Duravit Freestanding Bathtub Mounting Instructions
Brand: Duravit
Product Type: Freestanding Bathtub
About the Mounting Instructions
These mounting instructions are part of the Duravit bathtub and should be read carefully prior to installation.
Explanation of Key Words and Symbols
Symbol | Meaning |
---|---|
ℹ️ | NOTICE: Describes damage that does not affect the person. |
?️ | Link to the mounting information in this section. |
?️ | Inspection (e.g. for scratches). |
⏱️ | Indication of the length of time (e.g. 10 minutes). |
❌ | Inspect to check for leaks and leak-tightness. |
Target Readership and Qualifications
The bathtub must only be installed by trained plumbing engineers.
NOTICE: Risk of product and/or property damage!
- Observe the local installation regulations and any country-specific standards at all times.
Mounting Instructions
Please read pre-installation data sheets prior to the installation. These are available to download on the Internet at www.pro.duravit.com.
Step 7: Positioning the Installation Aids
The bathtub drain is not located in the centre.
- Observe the dimensions from diagram 5/6 for the positioning of the installation aids.
Step 19: Using Silicone without Acetic Acid
- Use alkoxy-based silicone.
Product Series and Model Numbers
- Cape Cod: #700330, #700459
- DuraSquare: #700430, #700460
- Luv: #700434, #700461
- White Tulip: #700468, #700469, #700470
- Soleil by Starck: #700516
- Zencha: #700462, #700463, #700464
Installation Steps (Textual Description)
The following describes the installation process based on the provided diagrams.
Step 1: Initial Inspection
Visually inspect the bathtub for any damage, such as scratches. [?️ Inspection]
Step 2: Prepare Installation Aids
Position the necessary installation aids or support structures as shown in the diagram. [? Installation Aids]
Step 3: Drain Assembly Preparation
Prepare the bathtub drain fitting. [? Drain Fitting]
Step 4: Connect Drain Hose
Connect the drain hose to the fitting. [? Hose Connection]
Steps 5 & 6: Dimension Reference
Refer to the specific dimensions provided for different bathtub models (e.g., Cape Cod #700330, #700459). These diagrams show the bathtub outline with key measurements.
Step 7: Positioning Support Structures
Place the support structures or installation aids according to the diagram. [? Support Placement]
Steps 8 & 9: Lifting and Placing the Bathtub
Use straps to carefully lift the bathtub and place it onto the prepared installation aids. Ensure it is stable and correctly positioned. [? Lifting and Placement]
Steps 10 & 11: Drain Component Assembly
Assemble the components of the bathtub drain system.
Step 12: Mounting Frame Assembly
Assemble the mounting frame or support system for the bathtub. This involves connecting various parts to create a stable base.
Step 13: Final Drain Connection
Complete the connection of the drain system to the bathtub.
Step 14: Initial Water Fill
Fill the bathtub with water to check for leaks.
Step 15: Leak-Tightness Check (Initial)
Perform an initial check for leaks. The diagram indicates a required time of 10 minutes (⏱️ 10 minutes). A checkmark (✔️) signifies a correct procedure, while crosses (❌) indicate incorrect actions or potential issues like water damage.
Steps 16 & 17: Securing the Bathtub
Secure the bathtub in its final position. This may involve adjusting supports and ensuring stability.
Step 18: Second Water Fill
Fill the bathtub with water again.
Step 19: Extended Leak-Tightness Check
Perform an extended leak-tightness check. The diagram indicates a required time of 24 hours (⏱️ 24:00:00) and a measurement of 150 (likely related to pressure or water level, though not explicitly stated). This is a crucial step to ensure no leaks occur over time.
Step 20: Final Installation
The bathtub is now fully installed.