the power circuit breaker will be disconnected immediately.After the emergency is reset, turn the main circuit breaker to the OFF position before power on the switch again
Emergency Stop Button
Figure 5-1-1 Emergency stop button 6 The Circuit breaker MCB-A1 only can de-energize PDC A. 7 The Circuit breaker MCB-A2 only can de-energize PDC B.
MCB-A2
Figure5-1-2 MCB-A2 8 The Circuit breaker MCB17 only can de-energize control cabinet ; 9 In order to prevent hazards, when a single computing unit is repaired, disconnect with the corresponding power supply of
- 13 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance the computing unit in PDC, disconnect with the corresponding network cable, water supply of the computing unit, and finally disconnect with the power supply of the computing unit. To power off the entire container, perform the following steps: a First, 210 computing units are disconnected.
Figure 5-1-3 Schematic diagram of the air switch of a PDC b After 10 seconds, disconnect the main power supply of the control device.
Main power supply of the control device
Figure 5-1-4 Schematic diagram inside the ECC - 14 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance c Disconnect the main switch of the two PDC. Note: The lighting circuit of the container is led from the main PDC. Bring a portable lighting lamp with you if you want to perform the above operation.
Figure 5-1-5 Schematic diagram of the main air switch of PDC d Disconnect the main switch at the transformer end if necessary. Be reminded that the sequence for switch off should be strictly conducted in accordance with the above requirements. 10 Do not open the protective cover on the fan. 11 Do not operate the device with wet hands; otherwise, electric shock may occur. It is forbidden to put sundries inside the unit to ensure that the fire passageway is always unblocked. Note: If the equipment does not work over a long time, disconnect the main power supply. 5.2 Pressure test of the system Preparation for the pressure test: 1 Get hoses and air pumps ready; (Recommended brand: Outstanding, model 2200w-40L; Selection basis: The internal
volume of the system is about 1.5m3/h, and the corresponding exhaust volume air pump is selected according to the time requirements; the maximum output air pressure is more than 8bar, and 10bar is the best) 2 Connect the external pipeline according to the ANTSPACE field installation manual. 3 Check if the automatic exhaust valves or the ball valves on the internal and external pipes of the container are closed. Screw the top nut of the automatic exhaust valve to open/close the automatic exhaust valve. (See Figures 6-2-1 through 6-2-4).
- 15 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

NO.2 Air Vent Valve

NO.1 Air Vent Valve

Automatic breathing valve

Figure 5-2-1 Pump station - automatic exhaust valve

Status of closing: The vent of the automatic exhaust valve is blocked with a plug.

Status of opening: The vent of the automatic exhaust valve is unblocked.

Figure 5-2-2 Schematic diagram of opening and closing of automatic exhaust valve - 16 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Automatic exhaust valve

Figure 5-2-3 External connecting pipelines - automatic exhaust valve

Status of opening: the handle of ball valve is parallel to the pipeline.

Status of closing: the handle of ball valve is perpendicular to the pipeline.

Figure 5-2-5 Schematic diagram of opening and closing of ball valve Procedures for the pressure test: 1 Check again whether the exhaust valve and the ball valve are closed; 2 Close the NO.7 Ball Valve; 3 Refer to 5-2-6 for example, using a bellows to connect the manifold inlet and outlet and open all mini ball valves on the
water distributor
- 17 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance 4 Connect the air pipe to any fast plug-in interface, and close the corresponding ball valve.
Port of air pump
Mini ball valve Bellows
Close this ball valve Figure 5-2-5 System - ball valve for connecting pipelines 5 Use an air compressor to press to 7 bar, keep the pressure for more than 30 minutes, and check for leakage; 6 Key sites for inspection are as follows: a Connection between the fast connection-peg and the mini ball valve; b Joint between the quick plug ball valve and the bellows; c Connection between the mini ball valve and the water separator; d Connection between the fast-plug connector and the computing equipment; e Flange/chuck/thread/welded joints.
Computing equipment Chuck connection
Figure 5-2-6 System - chuck connection
- 18 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Flange joint
Thread joint Welded joint Figure 5-2-7 System - Flange/thread/welded joints 7 The check methods are as follows: a Seeing, hearing and touching are applicable to leakage inspection. b Choose one of soap, washing powder and detergent, add water to one of them to make soapy liquid and apply it to the suspected leakage points, especially at the connections. The part with bubbles is the leak point. 8 Repressurization After the high-calculus server is online, it needs to be checked again for gas-liquid mixture, pressure 7 bar, stable for more than 2h, and check whether there are leakage points in the above 5.3 The system filled with coolant System rehydration consists of four steps: 1 Preparation: prepare materials and tools and open all exhaust valves of the system; 2 System fluid replenishment: use self-priming pump and fluid replenishment pump to replenish the system; 3 Replenishment of water tank: replenish the water tank with the cooperation of self-priming pump and replenishment pump; 4 Regular replenishment: self priming pump and replenishment pump can be used together, or the manual replenishment port on the top of the water tank can be used to replenish the water tank; Step 1: preparation 1 Get the coolant ready. 2 Connect the external pipeline according to the ANTSPACE field installation manual; 3 Check if the automatic exhaust valves or the ball valves on the internal and external pipes of the container are opened. (See Figures 5-3-1 through5-3-3); 4 Open the top exhaust valve of the water tank and install the chuck, ensuring that the tank is connected to atmospheric pressure. (See Figure 5-3-2).
- 19 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance NO.2 Air Vent Valve
NO.1 Air Vent Valve

Automatic breathing valve

NO.4 Air Vent Valve NO.3 Air Vent Valve

Figure 5-3-1 Internal container - automatic exhaust valve NO.6 Air Vent Valve
NO.5 Air Vent Valve

Figure 5-3-2 Manifold-Air Vent Valve - 20 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance Automatic exhaust valve
Figure 5-3-3 External connecting pipelines - automatic exhaust valve Step 2-3Procedures for the coolant charge:
1 A self-priming pump must be installed outside the containerThe self-priming pump needs to inject liquid into the pump head for the first time. Find the port for coolant charge outside the container (at the side door of the container), plug in the hose, and clean it. External coolant is added into the suction port of the self-priming pump. (see Figure 53-4)
Charging opening Charging hose
Figure 5-3-4 Pump station - charging hose Note: the recommended brands and parameters of self-priming pumps are as follows: (i) Nanfang pump 25qy-2, rated flow 2m3 / h, rated lift 40m, motor power 1.1kw, electric system 380V / 50Hz; (ii) Lingxiao pump bjz150, rated flow 3m3 / h, rated lift 30m, Output Power 1KW, electric system 380V / 50Hz; (iii) Nanfang pump 32zw (f) 5-20, rated flow 5M3 / h, rated head 20m, motor power 1.5kw, electric system 380V / 50Hz;
- 21 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

NO.2 Pressure Gauge

Filling pump NO.9 Ball Valve

NO.8 Ball Valve

NO.7 Ball Valve Figure 5-3-5 Pump station - charging valve

NO.6 Ball Valve

Manual liquid filling port

Safety valve

Liquid level meter

Figure 5-3-6 Pump station - liquid level meter 2 Close NO.8 Ball Valve and NO.6 Ball Valve as shown in Figure 5-3-5, open NO.7 Ball Valve, click on the filling
pump on the touch screen interface, and turn it on. The refilling pump can be used for refilling both the system and the water tank. If the valve handle is parallel to the pipeline, the valve is in the open state; if the valve handle is perpendicular to the pipeline, the valve is in the closed state. 3 When the system is filled with liquid, if the static pressure reaches more than 0.7 bar (Refer to figure 5-3-7 for touch screen readings), the circulating pump can operate for 10 seconds, and then it should be stopped. 4 Continue to add liquid. Repeat twice to ensure that 1.3 to 1.5 tonnes of coolant is added. 5 When the static pressure reaches 1.0 bars, stop adding coolant(Just observe the reading of the pressure sensor on the main interface, as shown in figure 5-3-7 below).
- 22 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Figure 5-3-7 pressure sensor reading on main interface 6 Then open the circulation pump again, circulate the medium in the system, ensure that the exhaust valves are all
opened. 7 Then open NO.6 Ball Valve, close NO.7 Ball Valve, click on the refilling pump on the touch screen interface, and
turn it on. Fill the water tank with coolant, and stop refilling coolant when the level gauge in the water tank reaches more than 2/3 (see Figure 5-3-6 for the location of the level gauge). 8 Close NO.9 Ball Valve and NO.6 Ball Valve outside the container, and open NO.8 Ball Valve and NO.7 Ball Valve. 9 After the above operation is completed, the system back pressure (1# pressure gauge/return pressure sensor) will be stabilized at 1-1.5 bar for normal operation. Step 4Regular replenishment of water tank When the water tank needs to add a small amount of coolant, you can open the top exhaust valve of the water tank to install the chuck (see 5-3-6), and manually add coolant to the water tank from the manual feeding port. Note: If the valve handle is parallel to the valve, the valve is in the open state; if the valve handle is perpendicular to the valve, the valve is in the closed state. 5.4 Electrical wiring There are two 500 kW PDC inside the equipment. In order to ensure the safe and stable operation of the equipment, two three-phase five-wire cables carrying 500 kW should be prepared on site in advance (no specification is specified). The two cables are respectively connected via the upper two holes on one side of the exhaust fan of the container, see Figure 5-4-1.Note: the rainproof cloth and rainproof cover in the accessories shall be used for protectionThree-phase cables are connected to the top of two PDC. The zero line enters to the top of PDC, extends to the zero line row where it is installed and fixed with screws.
- 23 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

Cable inlet hole

Cable inlet hole

Figure 5-4-1 Cable inlet hole Both sides of the container have grounding studs, and PDC must also be grounded securely. Therefore, ensure that both the container shell and PDC shell are grounded securely. When leaving the factory, the phase sequence of the equipment has been determined. After the equipment arrives at the site, it only needs adapt to the phase sequence of the on-site substation. The operation is as follows: connect the three-phase power of the substation to the distribution cabinet, power on the electric control cabinet, and observe whether there is power failure; In case of power failure, please adjust the phase sequence connected to the electric cabinet; If there is no fault, it can operate normally. The cooling tower is separated from the container, and above the cooling tower are three cooling fans and a spray pump, as well as a liquid level sensor. After the cold tower is fully secured on top of the container, connect cables to four motors and one sensor. After the cold tower is fully secured on top of the container, connect cables to four motors and one sensor as shown in Figure 5-4-2.Five wires have been reserved. The sequence of the three cooling fans is not specified, but their wiring sequence is U, V and W (from left to right), the location of cooling fan as shown in Figure 5-4-3. Among them, cable trough is reserved at the top and side of the cooling tower, and the cables need to be arranged along the trough . The wiring sequence of the spray pump is also U, V and W (from left to right). The position for the liquid level sensor has been reserved. Find the npt1
- 24 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance / 2 nut and gasket from the cooling tower spare parts box, remove the cooling tower air inlet grid, install the liquid level sensor from inside to outside, and install the liquid level sensor as shown in figure 5-4-4 below.
The indicator point (depression) upwards required Materials for the liquid: SUS304 Installation: Mount horizontally from the outside Mounting size: 1/2'' internal thread Figure5-4-2 Liquid level sensor

Cooling tower cooling fan (three in total)

Figure 5-4-3 Location of cooling tower cooling fan - 25 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Level switch
Figure 5-4-4 Installation diagram of liquid level sensor 5.5 System power on and power off process The switches in the electric cabinet are shown in the figure below:
MCB17
MCB17 MCB-DC1DC2DC3
Figure 5-5-1 ECC 5.5.1 Function description of circuit breaker in the system
Table 6-5-1 Function description of circuit breaker in electric cabinet - 26 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

Switching components (No.) MCB17 MCB18
MCB-DC1
MCB-DC2
MCB-DC3 MSS6
MCB-31

function
Main switch of system control power supply and pump station power supply. The system controls the switch of power supply. After the switch is powered on, the system has AC220V power supply. Switch of DC24V power supply in the system. After the switch is powered on, the sensor in the system can read the signal and upload it to PLC; The touch screen is also powered on, which can control the system from the touch screen end. Switch of DC12 power supply in the system. After the switch is powered on, the face recognition and door magnet in the system are powered on; You can open the door by scanning the face. Switch of DC5V power supply in the system. When the switch is powered on, the camera and main control module in the system are powered on. The circuit breaker is a short-circuit protection switch at the front end of the frequency converter, mainly to prevent the frequency converter from overload. The circuit breaker is a switch in the electric control cabinet that is responsible for disconnecting the excitation coil of mcb17. When the single circuit breaker is closed and the emergency stop button on the container door is pressed, mcb17 is disconnected and the electric control box is powered off.
Table 6-5-2 Function description of circuit breaker in distribution cabinet A

Switching components (No.)

function

MCB-A1

Main switch of distribution cabinet A

MCB-B1

Pre protection switch of surge protector

MCB-15

Supply power to the switch in distribution cabinet A

MCB-21

Supply power to the electric energy meter in distribution cabinet A

MCB1-1~MCB7-15

Power the computing unit on one side of the container.

The circuit breaker is the excitation coil switch in distribution cabinet A, which is

MCB-30

responsible for disconnecting MCB-A1. When the single circuit breaker is closed and the emergency stop button on door of distribution cabinet A or container door is pressed,

MCB-A1 is disconnected and distribution cabinet A is powered off.

Table 6-5-3 Function description of circuit breaker in distribution cabinet B

Switching components (No.)

function

MCB-A2

Main switch of distribution cabinet B

MCB-B2

Pre protection switch of surge protector

MCB-16

Supply power to the switch in distribution cabinet B

MCB-22

Supply power to the electric energy meter in distribution cabinet B

MCB8-1~MCB14-15 Power the computing unit on one side of the container.

The circuit breaker is the excitation coil switch in distribution cabinet B, which is

MCB-32

responsible for disconnecting MCB-A2. When the single circuit breaker is closed and the emergency stop button on door of distribution cabinet B or container door is pressed,

MCB-A2 is disconnected and distribution cabinet B is powered off.

5.5.2 Precautions for the first power on of the system

After the wiring of the whole system is completed, the unit can be powered on for commissioning.

However, before power on, it is also necessary to use a multimeter to measure whether there is a short circuit between phases,

between phases and zero, between phases and ground and between zero and ground of the two power supplies. If not, it means

- 27 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
that it can be powered on normally. If there is a short circuit in any of the above items, the fault shall be found out first and then powered on. After the front-end of the system is powered on (the system itself is not powered on), it is also necessary to measure the voltage of the front-end to see whether it meets the power requirements of the equipment. The power requirements of the equipment are: AC415V± 5%, 60HzUL/ AC400V± 5%, 50HzCE. 5.5.3 System power on sequence 1: First, power on the electric cabinet: When the electric control cabinet door is opened, first open MCB17, then MCB 18 and MSS6, and then open the circuit breaker at the front end of the frequency converter. MCB -DC1, MCB -DC2 and MCB -DC3 are 24V, 12V and 5V DC switches. After power is applied, ensure that the three switches are on. At this time, the screen on the cabinet door and the PLC begin to work. When the electric control cabinet door is closed and the system needs to be powered on, first open the protection switches in the cabinet MCB18, MSS6, MCB-DC1, MCB-DC2, MCB-DC3 and the front end of the frequency converter, then close the cabinet door and open MCB17 through the cabinet door operating handle. At this time, the device is powered on. Trained electricians can operate the system through the touch screen, set parameters, modify threshold, change operation mode (automatic / manual), start and stop a motor separately or operate automatically. At this time, the liquid cooling system can be operated first to control the liquid supply temperature within the required temperature range, and then the conditions for starting the calculation unit can be met. 2: After the electric cabinet is powered on, the conditions for starting the computing unit can be met only when the liquid supply temperature is maintained near the target temperature according to the operation process of the control system. At this time, the circuit breakers in distribution cabinets A and B can be opened to power on the computing unit. The power on sequence of distribution cabinet is as follows: First open MCB-A1 and A2, then MCB-15, 16, 21, 22, B1 and B2, and then start rows of computing units in order as required. Since there are 210 computing units in total, there are 14 rows in total. When starting a computing unit, start the next row at an interval of 20s after starting a row (15 computing units), and so on. 5.5.4 System power-off sequence When the system needs to be powered off for some reason, first disconnect the power supply of the computing unit according to the requirements, in order to ensure that the water temperature of the computing unit is consistent before and after power failure, which is equivalent to protecting the power module of the computing unit.
- 28 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance When the computing unit is powered off, manually stop the liquid cooling system through the touch screen. At this time, the water temperature will rise slightly, but it has no impact on the system. Finally, disconnect the main power supply of the electric control box and distribution cabinet to make the whole system completely powered off. The above practice is the behavior of safe power failure. However, in case of serious fault in the system, you can directly press the emergency stop button on the inner door of the container to make the main circuit breaker of the distribution cabinet and the main circuit breaker of the electric control box trip instantly, so as to make the system in a complete power-off state, which is convenient for professionals to carry out maintenance work. 5.5.5 Division of personnel responsibilities Responsibilities of general operation and maintenance personnel: General power on and power off (disconnect or combine circuit breakers), system startup and shutdown (touch screen key operation), network cable detection and exchange. Professional electrician responsibilities: General power on and power off work (disconnecting or combining circuit breakers), system startup and shutdown (touch screen key operation), network cable detection and exchange. When the equipment has short circuit, phase loss, reverse phase, no indication of sensor, no response of corresponding equipment after circuit breaker closing and abnormal 5.6 Screen display 5.6.1 Main screen display After the screen is powered on, the screen displays as follows:
Figure 5-6-1 Main screen display The main screen displays the unit control mode "automatic / manual", target temperature (settable), total fault display and analog quantity display. The system can set the operation control mode of the unit through the main screen. Manual control is used for commissioning and automatic control is used for system operation. When the system needs to run automatically, it is necessary to ensure that the pressure in the system is higher than 0.05Mpa, and then all parameter settings in the parameter setting screen have been set. Then click "one key start" in the
- 29 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance main screen, and the motors in the system will be executed according to the automatic control logic sequence. When it needs to be closed, please click "automatic stop" in the main screen. 5.6.2 Manual control screen When the unit needs to add liquid for commissioning, the unit control mode needs to be adjusted to the "manual" position, and then enter the "manual control" screen, as shown in the following figure:
Figure 5-6-2 Manual control screen At this time, the motor and frequency converter to be operated can be inched. Generally, when the system is filled with liquid, it is necessary to manually start the make-up pump and circulating pump. However, before starting, it is necessary to ensure that the running direction of the motor is correct. Therefore, after power on, turn on the 1# exhaust fan and observe its running direction. When the wind blows out of the container, it indicates a positive rotation. Before the equipment leaves the factory, all motors have been debugged and rotate forward. Therefore, you only need to observe the running state of one motor. When the motor reverses, it is necessary to phase adjust the three-phase power input to MCB17, that is, change the phase sequence of two cables. 5.6.3 Parameter setting screen The parameters in the system have been set, and its screen is as follows (it will be displayed in the real screen):
Figure 5-6-3 Parameter setting screen Real parameter setting value, please follow this setting.
- 30 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance 5.6.4 Alarm display screen After the system runs, if there is a fault in the system, it will be displayed in this screen.
Figure 5-6-4 Alarm display screen After a fault occurs, the alarm sound will sound. You can click "Silence" to first analyze the cause of the fault, then troubleshoot the fault, and finally click "reset" on the screen. 5.6.5 Historical alarm screen The alarm information in the system will be saved in this screen with time record, which is convenient for the user to find the time of failure.

5.6.6 Data curve screen

Figure 5-6-5 Historical alarm screen

The information of liquid supply temperature, liquid return temperature, liquid supply pressure, liquid return pressure and liquid supply flow can be displayed in this screen. Each analog quantity corresponds to a different color.

- 31 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Figure 5-6-6 Data curve screen Figure 6-6-7 temperature curve
Figure 5-6-8 Pressure curve Figure 5-6-9 Flow curve - 32 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
5.6.7 Power and positioning picture The screen can display the ambient temperature in the three cabinetsthe power used by the two distribution cabinets, and the longitude and latitude of the equipment. Among them, power information and longitude and latitude information are used for debugging and display, and the reading format is float type.

Figure 5-6-10 Power and positioning 6. Common faults and troubleshooting methods of ANTSPACE HK3

Fault type
Electricity failure
Low liquid level alarm
Circulating pump failure
1#/2# Exhaust fan failure

Table 6-1 List of common equipment faults and troubleshooting methods

Cause Analysis 1: Phase failure

Solution 1: Check whether the main power supply lacks phase

2: Overvoltage

2: Turn off the upper-level air switch MCB-C (in the power distribution cabinet) to ensure that the electric control box is not charged, and use a flatblade screwdriver to increase the overvoltage value

3: Undervoltage

3: Turn off the upper air switch MCB-C (in the power distribution cabinet) to ensure that electric control box is not charged, and use a flat-blade screwdriver to adjust the undervoltage value

4: Wrong phase

4: Adjust the phase sequence of the power line of power distribution cabinet connected to the electric control box

The water tank level in the container is low

Replenish the water tank in the antsapce

Idling of the pump, underpressure (low return pressure), etc. lead to overcurrent
in the circulating pump

1: First turn off the air switch (MCB17) in the electric control box; 2: Reset the thermal relay (corresponding to FR1) in the electric control box (manually press RESET in the thermal relay); 3: Check whether the operating parameters of the system are normal (pressure and flow will report failure first), and troubleshoot the problem according to the alarm failure; 4: After an interval of 2-3 minutes, turn on the circulating pump

Excessive current of exhaust fan 1: First turn off the air switch (MCB17) in the may entrain strips in the fan electric control box;

Remarks

- 33 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

Refill pump failure
Spray pump failure
1# cooling fan failure
2# cooling fan failure
3# cooling fan failure
Leakage alarm
Low cooling tower liquid level alarm

blades, hindering the operation of fan
1: Dirty blockage of the fluid replacement Y-type filter causes
overload
2: The position of suction port of the refill pump is too low, resulting in overload
The water tank suction inlet filter is dirty, causing overload
Excessive current of the exhaust fan may entrain strips in the fan blades, hindering the operation of
the fan
Liquid leaked from liquid inlet and outlet of the miner to the floor, soaking the liquid leakage
sensor
The water level in the cooling tower decreases

2: If there is debris in the fan blade, clean the debris first; if there is no debris, and the fan fails for no reason, operator needs to contact the manufacturer 3: Then reset the thermal relay in the electric control box (1# exhaust fan corresponds to FR21; 2# exhaust fan corresponds to FR22) (manually press RESET in the thermal relay); 4: Turn on the exhaust fan after an interval of 2-3 minutes 1: First turn off the air switch (MCB17) in the electric control box; 2: Reset the thermal relay (corresponding to FR3) in the electric control box (manually press RESET in the thermal relay); 3: Clean the Y-type filter; 4: After an interval of 2-3 minutes, turn on the rehydration pump 1: First turn off the air switch (MCB17) in the electric control box; 2: Reset the thermal relay (corresponding to FR3) in the electric control box (manually press RESET in the thermal relay); 3: Make external suction port lower than the coolant tank; 4: After an interval of 2-3 minutes, turn on the refill pump 1: First turn off the air switch (MCB17) in the electric control box; 2: Reset the thermal relay (corresponding to FR4) in the electric control box (manually press RESET in the thermal relay); 3: Check if the filter in the cooling tower water tank is dirty and blocked, clean it if dirty; 4: After an interval of 2-3 minutes, turn on the spray pump 1: First turn off the air switch (MCB17) in the electric control box; 2: If there is debris in the fan blade, clean the debris first; if there is no debris, and the fan fails for no reason, please contact the manufacturer; 3: Then reset the thermal relay in the electric control box (1# fan corresponds to FR51; 2# fan corresponds to FR52; 3# fan corresponds to FR53) (manually press RESET in thermal relay); 4: Turn on the cooling fan after an interval of 2-3 minutes. 1: Find the location where there is liquid on the floor; 2: On the top of this part, carefully look for liquid leakage from the liquid inlet and outlet of the miners; 3: After finding the leaking part, replace quick plug and replace the bellows, then clean the leaking site, and wipe the leaking monitoring tape to dry.
Replenish the cooling tower in time and reset the fault

After the system is powered on, the spray pump cannot be idling without liquid in
the system
After the cooling tower liquid level low alarm occurs, the system starts timing. After about 50 minutes, the spray pump

- 34 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

High liquid supply
temperature alarm
High supply liquid
temperature alarm
High supply pressure alarm
Low return pressure alarm
Low supply flow alarm
Condensation alarm
Pressure fluctuations
No pressure display
The pump is running but the

1: The cooling fan does not run
2: The spray pump does not run
3: The temperature sensor is damaged
4: The water level of the cooling tower is abnormal
After the high liquid supply temperature alarm occurred, the
operation and maintenance personnel did not deal with it in time, causing the liquid supply temperature to continue to rise
1: The filter is clogged 2: The supply and return valve is
faulty or not fully opened 3: Pressure sensor failure 1: The water tank is short of liquid 2: Refill pump failure 3: Pressure sensor failure 4: Leakage 1: The supply and return valve is faulty or not fully opened 2: The filter is dirty and blocked 3: Flow sensor failure 4: Leakage
Environmental humidity is high
1: There is air in the system
2: The system is short of fluid
3: The sensor is damaged 1: The sensor is damaged
2: The cable is loose 3: The PLC acquisition channel
is damaged 1: There is air at the suction port
of pump

Check whether the fan is running normally, check whether the power supply circuit of the fan is normal Check whether the spray pump is running normally, and check whether the power supply circuit of spray pump is normal Replace the temperature sensor; the high alarm value of liquid supply temperature can be set on the screen as required Check the water level of the cooling tower to ensure normal water replenishment Before finding out the cause, consider shutting down some mining machines, reducing the load, and then looking for the cause of high liquid supply temperature alarm; The alarm value for high liquid supply temperature can be set according to the needs on the screen Cleaning the filter element
Open the supply and return valve
Replace the pressure sensor
Refill the water tank
Check the cause of the failure of refill pump Replace the pressure sensor Check the system for leaks
Open the supply and return valve
Clean filter element Replace the flow sensor Check the system for leaks
After on-site operation and maintenance checks the alarm information, it is only necessary to increase the target value of liquid supply temperature by 5°C to prevent condensation.
Require on-site operation and maintenance personnel to open the exhaust valve to exhaust If the return pressure is lower than the set value, the refill pump will automatically refill the system Replace the sensor Replace the sensor Check the wiring circuit of the pressure sensor and tighten it Change the acquisition channel or change the PLC Use a wrench to open exhaust port above the suction port of the water pump, wait until there is even liquid flowing out, and repeat 2-3 times

stops spraying. In order to prevent the miner from overheating due to the spray pump stopping spraying, please replenish the cooling tower in time after the alarm.
The logic set in the program is as follows: when the dew point temperature value> the supply temperature value -5, the system will prompt a condensation alarm.

- 35 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

flow is insufficient
Fan does not run
Noise and abnormal sound
Water pump shaft seal leakage

2: The filter is clogged 3: The system is short of liquid
(low return pressure) 1: Motor burns out
2: The cable is loose
3: Air switch tripped
1: Water pump cavitation
2: Pump shaft connection problem
3: Insufficient lubrication of motor shaft
4: Safety valve action

(refer to the maintenance manual for specific operations) Clean the filter element
System rehydration
Replace the fan In the case of electrification, use a multimeter to check the power supply of fan, and tighten it in the case of power failure Close the air switch Detect the pressure on the suction side (return pressure or pressure gauge) and refill in time Check the mechanical connection of the pump shaft
Add lubricating oil
Check if there is too much liquid in the water tank to release the pressure in time, and drain the excess liquid in the water tank
Replace the water pump shaft seal

7. Maintenance of ANTSPACE HK3
7.1 Introduction
Preventive maintenance is to reduce the probability of product failure or prevent functional degradation, and is to be done according to the scheduled time interval or in accordance with the specified standards, mainly including adjustment, regular inspection and necessary repair. Through preventive maintenance, equipment maintenance technicians and operators can be familiar with the product performance, structures, principles, methods of use and precautions, so that the equipment can play its due function. Good maintenance ensures that the equipment is in good working condition. 7.2 Preventive maintenance
7.2.1 Monitored by operators When using the equipment, operators should monitor its status to discover potential faults. Once the operator discovers the system has the fault alarm, he should carry on the fault confirmation and inspection quickly, and finds the fault cause. 7.2.2 Inspection during use of the equipment When using the equipment, the operator shall conduct a qualitative check according to the plan to determine whether the
product performs its specified functions.
a) Check whether the liquid supply and return pipelines and power circuits are properly connected.
Inspection requirements: all pipelines and connections shall be free of leakage and cables shall be free of damage;
Inspection method: visual inspection;
b) Check whether the liquid return pressure (back pressure) is low, and timely refill the coolant.

- 36 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance Inspection requirements: the return pressure value is higher than 0.05Mpa (observe the main interface of the touch screen or 1# pressure gauge). If the pressure is lower than this value, it needs to be replenished. Inspection method: visual inspection and data comparison. c) Check the liquid supply system and record the temperature and pressure data every half day. Inspection requirements: record the data of liquid supply / return temperature, liquid supply / return pressure and liquid supply flow, and observe whether the data tends to be stable in long-term operation. Inspection method: visual inspection and data comparison. d) Check the fault alarm of the system, such as temperature, pressure, flow, etc. (the above fault state is displayed on the fault alarm screen of the touch screen), and record it every half day.
Inspection requirements: check the system alarm points and conduct troubleshooting according to the instructions; Inspection method: visual inspection and as required. 7.3 Scheduled maintenance 7.3.1 Maintenance of Y filter The system is divided into inner circulation and outer circulation. The inner circulation medium is coolant, and the outer circulation medium is tap water. The system has been set filtration of the internal and external circulation. When the system runs for a period of time, the filter needs to be cleaned. There are three filters, and their corresponding cleaning time requirements are as follows: 1) Spray pump suction filter of cooling tower: the cleaning cycle is once a month. 2) Y-type filter of inner circulation in the liquid supply system of the pump: the cleaning cycle is once every six months(On Demand). 3) Y-type filter of inner circulation in the liquid replenishment system of the pump: the cleaning cycle is once a year. Cleaning method: wash it with water, rinse it and air dry it before use. Replacement steps: a Cut off the main power supply of the equipment; b Locate and close the butterfly repair valve in the system shown in Figure 8-3-2, unscrew the plug on the filter end cover, and partially drain the pipeline; c Locate the position of the Y-type filters in Figures 8-3-1 and 8-3-2.
- 37 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

Butterfly repair valve 2

Butterfly repair valve1 Y-type filter of the system

Figure 8-3-1 Positions of the butterfly repair valve and the Y-type filter in the pipelines d After finding the filter, unscrew the cap on the filter with an adjustable wrench.

Filter element Drainage tooling

Figure 7-3-2 View of filter - 38 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Filter element
Figure 7-3-3 Schematic diagram of filter cap unscrewed Sealing gasket End cover of the filter
Figure 7-3-4 Schematic diagram of filter cap e Remove the filter inside the filter for cleaning (or replacement) Installation methods: a Install the cleaned filter screen and tighten the filter cover with a wrench. b Power up the equipment and charge coolant into the system. Note: the gasket on filter cover should not be damaged. 7.3.2 Pipeline leakage maintenance When the equipment runs for half a year, the pipe network should be checked for leakage. If leakage is found, the equipment should be stopped immediately for maintenance. During maintenance, the operation of the client load device should be stopped first, and then the unit should be stopped. After the completion of leak detection, the system shall be replenished. 7.3.3 Maintenance of electrical components After the equipment runs for half a year, it is necessary to check and maintain the wiring terminals and crimping screws on the electrical components of the electric control box inside the water pump cabinet to prevent wiring terminals and crimping screws from loosening, resulting in poor contact and damage of components, and abnormal operation of the unit, thus affecting the work of the whole liquid cooling device.
- 39 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
7.3.4 System sewage discharge After two years of operation of the system and the water tank, there may be some sundries in the system pipelines, so the sewage in the system should be discharged in a timely fashion. Sewage discharge steps: a Locate the position of NO.1-3 Ball Valve and NO.9 Ball Valve. (See Figure 8-3-5)

NO.3 Ball Valve

NO.2 Ball Valve

NO.9 Ball Valve
NO.1 Ball Valve
Figure 8-3-5 Filling/discharging valve for the pump station inside the container b Connect the drain hose to No. 2 ball valve and No. 3 ball valve, tighten with a hose clamp; Lead the hose out of the unit and open No. 1-3 ball valve and No. 9 ball valve to drain the system. 7.3.5 Checking of the liquid level in the water tank The system monitors the liquid levels in two water tanks (in the container and in the cooling tower). When the liquid level in the water tank is lower than the required value, a sound and light alarm on the touch screen of the system will go off to indicate the low water level in the water tank. In this case, the fault should be checked and the liquid should be replenished in a timely fashion. But even if the alarm does not go off for the tank level, the tank level should be checked regularly. The water tank level in the container must be checked once a week after stable operation. If the liquid in the water tank cannot reach 2/3 of the water tank, it is necessary to replenish liquid in a timely fashion. The water tank level of the cooling tower should be checked once a day, and shortage of water is not allowed, unless air cooling mode is adopted in winter, in which case the water inside the cooling tower needs to be emptied.
- 40 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance
Water tank in the container

Figure 7-3-6

Water tank in the cooling tower
Water tanks in the container and in the cooling tower

7.3.6 Maintenance of coolant

1 As the core unit of ANTSPACE Liquid Cooling System, it is recommended to track and test the coolant regularly, at least

once half year.

2 When purchasing coolant, pay attention to the relevant parameters in Table 8.3.1.

3 The coolant should be tested regularly with a focus on the pH value. It is not recommended to use the coolant when the pH

value is lower than 7 (a pH indicator can be added to the coolant. When the pH value is lower than 6.8, the coolant will change

color for easy observation). The detection methods are shown in the table below.

4 Freezing point, glycol ratio, total hardness, etc. should be tested. Pay attention to the content of aluminum, ferrum, copper

and other elements. If the content of these elements increases, it means that contact corrosion has been produced. The detection

methods are shown in the table below.

5 It is recommended to periodically add corrosion inhibitors to the antifreeze solution according to the requirements of the

supplier.

Items Color
Appearance
Freezing point Boiling point
PH value Reserve alkalinity Total hardness
Content of main elements

Table 8-3-1 Recommended standards for testing coolant

Physical and chemical indicators

Recommended reference standards for testing

Significant color

Visual inspection

No peculiar smell, no precipitation, no suspended matter

Visual inspection

-45 (low temperature)

108 (low temperature)

7-9

 4 ml (Organic formula)

 9 ml (Inorganic formula)

< 120 mg/l

B

<20 mg/kg

Si

<20 mg/kg

P

<20 mg/kg

Mo

<20 mg/kg

- 41 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

Ca

<20 mg/kg

Al3+

<50 mg/L

Fe2+

<50 mg/L

Cu2+

<50 mg/L

Note 1: Table 7-3-1 is for the working environment temperature is lower than 0  working conditions need to use the media

requirements, if the working environment temperature is higher than 0  for a long time, you can use deionized water as

the secondary side of the internal circulation medium, the corresponding media requirements are shown in Table 7-3-2.

Note 2: To ensure reliable long-term operation, the internal coolant needs to be replaced every 1 to 2 months when deionised/

or pure water is used as the internal circulation medium.

Table 7-3-2 Recommended standards for deionized water

Items PH
Sulfide Sulfate

Deionized water 8.5-9.5 <1 ppm <10 ppm

Reference standard Intel 632983
TC9.9/Intel 632983 TC9.9/Intel 632983

Chloride

<5ppm

TC9.9/Intel 632983

Bacteria Total Hardness (as
CaCO3)

<100 CFUs/ml <20ppm

Conductivity

<20us/cmreference value

Residual solids after evaporation Turbidity

50ppm <20 NTU

TC9.9/Intel 632983 TC9.9/Intel 632983
TC9.9
TC9.9/Intel 632983 TC9.9/Intel 632983

High conductivity is not necessarily unacceptable, such as 1000US / cm,
because corrosion inhibitors and fungicides will increase water
conductivity. It is necessary to find out the reason for the sharp increase of conductivity trend during circuit operation.

Iron

0.1ppm

Industry standard

Copper

10ppb

Corrosion rate of carbon steel

3mpy0.075mm/a

Corrosion rate of

copper or stainless 0.2mpy0.005mm/a

steel

7.3.7 Maintenance of cooling tower

Industry standard GB/T 50050-2017
GB/T 50050-2017

After the cooling tower is put into operation, it is necessary to regularly check the operation, and pay attention to the following

points:

1 After the water enters the cooling tower, it must be strictly controlled. The damaged water pipes and nozzles shall be

replaced in time to avoid affecting the water distribution effect or damaging the water spraying device. If there are sundries, they

shall be removed in time;

2 The suspended solids content of spray water is generally controlled below 20mg / L. when the suspended solids content

increases, water quality treatment agent shall be added appropriately for treatment. Scale inhibitor shall be added during long-

term operation. See the following figure for water quality requirements (refer to GB / t-18430.1-2007). It is recommended to

replace the spray water twice a year:

Table 7-3-3 recommended standards for spray water

- 42 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance

Cooling water quality

Items

Reference value

Inclination

Corrosion

Scaling

PH value(25)

6.58.0





Conductivity(25)

S/cm

<800





Benchmark Cl-

mg(Cl-)/L

<200



term

SO2-

mg(SO2-)/L

<200



Acid consumption(pH=4.8)

mg(CaCO2)/L

<100



Total hardness

mg(CaCO3)/L

<200



Fe

mg(Fe)/L

<1.0



Reference S2-

term

NH+

mg(S2-)/L

none



mg(NH+)/L

<1.0



SiO2

mg(SiO2)/L

<50



Note:  Indicate factors related to corrosion or scaling tendency

3 If any abnormality is found in the fan system, it shall be shut down immediately for inspection and troubleshooting. The

blades shall be repaired or replaced according to the actual scouring and wear, so as to ensure that the cooling tower is in good

operation condition;

4 If excessive water loss is found during the use of the cooling tower, the manual replenishment device shall be used to

replenish water in time. In addition, check whether the water collector is damaged and whether the water collecting tank is

leaking;

5 It is required to clean the inside and outside of the tower once a year to prevent the accumulation of dirt from affecting the

smooth inflow of water.;

6 After the cooling tower is shut down, the residual water in the sump and pipeline must be vented. If the shutdown time is

long, the whole tower shall be inspected to ensure safe and normal operation next time;

7 Fillers, water collectors and other inflammables are strictly prohibited from contacting with open fire during use or

maintenance;

8 Under the freezing point temperature in winter, the system will switch to the dry cooling mode. At this time, it is necessary

to drain the residual water in the sump and pipeline to prevent equipment damage caused by icing;

9 The filter inside the sump needs to be cleaned once a month to prevent damage to the spray pump caused by dirty blockage;

10 PVC filler shall be flushed regularly and shall not operate when the cooling water temperature is higher than 50 .

8. Safety instructions of ANTSPACE HK3

If ANTSPACE Liquid Cooling System is not used for a long time, the main power supply should be turned off. ---- This will prevent accidents from happening. 1 Maintenance: Only qualified and authorized personnel are allowed to perform maintenance and other operations on electrical system; 2 Operation: 1ANTSPACE liquid cooling system in container shall be equipped with fire extinguisher before starting operation; 2The equipment must be properly grounded; after electric connection, the protective earthing resistance shall be verified to guarantee continuity, it shall be less than 0.3, otherwise, personal injury or death may occur; 3Only after stopping the equipment and turning off the power supply can the equipment be cleaned, otherwise electric shock or injury may occur. Do not clean the unit with water, otherwise electric shock may occur.

- 43 -

ANTSPACE HK3 Liquid Cooling System Operation and Maintenance 4Be sure to check whether the valve (if there is a valve) is open before starting the system; 5Safety operation of PDC and electric control cabinet: During the operation of PDC A, B and control cabinet, it shall be ensure that the cabinet door is in a locked state to prevent personal injury such as electric shock, while avoiding salt, moisture, dust or other conductive substances in the air from entering the interior of the cabinet. If power-on, it is prohibited to contact the cabinet internal single board, cables, terminals, modules, inductors and other devices to prevent safety accidents. If malfunctions occured, abnormal smell and sound, please power off main circuit breakers MCB-A1, MCB-A2 and MCB17 of three electrical cabinets. Or press the emergency stop button on the door of container, and two electrical cabinets. Otherwise it may lead to electric shock or fire accident. 3 Note: 1Non-professional authorized persons are forbidden to open the door of the electrical cabinets. 2The electrical cabinets door only can be opened when the main circuit breakers are located on the OFF position. Please read this instruction carefully before using this equipment. If you have any difficulties or problems, please contact the manufacturer for help.
- 44 -

